Pressupost: 439-CEIP Dr Fleming Febrer JUSTIFICACIÓ DE PREUS Data: 21/9/2010 Pàg.: 385 PARTIDES D'OBRA EEV ELEMENTS DE REGULACIÓ I CONTROL PER A INSTAL·LACIONS DE CLIMATITZACIÓ, CALEFACCIÓ I VENTILACIÓ MECÀNICA EEV2 ELEMENTS D'OBTENCIÓ DE DADES PER A REGULACIÓ ELECTRÒNICA _____________________________________________________________________________________________________________ EEV21D00 U SONDA TEMPERATURA CANONADA BEINA,MUNT.+CONNECTADA SONDA DE TEMPERATURA EN CANONADA AMB BEINA, AMB ACCESSORIS DE MUNTATGE, MUNTADA I CONNECTADA Rend.: 1,000 Precio 84,64 € Unitats Preu EURO Parcial Import Ma d'obra A013M000 h Ajudant muntador 0,600 /R x 20,44000 = 12,26400 A012M000 h Oficial 1a muntador 0,600 /R x 23,78000 = 14,26800 Materials BEV21D00 U SONDA DE TEMPERATURA EN CANONADA AMB BEINA, AMB ACCESSORIS DE MUNTATGE Subtotal: 26,53200 26,53200 1,000 x 57,71000 = 57,71000 Subtotal: 57,71000 57,71000 DESPESES AUXILIARS 1,50 % 0,39798 COST DIRECTE 84,63998 DESPESES INDIRECTES 0,00 % 0,00000 COST EXECUCIÓ MATERIAL 84,63998 EEV2B000 U TERMÒSTAT LIMITADOR TEMPERATURA FUMS TERMÒSTAT LIMITADOR DE TEMPERATURA DE FUMS, REARMAMENT MANUAL, MUNTAT I CONNECTAT Rend.: 1,000 Precio 141,40 € Unitats Preu EURO Parcial Import Ma d'obra A013M000 h Ajudant muntador 0,600 /R x 20,44000 = 12,26400 A012M000 h Oficial 1a muntador 0,600 /R x 23,78000 = 14,26800 Materials BEV2B000 U TERMÒSTAT LIMITADOR DE TEMPERATURA DE FUMS, REARMAMENT MANUAL, AMB ACCESSORIS DE MUNTATGE Subtotal: 26,53200 26,53200 1,000 x 114,47000 = 114,47000 Subtotal: 114,47000 114,47000 DESPESES AUXILIARS 1,50 % 0,39798 COST DIRECTE 141,39998 DESPESES INDIRECTES 0,00 % 0,00000 COST EXECUCIÓ MATERIAL 141,39998
Pressupost: 439-CEIP Dr Fleming Febrer JUSTIFICACIÓ DE PREUS Data: 21/9/2010 Pàg.: 386 PARTIDES D'OBRA EEZ ELEMENTS ESPECIALS PER A INSTAL·LACIONS DE CLIMATITZACIÓ, CALEFACCIÓ I VENTILACIÓ MECÀNICA EEZ5 ELEMENTS ESPECIALS PER A EMISORS (PER AIGUA) _____________________________________________________________________________________________________________ EEZ51320 U CONJUNT VALV.,P/RADIADOR,SIST.BITUB.,DET.,VÀLV.,TAPS,PURG.AIRE AUTOMÀT.,ACOB.RADIAD. CONJUNT DE VALVULERIA TERMOSTÀTICA PER A RADIADOR AMB SISTEMA BITUBULAR, AMB DETENTOR, VÀLVULA, TAPS I PURGADOR D'AIRE AUTOMÀTIC, ACOBLAT AL RADIADOR Rend.: 1,000 Precio 49,13 € Unitats Preu EURO Parcial Import Ma d'obra A012G000 H OFICIAL 1A CALEFACTOR 0,500 /R x 23,78000 = 11,89000 A013G000 H AJUDANT CALEFACTOR 0,500 /R x 20,41000 = 10,20500 Materials Subtotal: 22,09500 22,09500 BEZ5B000 U PURGADOR PER A RADIADORS, AUTOMÀTIC 1,000 x 1,28000 = 1,28000 BEZ5H200 U AIXETA PER A RADIADORS, TERMOSTÀTICA, PREU ALT 1,000 x 20,29000 = 20,29000 BEZ5L000 U DETENTOR DE SORTIDA, PREU ALT 1,000 x 3,03000 = 3,03000 BEZ55000 U TAP AMB REDUCCIÓ, PREU ALT, PER A RADIADOR 3,000 x 0,54000 = 1,62000 BEZ52000 U TAP CEC, PREU ALT, PER A RADIADOR 1,000 x 0,48000 = 0,48000 Subtotal: 26,70000 26,70000 DESPESES AUXILIARS 1,50 % 0,33143 COST DIRECTE 49,12643 DESPESES INDIRECTES 0,00 % 0,00000 COST EXECUCIÓ MATERIAL 49,12643 EF TUBS I ACCESSORIS PER A GASOS I FLUIDS EF1 TUBS D'ACER