Pressupost: 439-CEIP Dr Fleming Febrer JUSTIFICACIÓ DE PREUS Data: 21/9/2010 Pàg.: 353 PARTIDES D'OBRA DESPESES AUXILIARS 1,50 % 0,79542 COST DIRECTE 388,44342 DESPESES INDIRECTES 0,00 % 0,00000 COST EXECUCIÓ MATERIAL 388,44342 EE31P4C1 U RADIADOR FOSA 23X4COLUMNES,H
Pressupost: 439-CEIP Dr Fleming Febrer JUSTIFICACIÓ DE PREUS Data: 21/9/2010 Pàg.: 354 PARTIDES D'OBRA DESPESES AUXILIARS 1,50 % 0,93198 COST DIRECTE 480,62422 DESPESES INDIRECTES 0,00 % 0,00000 COST EXECUCIÓ MATERIAL 480,62422 EE3 EMISSORS (PER AIGUA) EE38 AEREOESCALFADORS _____________________________________________________________________________________________________________ EE38U000 U AEREOESCALFADOR P/AIGUA CALENTA,11,6KW,CABAL AIRE
- Page 303 and 304: Pressupost: 439-CEIP Dr Fleming Feb
- Page 305 and 306: Pressupost: 439-CEIP Dr Fleming Feb
- Page 307 and 308: Pressupost: 439-CEIP Dr Fleming Feb
- Page 309 and 310: Pressupost: 439-CEIP Dr Fleming Feb
- Page 311 and 312: Pressupost: 439-CEIP Dr Fleming Feb
- Page 313 and 314: Pressupost: 439-CEIP Dr Fleming Feb
- Page 315 and 316: Pressupost: 439-CEIP Dr Fleming Feb
- Page 317 and 318: Pressupost: 439-CEIP Dr Fleming Feb
- Page 319 and 320: Pressupost: 439-CEIP Dr Fleming Feb
- Page 321 and 322: Pressupost: 439-CEIP Dr Fleming Feb
- Page 323 and 324: Pressupost: 439-CEIP Dr Fleming Feb
- Page 325 and 326: Pressupost: 439-CEIP Dr Fleming Feb
- Page 327 and 328: Pressupost: 439-CEIP Dr Fleming Feb
- Page 329 and 330: Pressupost: 439-CEIP Dr Fleming Feb
- Page 331 and 332: Pressupost: 439-CEIP Dr Fleming Feb
- Page 333 and 334: Pressupost: 439-CEIP Dr Fleming Feb
- Page 335 and 336: Pressupost: 439-CEIP Dr Fleming Feb
- Page 337 and 338: Pressupost: 439-CEIP Dr Fleming Feb
- Page 339 and 340: Pressupost: 439-CEIP Dr Fleming Feb
- Page 341 and 342: Pressupost: 439-CEIP Dr Fleming Feb
- Page 343 and 344: Pressupost: 439-CEIP Dr Fleming Feb
- Page 345 and 346: Pressupost: 439-CEIP Dr Fleming Feb
- Page 347 and 348: Pressupost: 439-CEIP Dr Fleming Feb
- Page 349 and 350: Pressupost: 439-CEIP Dr Fleming Feb
- Page 351 and 352: Pressupost: 439-CEIP Dr Fleming Feb
- Page 353: Pressupost: 439-CEIP Dr Fleming Feb
- Page 357 and 358: Pressupost: 439-CEIP Dr Fleming Feb
- Page 359 and 360: Pressupost: 439-CEIP Dr Fleming Feb
- Page 361 and 362: Pressupost: 439-CEIP Dr Fleming Feb
- Page 363 and 364: Pressupost: 439-CEIP Dr Fleming Feb
- Page 365 and 366: Pressupost: 439-CEIP Dr Fleming Feb
- Page 367 and 368: Pressupost: 439-CEIP Dr Fleming Feb
- Page 369 and 370: Pressupost: 439-CEIP Dr Fleming Feb
- Page 371 and 372: Pressupost: 439-CEIP Dr Fleming Feb
- Page 373 and 374: Pressupost: 439-CEIP Dr Fleming Feb
- Page 375 and 376: Pressupost: 439-CEIP Dr Fleming Feb
- Page 377 and 378: Pressupost: 439-CEIP Dr Fleming Feb
- Page 379 and 380: Pressupost: 439-CEIP Dr Fleming Feb
- Page 381 and 382: Pressupost: 439-CEIP Dr Fleming Feb
- Page 383 and 384: Pressupost: 439-CEIP Dr Fleming Feb
- Page 385 and 386: Pressupost: 439-CEIP Dr Fleming Feb
- Page 387 and 388: Pressupost: 439-CEIP Dr Fleming Feb
- Page 389 and 390: Pressupost: 439-CEIP Dr Fleming Feb
- Page 391 and 392: Pressupost: 439-CEIP Dr Fleming Feb
- Page 393 and 394: Pressupost: 439-CEIP Dr Fleming Feb
- Page 395 and 396: Pressupost: 439-CEIP Dr Fleming Feb
- Page 397 and 398: Pressupost: 439-CEIP Dr Fleming Feb
- Page 399 and 400: Pressupost: 439-CEIP Dr Fleming Feb
- Page 401 and 402: Pressupost: 439-CEIP Dr Fleming Feb
- Page 403 and 404: Pressupost: 439-CEIP Dr Fleming Feb
Pressupost: 439-CEIP Dr Fleming Febrer<br />
JUSTIFICACIÓ DE PREUS Data: 21/9/2010 Pàg.: 353<br />
PARTIDES D'OBRA<br />
DESPESES AUXILIARS 1,50 % 0,79542<br />
COST DIRECTE 388,44342<br />
DESPESES INDIRECTES 0,00 % 0,00000<br />
COST EXECUCIÓ MATERIAL 388,44342<br />
EE31P4C1 U RADIADOR FOSA 23X4COLUMNES,H