12.07.2015 Views

Volumen 3 - Tomo 1 - Ministerio de Salud

Volumen 3 - Tomo 1 - Ministerio de Salud

Volumen 3 - Tomo 1 - Ministerio de Salud

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PRESUPUESTO DE LA COLECTORACOLECTORA VR-4 - ALTERNATIVA 5AN° Descripción Unidad Cantidad P. Unitario P. Total( B/. ) ( B/. )1 Tuberías <strong>de</strong> PVC1,1 <strong>de</strong> 8 " Ø m 137 36,00 4.932,001,2 <strong>de</strong> 10 " Ø m 169 40,00 6.760,001,3 <strong>de</strong> 12 " Ø m 301 70,00 21.070,001,4 <strong>de</strong> 15 " Ø m 0 112,00 0,00sub-total 32.762,002 Tuberías <strong>de</strong> H.A2,1 <strong>de</strong> 18 " Ø m 0 110,00 0,002,2 <strong>de</strong> 21 " Ø m 0 121,00 0,002,3 <strong>de</strong> 24 " Ø m 0 135,00 0,002,4 <strong>de</strong> 30 " Ø m 0 192,00 0,002,5 <strong>de</strong> 36 " Ø m 0 243,00 0,002,6 <strong>de</strong> 42 " Ø m 0 305,00 0,002,7 <strong>de</strong> 48 " Ø m 0 423,00 0,002,8 <strong>de</strong> 54 " Ø m 0 525,00 0,002,9 <strong>de</strong> 60 " Ø m 0 592,00 0,002,10 <strong>de</strong> 66 " Ø m 0 0,00 0,002,11 <strong>de</strong> 72 " Ø m 0 860,00 0,002,12 <strong>de</strong> 78 " Ø m 0 0,00 0,00sub-total 0,003 Camaras <strong>de</strong> Insp.<strong>de</strong> 0.00 a 1.50 m c/u 0 780,00 0,00<strong>de</strong> 1.51 a 2.00 m c/u 3 945,00 2.835,00<strong>de</strong> 2.01 a 3.00 m c/u 2 955,00 1.910,00<strong>de</strong> 3.01 a 4.00 m c/u 6 1.760,00 10.560,00<strong>de</strong> 4.01 a 5.00 m c/u 0 2.500,00 0,00> <strong>de</strong> 5.00 m c/u 0 2.900,00 0,00sub-total 15.305,004 Cruces <strong>de</strong> Rios c/u 1 25.000,00 25.000,00sub-total 25.000,005 Imprevisto (10%) 7.306,70TOTALB/.80.373,70

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!