24.06.2020 Views

Exim Global

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

35 YEARS EXPERIENCE & CASE HISTORY

For setting up, installation and production we have specialized in Pumps, Engines, Trucks, and Oil & Gas Upstream. Centrifugal pumps and

boiler pumps were manufactured, set up, installed, and tested by us between 1984 and 1994 in Allweiler- German Egyptian factory. ICE “Internal

Combustion Engine” & applications as Pumping units were assembled in the KUBOTA Japan EGYPT factory between 1994 and 1995. Assembly

production line SKD “Semi knocked-down” & CKD “completely Knocked-down.” Trucks and line stations were set up, assembled, installed, and

tested in the CHRYSLER-TURKEY-EGYPT factory between 1995 and 1996 by our engineers.

We have specialized in Oil & Gas Upstream for drilling, completion, and well testing between 2000 and 2004, DST/ESP Exploration well in South

Sudan. We produced ASL “Artificial Lifts” by using ESP “Elekrikal Submersible Pumps”, CDPS “Cable Deployed Pumping System” and HPS

“Horizontal Pumping System”. ASL installation and operations were managed by us worldwide in Egypt, Iraq, Syria, Congo, Sudan, Yemen,

Kuwait & South-Sudan. Between1997-2014 in REDA-Schlumberger, ALKHORAYEF& NOVOMET, 2010-2011 in ALKHORAYEF-IRAQ co. and in

2013-2014 in NOVOMET co. South Sudan. CDPS was produced via casing without tubing in 1997-2004 Managing the production for ZAFCO-

EGYPT Co.

HPS produced in 1984-2004-WORLDWIDE in REDA- Schlumberger EGYPT, KUWAIT, YEMEN, and CONGO which included HPS – GNPC-SUDAN

reservoir injection projects in 2004. It was also produced in 2011 in Borets -Weatherford co.and in EGYPT & Congo. We also well tested and

Explored tested DST/ESP between 2000 and 2004 in the South-Sudan Tharjath location.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!