Pressupost: 439-CEIP Dr Fleming Febrer JUSTIFICACIÓ DE PREUS Data: 21/9/2010 Pàg.: 381 PARTIDES D'OBRA EEU MATERIALS AUXILIARS PER A INSTAL·LACIONS DE CLIMATITZACIÓ, CALEFACCIÓ I VENTILACIÓ MECÀNICA EEU1 PURGADORS AUTOMÀTICS _____________________________________________________________________________________________________________ EEU11113 U PURGADOR AUTOMÀT.AIRE,LLAUTÓ,VERT.+VÀLVULA OBT.,D=3/8´´ PURGADOR AUTOMÀTIC D'AIRE, DE LLAUTÓ, PER FLOTADOR, DE POSICIÓ VERTICAL I VÀLVULA D'OBTURACIÓ INCORPORADA, AMB ROSCA DE 3/8´´ DE DIÀMETRE, ROSCAT Rend.: 1,000 Precio 15,65 € Unitats Preu EURO Parcial Import Ma d'obra A012G000 H OFICIAL 1A CALEFACTOR 0,300 /R x 23,78000 = 7,13400 A013G000 H AJUDANT CALEFACTOR 0,075 /R x 20,41000 = 1,53075 Materials BEU11113 U PURGADOR AUTOMÀTIC D'AIRE, DE LLAUTÓ, PER FLOTADOR, DE POSICIÓ VERTICAL I VÀLVULA D'OBTURACIÓ INCORPORADA, AMB ROSCA DE 3/8´´ DE DIÀMETRE Subtotal: 8,66475 8,66475 1,000 x 6,86000 = 6,86000 Subtotal: 6,86000 6,86000 DESPESES AUXILIARS 1,50 % 0,12997 COST DIRECTE 15,65472 DESPESES INDIRECTES 0,00 % 0,00000 COST EXECUCIÓ MATERIAL 15,65472 EEU MATERIALS AUXILIARS PER A INSTAL·LACIONS DE CLIMATITZACIÓ, CALEFACCIÓ I VENTILACIÓ MECÀNICA EEU4 DIPOSITS D'EXPANSIÓ _____________________________________________________________________________________________________________ EEU41B31 U DIPÒSIT EXP.50L,PLANXA ACER,MEMBRANA ELÀST.,PRESSIÓ MÀX=10BAR,CONNEX.D=3/4´´,COL.ROSCAT DIPÒSIT D'EXPANSIÓ DE 50 L DE CAPACITAT, DE PLANXA D'ACER I MEMBRANA ELÀSTICA, DE PRESSIÓ MÀXIMA 10 BAR, AMB CONNEXIÓ DE 3/4´´, COL·LOCAT ROSCAT Rend.: 1,000 Precio 128,21 € Unitats Preu EURO Parcial Import Ma d'obra A013G000 H AJUDANT CALEFACTOR 0,250 /R x 20,41000 = 5,10250 A012G000 H OFICIAL 1A CALEFACTOR 0,250 /R x 23,78000 = 5,94500 Materials BEU41B31 U DIPÒSIT D'EXPANSIÓ DE 50 L DE CAPACITAT, DE PLANXA D'ACER I MEMBRANA ELÀSTICA, DE PRESSIÓ MÀXIMA 10 BAR, AMB CONNEXIÓ DE 3/4´´ Subtotal: 11,04750 11,04750 1,000 x 117,00000 = 117,00000 Subtotal: 117,00000 117,00000
Pressupost: 439-CEIP Dr Fleming Febrer JUSTIFICACIÓ DE PREUS Data: 21/9/2010 Pàg.: 382 PARTIDES D'OBRA DESPESES AUXILIARS 1,50 % 0,16571 COST DIRECTE 128,21321 DESPESES INDIRECTES 0,00 % 0,00000 COST EXECUCIÓ MATERIAL 128,21321 EEU4U005 U DIPÒSIT EXP.12L,PLANXA ACER,MEMBRANA ELÀSTICA,CONNEXIÓ D=3/4'',ROSCAT DIPÒSIT D'EXPANSIÓ TANCAT DE 12 L DE CAPACITAT, DE PLANXA D'ACER I MEMBRANA ELÀSTICA, AMB CONNEXIÓ DE 3/4' DE D, COL·LOCAT ROSCAT Rend.: 1,000 Precio 45,26 € Unitats Preu EURO Parcial Import Ma d'obra A012G000 H OFICIAL 1A CALEFACTOR 0,250 /R x 23,78000 = 5,94500 A013G000 H AJUDANT CALEFACTOR 0,250 /R x 20,41000 = 5,10250 Materials BEU4U005 U DIPÒSIT D'EXPANSIÓ TANCAT DE 12 L DE CAPACITAT, DE PLANXA D'ACER I MEMBRANA ELÀSTICA, AMB CONNEXIÓ DE 3/4' DE D Subtotal: 11,04750 11,04750 1,000 x 34,05000 = 34,05000 