NEGRE EF11 TUBS D'ACER NEGRE SENSE SOLDADURA _____________________________________________________________________________________________________________ EF118223 M TUB ACER NEGRE S/SOLD.,D=1´´1/2,SOLDAT,DIFIC.ALT,COL.SUPERF. TUB D'ACER NEGRE SENSE SOLDADURA DE DIÀMETRE NOMINAL 1´´1/2, SEGONS LA NORMA DIN EN ISO 2440 ST-35, SOLDAT, AMB GRAU DE DIFICULTAT ALT I COL·LOCAT SUPERFICIALMENT Rend.: 1,000 Precio 36,74 € Unitats Preu EURO Parcial Import Ma d'obra A012M000 h Oficial 1a muntador 0,560 /R x 23,78000 = 13,31680 A013M000 h Ajudant muntador 0,560 /R x 20,44000 = 11,44640 Materials B0A71H00 U ABRAÇADORA METÀL·LICA, DE 47 MM DE DIÀMETRE INTERIOR BF118200 M TUB D'ACER NEGRE SENSE SOLDADURA DE DIÀMETRE 1´´1/2, SEGONS LA NORMA DIN EN ISO 2440 ST-35 Subtotal: 24,76320 24,76320 0,330 x 0,61000 = 0,20130 1,020 x 8,91000 = 9,08820
- Page 335 and 336: Pressupost: 439-CEIP Dr Fleming Feb
- Page 337 and 338: Pressupost: 439-CEIP Dr Fleming Feb
- Page 339 and 340: Pressupost: 439-CEIP Dr Fleming Feb
- Page 341 and 342: Pressupost: 439-CEIP Dr Fleming Feb
- Page 343 and 344: Pressupost: 439-CEIP Dr Fleming Feb
- Page 345 and 346: Pressupost: 439-CEIP Dr Fleming Feb
- Page 347 and 348: Pressupost: 439-CEIP Dr Fleming Feb
- Page 349 and 350: Pressupost: 439-CEIP Dr Fleming Feb
- Page 351 and 352: Pressupost: 439-CEIP Dr Fleming Feb
- Page 353 and 354: Pressupost: 439-CEIP Dr Fleming Feb
- Page 355 and 356: Pressupost: 439-CEIP Dr Fleming Feb
- Page 357 and 358: Pressupost: 439-CEIP Dr Fleming Feb
- Page 359 and 360: Pressupost: 439-CEIP Dr Fleming Feb
- Page 361 and 362: Pressupost: 439-CEIP Dr Fleming Feb
- Page 363 and 364: Pressupost: 439-CEIP Dr Fleming Feb
- Page 365 and 366: Pressupost: 439-CEIP Dr Fleming Feb
- Page 367 and 368: Pressupost: 439-CEIP Dr Fleming Feb
- Page 369 and 370: Pressupost: 439-CEIP Dr Fleming Feb
- Page 371 and 372: Pressupost: 439-CEIP Dr Fleming Feb
- Page 373 and 374: Pressupost: 439-CEIP Dr Fleming Feb
- Page 375 and 376: Pressupost: 439-CEIP Dr Fleming Feb
- Page 377 and 378: Pressupost: 439-CEIP Dr Fleming Feb
- Page 379 and 380: Pressupost: 439-CEIP Dr Fleming Feb
- Page 381 and 382: Pressupost: 439-CEIP Dr Fleming Feb
- Page 383 and 384: Pressupost: 439-CEIP Dr Fleming Feb
- Page 385: Pressupost: 439-CEIP Dr Fleming Feb
- Page 389 and 390: Pressupost: 439-CEIP Dr Fleming Feb
- Page 391 and 392: Pressupost: 439-CEIP Dr Fleming Feb
- Page 393 and 394: Pressupost: 439-CEIP Dr Fleming Feb
- Page 395 and 396: Pressupost: 439-CEIP Dr Fleming Feb
- Page 397 and 398: Pressupost: 439-CEIP Dr Fleming Feb
- Page 399 and 400: Pressupost: 439-CEIP Dr Fleming Feb
- Page 401 and 402: Pressupost: 439-CEIP Dr Fleming Feb
- Page 403 and 404: Pressupost: 439-CEIP Dr Fleming Feb
- Page 405 and 406: Pressupost: 439-CEIP Dr Fleming Feb
- Page 407 and 408: Pressupost: 439-CEIP Dr Fleming Feb
- Page 409 and 410: Pressupost: 439-CEIP Dr Fleming Feb
- Page 411 and 412: Pressupost: 439-CEIP Dr Fleming Feb
- Page 413 and 414: Pressupost: 439-CEIP Dr Fleming Feb
- Page 415 and 416: Pressupost: 439-CEIP Dr Fleming Feb
