12.07.2015 Views

universidad el bosque especializacion en anestesia cardiovascular ...

universidad el bosque especializacion en anestesia cardiovascular ...

universidad el bosque especializacion en anestesia cardiovascular ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

03/1997 Strategic Planning CourseEXPERIENCE AND BACKGROUNDSummary Employm<strong>en</strong>t HistoryDates Company Major DisciplineJan. 1988 to Dec. 1988Lytt<strong>el</strong>ton EngineeringWorksManufacturingJan. 1989 to March 1993 G<strong>en</strong>nan Systems (D<strong>en</strong><strong>el</strong>) System Dev<strong>el</strong>opm<strong>en</strong>tApril 1993 to April 1994 S<strong>el</strong>f employed SimulationsMarch 1994 to March 1998 Infoplan (D<strong>en</strong><strong>el</strong>) Information SystemDev<strong>el</strong>opm<strong>en</strong>t andMaint<strong>en</strong>anceApril 1998 to Curr<strong>en</strong>t Exig<strong>en</strong>t Eng. Consultants Eng & IT ConsultingDetail Employm<strong>en</strong>t HistoryJanuary 1988 to December 1988:Company: Lytt<strong>el</strong>ton Engineering Works (LEW).Post: Engineer in Training.Manager: Anton van WykLEW at that time was a manufacturing company involved in the weapons industry. Iwas primarily involved within the small arms manufacturing <strong>en</strong>vironm<strong>en</strong>t executingquality assurance and manufacturing process evaluation.The main emphasis was to <strong>en</strong>sure the continuous improvem<strong>en</strong>t of the overallmanufacturing process within the small arms factory and to <strong>en</strong>sure that the productionprocess was under statistical process control. I was part of a team <strong>en</strong>suring quality,including sample measuring, compiling quality reports/charts, evaluating qualityreports/charts, id<strong>en</strong>tifying out of control processes and initiating corrective actions.Studies were undertak<strong>en</strong> investigating the manufacturing process its<strong>el</strong>f as w<strong>el</strong>l asfactory layout; all investigations were aimed at improving the overall manufacturingprocess.Simulations were compiled to assist in the evaluation/improvem<strong>en</strong>t process. Isuccessfully dev<strong>el</strong>oped a simulation (in SLAM) interfacing to a spreadsheetapplication and a project managem<strong>en</strong>t application whish was utilized for schedulingfinal approval/inspection activities of the small arms factory.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!