Subtotal: 34,05000 34,05000 DESPESES AUXILIARS 1,50 % 0,16571 COST DIRECTE 45,26321 DESPESES INDIRECTES 0,00 % 0,00000 COST EXECUCIÓ MATERIAL 45,26321 EEU4U010 U DIPÒSIT EXP.25L,PLANXA ACER,MEMBRANA ELÀSTICA,CONNEXIÓ D=3/4'',ROSCAT DIPÒSIT D'EXPANSIÓ TANCAT DE 25 L DE CAPACITAT, DE PLANXA D'ACER I MEMBRANA ELÀSTICA, AMB CONNEXIÓ DE 3/4' DE D, COL·LOCAT ROSCAT Rend.: 1,000 Precio 62,28 € Unitats Preu EURO Parcial Import Ma d'obra A012G000 H OFICIAL 1A CALEFACTOR 0,250 /R x 23,78000 = 5,94500 A013G000 H AJUDANT CALEFACTOR 0,250 /R x 20,41000 = 5,10250 Materials BEU4U010 U DIPÒSIT D'EXPANSIÓ TANCAT DE 25 L DE CAPACITAT, DE PLANXA D'ACER I MEMBRANA ELÀSTICA, AMB CONNEXIÓ DE 3/4' DE D Subtotal: 11,04750 11,04750 1,000 x 51,07000 = 51,07000 Subtotal: 51,07000 51,07000 DESPESES AUXILIARS 1,50 % 0,16571 COST DIRECTE 62,28321 DESPESES INDIRECTES 0,00 % 0,00000 COST EXECUCIÓ MATERIAL 62,28321
- Page 331 and 332: Pressupost: 439-CEIP Dr Fleming Feb
- Page 333 and 334: Pressupost: 439-CEIP Dr Fleming Feb
- Page 335 and 336: Pressupost: 439-CEIP Dr Fleming Feb
- Page 337 and 338: Pressupost: 439-CEIP Dr Fleming Feb
- Page 339 and 340: Pressupost: 439-CEIP Dr Fleming Feb
- Page 341 and 342: Pressupost: 439-CEIP Dr Fleming Feb
- Page 343 and 344: Pressupost: 439-CEIP Dr Fleming Feb
- Page 345 and 346: Pressupost: 439-CEIP Dr Fleming Feb
- Page 347 and 348: Pressupost: 439-CEIP Dr Fleming Feb
- Page 349 and 350: Pressupost: 439-CEIP Dr Fleming Feb
- Page 351 and 352: Pressupost: 439-CEIP Dr Fleming Feb
- Page 353 and 354: Pressupost: 439-CEIP Dr Fleming Feb
- Page 355 and 356: Pressupost: 439-CEIP Dr Fleming Feb
- Page 357 and 358: Pressupost: 439-CEIP Dr Fleming Feb
- Page 359 and 360: Pressupost: 439-CEIP Dr Fleming Feb
- Page 361 and 362: Pressupost: 439-CEIP Dr Fleming Feb
- Page 363 and 364: Pressupost: 439-CEIP Dr Fleming Feb
- Page 365 and 366: Pressupost: 439-CEIP Dr Fleming Feb
- Page 367 and 368: Pressupost: 439-CEIP Dr Fleming Feb
- Page 369 and 370: Pressupost: 439-CEIP Dr Fleming Feb
- Page 371 and 372: Pressupost: 439-CEIP Dr Fleming Feb
- Page 373 and 374: Pressupost: 439-CEIP Dr Fleming Feb
- Page 375 and 376: Pressupost: 439-CEIP Dr Fleming Feb
- Page 377 and 378: Pressupost: 439-CEIP Dr Fleming Feb
- Page 379 and 380: Pressupost: 439-CEIP Dr Fleming Feb
- Page 381: Pressupost: 439-CEIP Dr Fleming Feb
- Page 385 and 386: Pressupost: 439-CEIP Dr Fleming Feb
- Page 387 and 388: Pressupost: 439-CEIP Dr Fleming Feb
- Page 389 and 390: Pressupost: 439-CEIP Dr Fleming Feb
- Page 391 and 392: Pressupost: 439-CEIP Dr Fleming Feb
- Page 393 and 394: Pressupost: 439-CEIP Dr Fleming Feb
- Page 395 and 396: Pressupost: 439-CEIP Dr Fleming Feb
- Page 397 and 398: Pressupost: 439-CEIP Dr Fleming Feb
- Page 399 and 400: Pressupost: 439-CEIP Dr Fleming Feb
- Page 401 and 402: Pressupost: 439-CEIP Dr Fleming Feb