- Page 417 and 418: Pressupost: 439-CEIP Dr Fleming Feb
- Page 419 and 420: Pressupost: 439-CEIP Dr Fleming Feb
- Page 421 and 422: Pressupost: 439-CEIP Dr Fleming Feb
- Page 423 and 424: Pressupost: 439-CEIP Dr Fleming Feb
- Page 425 and 426: Pressupost: 439-CEIP Dr Fleming Feb
- Page 427 and 428: Pressupost: 439-CEIP Dr Fleming Feb
- Page 429 and 430: Pressupost: 439-CEIP Dr Fleming Feb
- Page 431 and 432: Pressupost: 439-CEIP Dr Fleming Feb
- Page 433 and 434: Pressupost: 439-CEIP Dr Fleming Feb
- Page 435 and 436: Pressupost: 439-CEIP Dr Fleming Feb
Pressupost: 439-CEIP Dr Fleming Febrer<br />
JUSTIFICACIÓ DE PREUS Data: 21/9/2010 Pàg.: 386<br />
PARTIDES D'OBRA<br />
EEZ ELEMENTS ESPECIALS PER A INSTAL·LACIONS DE CLIMATITZACIÓ, CALEFACCIÓ I VENTILACIÓ MECÀNICA<br />
EEZ5 ELEMENTS ESPECIALS PER A EMISORS (PER AIGUA)<br />
_____________________________________________________________________________________________________________<br />
EEZ51320 U CONJUNT VALV.,P/RADIADOR,SIST.BITUB.,DET.,VÀLV.,TAPS,PURG.AIRE AUTOMÀT.,ACOB.RADIAD.<br />
CONJUNT DE VALVULERIA TERMOSTÀTICA PER A RADIADOR AMB SISTEMA BITUBULAR, AMB DETENTOR, VÀLVULA, TAPS I<br />
PURGADOR D'AIRE AUTOMÀTIC, ACOBLAT AL RADIADOR<br />
Rend.: 1,000 Precio 49,13 €<br />
Unitats Preu EURO Parcial Import<br />
Ma d'obra<br />
A012G000 H OFICIAL 1A CALEFACTOR 0,500 /R x 23,78000 = 11,89000<br />
A013G000 H AJUDANT CALEFACTOR 0,500 /R x 20,41000 = 10,20500<br />
Materials<br />
Subtotal: 22,09500 22,09500<br />
BEZ5B000 U PURGADOR PER A RADIADORS, AUTOMÀTIC 1,000 x 1,28000 = 1,28000<br />
BEZ5H200 U AIXETA PER A RADIADORS, TERMOSTÀTICA,<br />
PREU ALT<br />
1,000 x 20,29000 = 20,29000<br />
BEZ5L000 U DETENTOR DE SORTIDA, PREU ALT 1,000 x 3,03000 = 3,03000<br />
BEZ55000 U TAP AMB REDUCCIÓ, PREU ALT, PER A<br />
RADIADOR<br />
3,000 x 0,54000 = 1,62000<br />
BEZ52000 U TAP CEC, PREU ALT, PER A RADIADOR 1,000 x 0,48000 = 0,48000<br />
Subtotal: 26,70000 26,70000<br />
DESPESES AUXILIARS 1,50 % 0,33143<br />
COST DIRECTE 49,12643<br />
DESPESES INDIRECTES 0,00 % 0,00000<br />
COST EXECUCIÓ MATERIAL 49,12643<br />
EF TUBS I ACCESSORIS PER A GASOS I FLUIDS<br />
EF1 TUBS D'ACER NEGRE<br />
EF11 TUBS D'ACER NEGRE SENSE SOLDADURA<br />
_____________________________________________________________________________________________________________<br />
EF118223 M TUB ACER NEGRE S/SOLD.,D=1´´1/2,SOLDAT,DIFIC.ALT,COL.SUPERF.<br />
TUB D'ACER NEGRE SENSE SOLDADURA DE DIÀMETRE NOMINAL 1´´1/2, SEGONS LA NORMA DIN EN ISO 2440 ST-35, SOLDAT,<br />
AMB GRAU DE DIFICULTAT ALT I COL·LOCAT SUPERFICIALMENT<br />
Rend.: 1,000 Precio 36,74 €<br />
Unitats Preu EURO Parcial Import<br />
Ma d'obra<br />
A012M000 h Oficial 1a muntador 0,560 /R x 23,78000 = 13,31680<br />
A013M000 h Ajudant muntador 0,560 /R x 20,44000 = 11,44640<br />
Materials<br />
B0A71H00 U ABRAÇADORA METÀL·LICA, DE 47 MM DE<br />
DIÀMETRE INTERIOR<br />
BF118200 M TUB D'ACER NEGRE SENSE SOLDADURA DE<br />
DIÀMETRE 1´´1/2, SEGONS LA NORMA DIN EN<br />
ISO 2440 ST-35<br />
Subtotal: 24,76320 24,76320<br />
0,330 x 0,61000 = 0,20130<br />
1,020 x 8,91000 = 9,08820