13.07.2015 Views

CENTRALES NUCLEARES NUCLEAR POWER PLANTS

CENTRALES NUCLEARES NUCLEAR POWER PLANTS

CENTRALES NUCLEARES NUCLEAR POWER PLANTS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

COFRENTESMarzo Acumulado Acumuladoen el añoa origenProducción bruta MWh 682.460 2.071.630 83.345.060Producción neta MWh 656.560 1.996.500 80.253.375Horas acoplado h 743 2.183 88.705,14Factor de carga o utilización % 92,78 95,86 85,05Factor de operación % 100 100 87,38Núm. de disparos no programados 0 3 73Núm. de paradas programadas 0 0 28Núm. de paradas no programadas 0 3 24JOSÉ CABRERAMarzo Acumulado Acumuladoen el añoa origenProducción bruta MWh 89.850 255.190 25.255.680Producción neta MWh 84.163 238.717 24.036.311Horas acoplado h 743 2.183 180.853,23Factor de carga o utilización % 75,58 73,06 65,69Factor de operación % 100 100 75,26Núm. de disparos no programados 0 0 125Núm. de paradas programadas 0 0 -Núm. de paradas no programadas 0 0 -STA. M. a DE GAROÑAMarzo Acumulado Acumuladoen el añoa origenProducción bruta MWh 0 476.343 69.933.879Producción neta MWh 0 454.724,3 66.321.751,2Horas acoplado h 0 1.153,83 163.377,35Factor de carga o utilización % 0 47,44 69,67Factor de operación % 0 52,86 74,87Núm. de disparos no programados 0 0 123Núm. de paradas programadas 0 1 33Núm. de paradas no programadas 0 0 52TRILLO IMarzo Acumulado Acumuladoen el añoa origenProducción bruta MWh 787.099 231396,8 59.661.070Producción neta MWh 739.710 2.176.056 55.808.693Horas acoplado h 743 2.183 58.731Factor de carga o utilización % 99,38 99,44 82,17Factor de operación % 100 100 85,30Núm. de disparos no programados 0 0 9Núm. de paradas programadas 0 0 11Núm. de paradas no programadas 0 0 16VANDELLÓS IIMarzo Acumulado Acumuladoen el añoa origenProducción bruta MWh 745.660 2.189.060 58.612.653Producción neta MWh 717.030,4 2.103.988 56.076.603Horas acoplado h 743 2.183 61.249,34Factor de carga o utilización % 99,96 99,88 80,83Factor de operación % 100 100 84,15Núm. de disparos no programados 0 0 29Núm. de paradas programadas 0 1 9Núm. de paradas no programadas 0 0 7tailored to European characteristicsthat can be licensed in any of thedocument’s sponsor countries, and itwill be the reference for light waterdesigns that are tendered in theEuropean market in coming decades.The part of document EUR that hasjust been published basically includesrequirements on which the utilitieshave reached a consensus inconnection with the nuclear island offuture plants. The utilities now intendto reach a consensus, on the basis ofthe EUR, with the regulatoryauthorities of their respective countriesregarding safety requirements that willbe required of future nuclear powerplants. In addition, in the second halfof this year, the European utilities planto publish the requirements regardingthe conventional part of the plant(volume 4).As regards the requirementscontained in the document, thefollowing is noteworthy:- The EUR addresses the differentadvanced light water designscurrently in existence, i.e. it dealswith both evolutive and passive PWRand BWR designs.- The document establishesrequirements tending to reduce evenmore the impact of future plants ontheir environment.- It advocates simplification of thedesign, operation and maintenanceof future plants, and a greaterautonomy of plant systems in termsof operator actions.- In order to improve competitivenessof future plants, the EUR encouragesdevelopment of standard designsthat can be built and licensed in thedifferent European Union countries.Also, the document establishes thecriteria to be taken into account inplant design, and the methodologiesand criteria that will be the basis forevaluating safety, operation and costof the different designs; it also setsforth functional requirements andspecifications for systems andequipment, requirements formaterials, criteria regarding the useof codes and standards, etc. Inaddition to saving on costs, thisstandardization is intended toprovide for more exchange ofoperating experiences between theplants.- The European utilities also considerthat the excellent availability valuesof current plants can be improvedeven more; therefore, the EURtargets an availability objective ofmore than 87% for future plants.- Since control of construction time iskey to the cost of a plant, the EURprovides for construction periods ofless than 60 months for new plants.Document EUR is, in short, an effortby the European utilities to ensure asafe, environmentally friendly andcompetitive electricity supply in thedecades to come. For this reason, theSpanish Electrical Sector throughDTN, a company in which all theSpanish utilities with nuclear interestshave a share (ENDESA, Iberdrola,Unión Eléctrica, Fenosa, FECSA,Compañía Sevillana de Electricidadand Hidroeléctrica del Cantábrico),has collaborated actively to make thiseffort succeed.DECLARAN AL LABORATORIO DEMETROLOGÍA DEL CIEMATDEPOSITARIO DE LOS PATRONESNACIONALES PARA RADIACIONESIONIZANTESEn la reunión del Consejo de Ministrosdel día 15.3.96, se aprobó el RealDecreto 533/96 (BOE nº 77, de 29 demarzo de 1996) por el que se declaraal Laboratorio de Metrología deRadiaciones Ionizantes del Centro deInvestigaciones Energéticas, Medioambientalesy Tecnológicas (CIEMAT)como depositario de los PatronesNacionales de las unidades de actividadde un radionucleido, exposición,Kerma y dosis absorbida y, al mismotiempo, se le declara también como laboratorioasociado al Centro Españolde Metrología en el campo de las radiacionesionizantes.En consecuencia, el Laboratorio deMetrología de Radiaciones Ionizantesdel CIEMAT será en adelante responsable,en nombre del Estado, de lacustodia, conservación, mantenimientoy difusión de los PatronesNacionales de dichas unidades. Esta

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!