projecte executiu del nou centre d'ensenyament infantil i ... - Vigem
projecte executiu del nou centre d'ensenyament infantil i ... - Vigem projecte executiu del nou centre d'ensenyament infantil i ... - Vigem
Pressupost: 439-CEIP Dr Fleming Febrer JUSTIFICACIÓ DE PREUS Data: 21/9/2010 Pàg.: 491 PARTIDES D'OBRA TEMPERATURA MÀXIMA DEL FLUID DE 110°C, AMB COS FILTRANT DE MALLA DE COURE, VÀLVULA DE PURGA AUTOMÀTICA EN LA PART SUPERIOR, VÀLVULA D'EXTRACCIÓ DE GRANS QUANTITATS D'AIRE MUNTADA AL COS I TAP DE BUIDAT A LA PART INFERIOR Subtotal: 399,54000 399,54000 DESPESES AUXILIARS 1,50 % 0,66330 COST DIRECTE 444,42330 DESPESES INDIRECTES 0,00 % 0,00000 COST EXECUCIÓ MATERIAL 444,42330 EJ7 DIPÒSITS I ACCESSORIS, PER A AIGUA EJ71 DIPÒSITS PER A AIGUA _____________________________________________________________________________________________________________ EJ71U010 U INSTAL·LACIÓ ACUM.,ASPIRACIÓ I IMPULS.AIGUA SANIT.,DIPÒSIT RESERVA 12000 L,VÀLVLA EMPLENAT,NIVELLS INSTAL·LACIÓ D'ACUMULACIÓ, ASPIRACIÓ I IMPULSIÓ D'AIGUA SANITÀRIA FORMADA PER DIPÒSIT DE RESERVA DEL TIPUS PREFABRICAT EN FIBRA DE VIDRE DE 12.000 L DE CAPACITAT AMB TAPA, REGISTRES I BUIDAT, VÀLVULA D'EMPLENAT DE TIPUS FLOTADOR DE 100 MM DE DIÀMETRE I JOC DE NIVELLS PER AL CONTROL DE VOLUM ACUMULAT AMB CONNEXIONAT ELÈCTRIC DEL SISTEMA I P.P. DE CANONADA D'ALIMENTACIÓ A LA INSTAL·LACIÓ Rend.: 1,000 Precio 2.805,71 € Unitats Preu EURO Parcial Import Ma d'obra A013M000 h Ajudant muntador 12,000 /R x 20,44000 = 245,28000 A012M000 h Oficial 1a muntador 8,000 /R x 23,78000 = 190,24000 Materials Subtotal: 435,52000 435,52000 BJ72U010 U NIVELLS DIPÒSIT 1,000 x 101,51000 = 101,51000 BJ72U110 U CANONADA D'ALIMENTACIÓ A LA INSTAL·LACIÓ 1,000 x 148,18000 = 148,18000 BJ72U210 U VÀLVULA DE FLOTADOR 100 MM 1,000 x 685,29000 = 685,29000 BJ71U010 U DIPÒSIT DE RESERVA DEL TIPUS PREFABRICAT EN FIBRA DE VIDRE DE 12.000 L DE CAPACITAT AMB TAPA 1,000 x 1.424,32000 = 1.424,32000 Subtotal: 2.359,30000 2.359,30000 DESPESES AUXILIARS 2,50 % 10,88800 COST DIRECTE 2.805,70800 DESPESES INDIRECTES 0,00 % 0,00000 COST EXECUCIÓ MATERIAL 2.805,70800
Pressupost: 439-CEIP Dr Fleming Febrer JUSTIFICACIÓ DE PREUS Data: 21/9/2010 Pàg.: 492 PARTIDES D'OBRA EJA PRODUCCIÓ D'AIGUA CALENTA SANITÀRIA EJA _____________________________________________________________________________________________________________ EJA1Z00 U KIT SUPORT PELS 3 COL·LECTORS SUBMINISTRE I COL.LOCACIÓ DE KIT BÀSIC DE MUNTAGE DE 3 CAPTADORS , SOBRE TEULADA PLANA. INCLOU: - BASE SUPORT PER A 3 CAPTADORS - 3 UT. TRIANGLES SUPORT - RÀCORDS HIDRÀULICS - JOC RÀCORDS PER A LA UNIÓ DE CAPTADORS - PETIT MATERIAL - PARTS PROPORCIONALS Rend.: 1,000 Precio 358,40 € Unitats Preu EURO Parcial Import Ma d'obra A013M000 h Ajudant muntador 1,000 /R x 20,44000 = 20,44000 A012M000 h Oficial 1a muntador 1,000 /R x 23,78000 = 23,78000 Materials Subtotal: 44,22000 44,22000 BEAZ2001 U SUPORT PER A CAPTADORS SOLARS 1,200 x 261,82000 = 314,18400 Subtotal: 314,18400 314,18400 COST DIRECTE 358,40400 DESPESES INDIRECTES 0,00 % 0,00000 COST EXECUCIÓ MATERIAL 358,40400 EJA PRODUCCIÓ D'AIGUA CALENTA SANITÀRIA EJAB DIPÒSITS ACUMULADORS _____________________________________________________________________________________________________________ EJAB1411 U ACUMULADOR ACS 300L,CUBETA ACER ESMALT.,AÏLLAM.POLIURETÀ,COL.VERT.FIX.MURAL+CONNEC. ACUMULADOR PER A AIGUA CALENTA SANITÀRIA DE 300 L DE CAPACITAT, AMB CUBETA D'ACER ESMALTAT I AÏLLAMENT DE POLIURETÀ, COL·LOCAT EN POSICIÓ VERTICAL AMB FIXACIONS MURALS I CONNECTAT Rend.: 1,000 Precio 697,21 € Unitats Preu EURO Parcial Import Ma d'obra A013J000 h Ajudant lampista 3,000 /R x 20,41000 = 61,23000 A012J000 h Oficial 1a lampista 3,000 /R x 23,78000 = 71,34000 Materials BJAB1420 U ACUMULADOR PER A AIGUA CALENTA SANITÀRIA DE 300 L DE CAPACITAT, AMB CUBETA D'ACER ESMALTAT I AÏLLAMENT DE POLIURETÀ Subtotal: 132,57000 132,57000 1,000 x 561,33000 = 561,33000 Subtotal: 561,33000 561,33000
- Page 441 and 442: Pressupost: 439-CEIP Dr Fleming Feb
- Page 443 and 444: Pressupost: 439-CEIP Dr Fleming Feb
- Page 445 and 446: Pressupost: 439-CEIP Dr Fleming Feb
- Page 447 and 448: Pressupost: 439-CEIP Dr Fleming Feb
- Page 449 and 450: Pressupost: 439-CEIP Dr Fleming Feb
- Page 451 and 452: Pressupost: 439-CEIP Dr Fleming Feb
- Page 453 and 454: Pressupost: 439-CEIP Dr Fleming Feb
- Page 455 and 456: Pressupost: 439-CEIP Dr Fleming Feb
- Page 457 and 458: Pressupost: 439-CEIP Dr Fleming Feb
- Page 459 and 460: Pressupost: 439-CEIP Dr Fleming Feb
- Page 461 and 462: Pressupost: 439-CEIP Dr Fleming Feb
- Page 463 and 464: Pressupost: 439-CEIP Dr Fleming Feb
- Page 465 and 466: Pressupost: 439-CEIP Dr Fleming Feb
- Page 467 and 468: Pressupost: 439-CEIP Dr Fleming Feb
- Page 469 and 470: Pressupost: 439-CEIP Dr Fleming Feb
- Page 471 and 472: Pressupost: 439-CEIP Dr Fleming Feb
- Page 473 and 474: Pressupost: 439-CEIP Dr Fleming Feb
- Page 475 and 476: Pressupost: 439-CEIP Dr Fleming Feb
- Page 477 and 478: Pressupost: 439-CEIP Dr Fleming Feb
- Page 479 and 480: Pressupost: 439-CEIP Dr Fleming Feb
- Page 481 and 482: Pressupost: 439-CEIP Dr Fleming Feb
- Page 483 and 484: Pressupost: 439-CEIP Dr Fleming Feb
- Page 485 and 486: Pressupost: 439-CEIP Dr Fleming Feb
- Page 487 and 488: Pressupost: 439-CEIP Dr Fleming Feb
- Page 489 and 490: Pressupost: 439-CEIP Dr Fleming Feb
- Page 491: Pressupost: 439-CEIP Dr Fleming Feb
- Page 495 and 496: Pressupost: 439-CEIP Dr Fleming Feb
- Page 497 and 498: Pressupost: 439-CEIP Dr Fleming Feb
- Page 499 and 500: Pressupost: 439-CEIP Dr Fleming Feb
- Page 501 and 502: Pressupost: 439-CEIP Dr Fleming Feb
- Page 503 and 504: Pressupost: 439-CEIP Dr Fleming Feb
- Page 505 and 506: Pressupost: 439-CEIP Dr Fleming Feb
- Page 507 and 508: Pressupost: 439-CEIP Dr Fleming Feb
- Page 509 and 510: Pressupost: 439-CEIP Dr Fleming Feb
- Page 511 and 512: Pressupost: 439-CEIP Dr Fleming Feb