- Page 403 and 404: Pressupost: 439-CEIP Dr Fleming Feb
- Page 405 and 406: Pressupost: 439-CEIP Dr Fleming Feb
- Page 407 and 408: Pressupost: 439-CEIP Dr Fleming Feb
- Page 409 and 410: Pressupost: 439-CEIP Dr Fleming Feb
- Page 411 and 412: Pressupost: 439-CEIP Dr Fleming Feb
- Page 413 and 414: Pressupost: 439-CEIP Dr Fleming Feb
- Page 415 and 416: Pressupost: 439-CEIP Dr Fleming Feb
- Page 417 and 418: Pressupost: 439-CEIP Dr Fleming Feb
- Page 419 and 420: Pressupost: 439-CEIP Dr Fleming Feb
- Page 421 and 422: Pressupost: 439-CEIP Dr Fleming Feb
- Page 423 and 424: Pressupost: 439-CEIP Dr Fleming Feb
- Page 425 and 426: Pressupost: 439-CEIP Dr Fleming Feb
- Page 427 and 428: Pressupost: 439-CEIP Dr Fleming Feb
- Page 429 and 430: Pressupost: 439-CEIP Dr Fleming Feb
- Page 431 and 432: Pressupost: 439-CEIP Dr Fleming Feb
Pressupost: 439-CEIP Dr Fleming Febrer<br />
JUSTIFICACIÓ DE PREUS Data: 21/9/2010 Pàg.: 382<br />
PARTIDES D'OBRA<br />
DESPESES AUXILIARS 1,50 % 0,16571<br />
COST DIRECTE 128,21321<br />
DESPESES INDIRECTES 0,00 % 0,00000<br />
COST EXECUCIÓ MATERIAL 128,21321<br />
EEU4U005 U DIPÒSIT EXP.12L,PLANXA ACER,MEMBRANA ELÀSTICA,CONNEXIÓ D=3/4'',ROSCAT<br />
DIPÒSIT D'EXPANSIÓ TANCAT DE 12 L DE CAPACITAT, DE PLANXA D'ACER I MEMBRANA ELÀSTICA, AMB CONNEXIÓ DE 3/4' DE<br />
D, COL·LOCAT ROSCAT<br />
Rend.: 1,000 Precio 45,26 €<br />
Unitats Preu EURO Parcial Import<br />
Ma d'obra<br />
A012G000 H OFICIAL 1A CALEFACTOR 0,250 /R x 23,78000 = 5,94500<br />
A013G000 H AJUDANT CALEFACTOR 0,250 /R x 20,41000 = 5,10250<br />
Materials<br />
BEU4U005 U DIPÒSIT D'EXPANSIÓ TANCAT DE 12 L DE<br />
CAPACITAT, DE PLANXA D'ACER I MEMBRANA<br />
ELÀSTICA, AMB CONNEXIÓ DE 3/4' DE D<br />
Subtotal: 11,04750 11,04750<br />
1,000 x 34,05000 = 34,05000<br />
Subtotal: 34,05000 34,05000<br />
DESPESES AUXILIARS 1,50 % 0,16571<br />
COST DIRECTE 45,26321<br />
DESPESES INDIRECTES 0,00 % 0,00000<br />
COST EXECUCIÓ MATERIAL 45,26321<br />
EEU4U010 U DIPÒSIT EXP.25L,PLANXA ACER,MEMBRANA ELÀSTICA,CONNEXIÓ D=3/4'',ROSCAT<br />
DIPÒSIT D'EXPANSIÓ TANCAT DE 25 L DE CAPACITAT, DE PLANXA D'ACER I MEMBRANA ELÀSTICA, AMB CONNEXIÓ DE 3/4' DE<br />
D, COL·LOCAT ROSCAT<br />
Rend.: 1,000 Precio 62,28 €<br />
Unitats Preu EURO Parcial Import<br />
Ma d'obra<br />
A012G000 H OFICIAL 1A CALEFACTOR 0,250 /R x 23,78000 = 5,94500<br />
A013G000 H AJUDANT CALEFACTOR 0,250 /R x 20,41000 = 5,10250<br />
Materials<br />
BEU4U010 U DIPÒSIT D'EXPANSIÓ TANCAT DE 25 L DE<br />
CAPACITAT, DE PLANXA D'ACER I MEMBRANA<br />
ELÀSTICA, AMB CONNEXIÓ DE 3/4' DE D<br />
Subtotal: 11,04750 11,04750<br />
1,000 x 51,07000 = 51,07000<br />
Subtotal: 51,07000 51,07000<br />
DESPESES AUXILIARS 1,50 % 0,16571<br />
COST DIRECTE 62,28321<br />
DESPESES INDIRECTES 0,00 % 0,00000<br />
COST EXECUCIÓ MATERIAL 62,28321