12.07.2015 Views

Volumen 3 - Tomo 1 - Ministerio de Salud

Volumen 3 - Tomo 1 - Ministerio de Salud

Volumen 3 - Tomo 1 - Ministerio de Salud

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PRESUPUESTO DE LA COLECTORACOLECTORA QP - ALTENATIVA 5AN° Descripción Unidad Cantidad P. Unitario P. Total( B/. ) ( B/. )1 Tuberías <strong>de</strong> PVC1,1 <strong>de</strong> 8 " Ø m 0 36,00 0,001,2 <strong>de</strong> 10 " Ø m 0 40,00 0,001,3 <strong>de</strong> 12 " Ø m 0 70,00 0,001,4 <strong>de</strong> 15 " Ø m 0 112,00 0,00sub-total 0,002 Tuberías <strong>de</strong> H.A2,1 <strong>de</strong> 18 " Ø m 0 110,00 0,002,2 <strong>de</strong> 21 " Ø m 0 121,00 0,002,3 <strong>de</strong> 24 " Ø m 490 135,00 66.150,002,4 <strong>de</strong> 30 " Ø m 115 192,00 22.080,002,5 <strong>de</strong> 36 " Ø m 3.248 243,00 789.264,002,6 <strong>de</strong> 42 " Ø m 0 305,00 0,002,7 <strong>de</strong> 48 " Ø m 0 423,00 0,002,8 <strong>de</strong> 54 " Ø m 0 525,00 0,002,9 <strong>de</strong> 60 " Ø m 0 592,00 0,002,10 <strong>de</strong> 66 " Ø m 0 0,00 0,002,11 <strong>de</strong> 72 " Ø m 0 860,00 0,002,12 <strong>de</strong> 78 " Ø m 0 0,00 0,00sub-total 877.494,003 Camaras <strong>de</strong> Insp.<strong>de</strong> 0.00 a 1.50 m c/u 0 780,00 0,00<strong>de</strong> 1.51 a 2.00 m c/u 4 945,00 3.780,00<strong>de</strong> 2.01 a 3.00 m c/u 39 955,00 37.245,00<strong>de</strong> 3.01 a 4.00 m c/u 18 1.760,00 31.680,00<strong>de</strong> 4.01 a 5.00 m c/u 10 2.500,00 25.000,00> <strong>de</strong> 5.00 m c/u 3 2.900,00 8.700,00sub-total 106.405,004 Cruces <strong>de</strong> Rios c/u 1 25.000,00 25.000,00sub-total 25.000,005 Otros Servicios 100.889,90TOTALB/.1.109.788,90

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!