PLAN2 Mar 15.pmd - Unidad de Planeación Minero Energética, UPME

PLAN2 Mar 15.pmd - Unidad de Planeación Minero Energética, UPME

PLAN2 Mar 15.pmd - Unidad de Planeación Minero Energética, UPME

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ETAPA NSD VERE % VEREC %<br />

Ene-07 1 0.02 1.52<br />

Feb-07 1 0.09 9.13<br />

<strong>Mar</strong>-07 1 0.12 11.98<br />

Feb-08 2 0.14 6.97<br />

<strong>Mar</strong>-08 2 0.12 6.11<br />

Feb-09 1 0.02 2.01<br />

<strong>Mar</strong>-09 1 0.01 0.89<br />

Feb-10 2 0.06 3.07<br />

<strong>Mar</strong>-10 1 0.14 13.82<br />

Oct-10 1 0.00 0.04<br />

Feb-12 2 0.02 0.84<br />

<strong>Mar</strong>-12 1 0.04 3.60<br />

Abr-12 1 0.03 2.68<br />

Ene-13 1 0.05 5.26<br />

Feb-13 1 0.16 16.24<br />

<strong>Mar</strong>-13 2 0.15 7.31<br />

Abr-13 4 0.00 0.04<br />

Nov-13 1 0.00 0.03<br />

Feb-14 2 0.03 1.40<br />

<strong>Mar</strong>-14 3 0.07 2.28<br />

Abr-14 3 0.06 1.87<br />

Jul-14 2 0.00 0.05<br />

Sep-14 3 0.00 0.06<br />

Oct-14 2 0.00 0.05<br />

Nov-14 1 0.00 0.07<br />

Dic-14 2 0.00 0.03<br />

Tabla 5-12. Valores esperados <strong>de</strong> racionamiento eléctrico en Colombia.<br />

Sensibilidad retiro <strong>de</strong> operación <strong>de</strong> las Centrales Paraíso y La Guaca.<br />

Gráfica 5-5. Costo marginal esperado <strong>de</strong> la energía eléctrica en Colombia.<br />

Sensibilidad retiro <strong>de</strong> Operación <strong>de</strong> las centrales Paraíso y La Guaca.<br />

PLAN DE EXPANSIÓN DE REFERENCIA GENERACIÓN - TRANSMISIÓN 2005 – 2019<br />