13.07.2015 Views

CENTRALES NUCLEARES NUCLEAR POWER PLANTS

CENTRALES NUCLEARES NUCLEAR POWER PLANTS

CENTRALES NUCLEARES NUCLEAR POWER PLANTS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

T IIPLAN ESTRATEGICO “ZORITA XXI” / ZORITA XXI STRATEGIC PLANLÍNEAS DE ACCIÓN HITOS PRINCIPALES IMPLANTACIÓNCOURSES OF ACTION MAJOR MILESTONES IMPLEMENTATIONMANTENIMIENTO / MAINTENANCE Implantación REGLA DE MANTENIMIENTO / MAINTENANCE RULE Implementation Julio 97/July 97Reducción término fuente / Source Term ReductionPROTECCION RADIOLOGICA-ALARA Adaptación a la ICRP - 60 / Adaptation to ICRP - 60RADIOLOGICAL PROTECTION-ALARAPotenciación Cultura ALARA / Diffusion of ALARA CultureRESIDUOS / WASTE Ampliación capacidad foso combustible gastado/ Increased spent fuel pool capacity 97SIMULADOR (SGIZ) / SIMULATOR (SGIZ) Implantación en el emplazamiento CNJC / On-Site Implementation JCNPP Dic. 95/Dec. 95Incorporación otros sistemas y MD’s / Incorporation of other systems and MD’sFORMACION / TRAINING Desarrollo competencias estrategias P. Nuclear / Development of Nuclear P. strategic competences 95 - 2000Profundización recomendaciones UNESA (CEX-37) / In-depth study of UNESA recommendations (CEX-37)Dedicación: 3 semanas/año-persona / Dedication: 3 weeks/year-personMODIFICACIONES DE DISEÑO Sistema de instrumentación nuclear y SPDS / Nuclear instrumentation system and SPDS 97DESIGN MODIFICATIONS Nueva tapa de vasija / New vessel head 97Nueva torre de refrigeración / New cooling tower 96CALIDAD TOTAL / TOTAL QUALITYImplantación Sistema de Calidad Total / Total Quality Implementation(Modelo Europeo) / (European Model) 95 - 98Obtención Certificado ISO-9000 / Obtainment of ISO-9000 Dic. 96/ Dec. 98SISTEMAS DE GESTIÓN Sistema de Control de Configuración/ Configuration Control System 98MANAGEMENT SYSTEMSSistema integrado de gestión/ Integrated mangement systemLICENCIAMIENTO / LICENSING Resolución de pendientes / Resolution of pending licenses 96 - 97APS / PSA Revisión del APS / PSA Revision 96 - 97Ampliación del alcance del APS/ PSA scope extension 98GESTIÓN DE VIDA / LIFE MANAGEMENT Establecimiento Plan de Gestión de Vida / Life Management Plan Establishment Marzo 96 / March 96I+D. INNOVACIÓNParticipación activa continuada-2.000 / Continued active participationTECNOLÓGICA / R & D. TECHNOLOGICALPROYECTO HERMES / HERMES PROJECT Mejora operativa y productividad / Operating and productivity improvements 96The Cooling Tower civil work was performed in two phases:Phase I (February 1995):• Installation of an implant in existing circulation piping tobypass water flow toward the tower.• Installation of cutoff and isolation valves.Phase II:• Construction of a container to catch water for the coolingtower.• Laying of foundations for cooling tower cell structures.• Environmental impact study.Reduced power due to low Tagus River flow:The gradual drop in the Tagus river flowrate made itnecessary to reduce plant load to comply with thetemperature limits imposed on discharges to the river.1995 Inspections/Drills:The CSN performed 31 inspections on different areas of theplant during the year.The energy agency, EURATOM, carried out 6 inspectionsof fuel monitoring, fissionable material control and reactorfuel loading.Four fire drills, which are scheduled on a quarterly basis,were carried out to check and maintain personnel trainingand the good state of the equipmentIn addition, the annual Interior Emergency Plan drill wascarried out on 6 October.Implementation of the Interactive Graphic Simulator inZorita - SGIZ:An interactive graphic simulator was implemented duringthe 4th quarter of ‘95 in the JCNPP training center. Thissimulator employs graphic display on high resolution colormonitors.Graphic display includes 15 of the most relevant plantsystems, displaying the value of process variables and realtimeupdating of their dynamics.It can be used to analyze accidents by incorporating EOPscenarios, malfunctions and transients for purposes ofoperator training, and it also provides information onsystems and incident analysis to train the rest of thepersonnel.Technical Exchange Visits:The following organizations visited the Plant in November1995 for purposes of technical exchanges:ATUCHA NPP (Argentina), organized by WANO toESTADO ACTUALY PERSPECTIVAS - ZORITAFinalización de la torrede refrigeraciónEl programa de instalación de laTorres de Refrigeración tiene previstosu finalización y conexión con los sistemasde Planta para Abril de 1996,para lo cual se tiene programada unaparada de la Central para dicho fin.Plan estratégico Zorita XXISe presentó el 28 Septiembre 1995 alCSN el Plan Estratégico ZORITA XXI,formado por las líneas de actuaciónque se resumen en la tabla II:Para alcanzar el OBJETIVO de situar aCNJC en una posición que permita estaren siglo XXI en máximas condicionesde seguridad y eficiencia.Líneas destacablesa) ResiduosEn proceso de ampliación de la capacidadde la piscina de combustible, reracking,de la actual de 310 elementos(previsión de saturación 2001) hastaunos 520 elementos con previsión desaturación de la misma para el año2012.b) Calidad totalLa CNJC ha iniciado el proceso de preparaciónde la documentación para solicitarel certificado AENOR, ISO-9001.Prevista la presentación de dicha documentacióna finales del 1996.c) LicenciamientoSPDSEn la próxima recarga año 1997 se instalaráun Sistema de Visualización deParámetros de Seguridad (SPDS), a finde servir de ayuda a los operadores dela Planta en la evaluación del estado deseguridad de la misma y en la toma dedecisiones durante una situación deemergencia, habiéndose definido unas300 señales que permiten la presentacióngráfica de la información necesaria.d) Gestión de vidaRenovación de equipos y componentesmás relevantes:• Tapa vasijaLa nueva Tapa de la Vasija delReactor. En proceso de fabricacióncon previsión de instalación para la recargade 1997.• Sistema instrumentación nuclear(NIS)En la próxima recarga prevista para elprincipios del año 1997 se instalará unnuevo Sistema de InstrumentaciónNuclear (NIS), compuesto de 8 nuevascámaras de fisión para vigilancia delflujo nuclear y renovación completadel: cableado, penetraciones eléctricasdel RC, paneles de control y proteccionesen Sala de Control y una visualizaciónen panel de control del reactor(P4).El nuevo panel del NIS se encuentraen almacén de planta y se están realizandoalgunas pruebas preoperacionales.Renovación del PEPRenovación del Permiso de ExplotaciónProvisional por cuatro años.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!