- Page 513 and 514: Pressupost: 439-CEIP Dr Fleming Feb
- Page 515 and 516: Pressupost: 439-CEIP Dr Fleming Feb
- Page 517 and 518: Pressupost: 439-CEIP Dr Fleming Feb
- Page 519 and 520: Pressupost: 439-CEIP Dr Fleming Feb
- Page 521 and 522: Pressupost: 439-CEIP Dr Fleming Feb
- Page 523 and 524: Pressupost: 439-CEIP Dr Fleming Feb
- Page 525 and 526: Pressupost: 439-CEIP Dr Fleming Feb
- Page 527 and 528: Pressupost: 439-CEIP Dr Fleming Feb
- Page 529 and 530: Pressupost: 439-CEIP Dr Fleming Feb
- Page 531 and 532: Pressupost: 439-CEIP Dr Fleming Feb
- Page 533 and 534: Pressupost: 439-CEIP Dr Fleming Feb
- Page 535 and 536: Pressupost: 439-CEIP Dr Fleming Feb
- Page 537 and 538: Pressupost: 439-CEIP Dr Fleming Feb
- Page 539 and 540: Pressupost: 439-CEIP Dr Fleming Feb
- Page 541 and 542: Pressupost: 439-CEIP Dr Fleming Feb
Pressupost: 439-CEIP Dr Fleming Febrer<br />
JUSTIFICACIÓ DE PREUS Data: 21/9/2010 Pàg.: 492<br />
PARTIDES D'OBRA<br />
EJA PRODUCCIÓ D'AIGUA CALENTA SANITÀRIA<br />
EJA<br />
_____________________________________________________________________________________________________________<br />
EJA1Z00 U KIT SUPORT PELS 3 COL·LECTORS<br />
SUBMINISTRE I COL.LOCACIÓ DE KIT BÀSIC DE MUNTAGE DE 3 CAPTADORS , SOBRE TEULADA PLANA. INCLOU:<br />
- BASE SUPORT PER A 3 CAPTADORS<br />
- 3 UT. TRIANGLES SUPORT<br />
- RÀCORDS HIDRÀULICS<br />
- JOC RÀCORDS PER A LA UNIÓ DE CAPTADORS<br />
- PETIT MATERIAL<br />
- PARTS PROPORCIONALS<br />
Rend.: 1,000 Precio 358,40 €<br />
Unitats Preu EURO Parcial Import<br />
Ma d'obra<br />
A013M000 h Ajudant muntador 1,000 /R x 20,44000 = 20,44000<br />
A012M000 h Oficial 1a muntador 1,000 /R x 23,78000 = 23,78000<br />
Materials<br />
Subtotal: 44,22000 44,22000<br />
BEAZ2001 U SUPORT PER A CAPTADORS SOLARS 1,200 x 261,82000 = 314,18400<br />
Subtotal: 314,18400 314,18400<br />
COST DIRECTE 358,40400<br />
DESPESES INDIRECTES 0,00 % 0,00000<br />
COST EXECUCIÓ MATERIAL 358,40400<br />
EJA PRODUCCIÓ D'AIGUA CALENTA SANITÀRIA<br />
EJAB DIPÒSITS ACUMULADORS<br />
_____________________________________________________________________________________________________________<br />
EJAB1411 U ACUMULADOR ACS 300L,CUBETA ACER ESMALT.,AÏLLAM.POLIURETÀ,COL.VERT.FIX.MURAL+CONNEC.<br />
ACUMULADOR PER A AIGUA CALENTA SANITÀRIA DE 300 L DE CAPACITAT, AMB CUBETA D'ACER ESMALTAT I AÏLLAMENT DE<br />
POLIURETÀ, COL·LOCAT EN POSICIÓ VERTICAL AMB FIXACIONS MURALS I CONNECTAT<br />
Rend.: 1,000 Precio 697,21 €<br />
Unitats Preu EURO Parcial Import<br />
Ma d'obra<br />
A013J000 h Ajudant lampista 3,000 /R x 20,41000 = 61,23000<br />
A012J000 h Oficial 1a lampista 3,000 /R x 23,78000 = 71,34000<br />
Materials<br />
BJAB1420 U ACUMULADOR PER A AIGUA CALENTA<br />
SANITÀRIA DE 300 L DE CAPACITAT, AMB<br />
CUBETA D'ACER ESMALTAT I AÏLLAMENT DE<br />
POLIURETÀ<br />
Subtotal: 132,57000 132,57000<br />
1,000 x 561,33000 = 561,33000<br />
Subtotal: 561,33000 561,33000