Pressupost: 439-CEIP Dr Fleming Febrer JUSTIFICACIÓ DE PREUS Data: 21/9/2010 Pàg.: 147 PARTIDES D'OBRA Materials B0A14200 kg Filferro recuit de diàmetre 1.3 mm 0,0102 x 1,08000 = 0,01102 D0B2C100 kg Acer en barres corrugades elaborat a l'obra i manipulat a taller B500SD, de límit elàstic >= 500 N/mm2 1,000 x 0,87099 = 0,87099 Subtotal: 0,88201 0,88201 DESPESES AUXILIARS 2,50 % 0,01189 COST DIRECTE 1,36938 DESPESES INDIRECTES 0,00 % 0,00000 COST EXECUCIÓ MATERIAL 1,36938 E33 RECALÇATS E33D ENCOFRAT PER A RECALÇATS _____________________________________________________________________________________________________________ E33DD103 m2 Encofrat tauler p/recalç.fonam.,fond.
Pressupost: 439-CEIP Dr Fleming Febrer JUSTIFICACIÓ DE PREUS Data: 21/9/2010 Pàg.: 148 PARTIDES D'OBRA E3C LLOSES E3C5 FORMIGONAMENT DE LLOSES DE FONAMENTS _____________________________________________________________________________________________________________ E3C515H4 m3 Formigó p/llosa fonam.HA-25/B/20/IIa,bomba Formigó per a lloses de fonaments, HA-25/B/20/IIa, de consistència tova i grandària màxima del granulat 20 mm, abocat amb bomba Rend.: 1,000 Precio 90,69 € Unitats Preu EURO Parcial Import Ma d'obra A0122000 h Oficial 1a paleta 0,096 /R x 23,02000 = 2,20992 A0140000 h Manobre 0,144 /R x 19,25000 = 2,77200 Maquinària Materials Subtotal: 4,98192 4,98192 C1701100 h Camió amb bomba de formigonar 0,080 /R x 136,75000 = 10,94000 B065960B m3 Formigó HA-25/B/20/IIa de consistència tova, grandària màxima del granulat 20 mm, amb >= 275 kg/m3 de ciment, apte per a classe d'exposició IIa Subtotal: 10,94000 10,94000 1,050 x 71,14000 = 74,69700 Subtotal: 74,69700 74,69700 DESPESES AUXILIARS 1,50 % 0,07473 COST DIRECTE 90,69365 DESPESES INDIRECTES 0,00 % 0,00000 COST EXECUCIÓ MATERIAL 90,69365 E3C LLOSES E3CB ARMADURES PER A LLOSES DE FONAMENTS _____________________________________________________________________________________________________________ E3CBDA88 m2 Armadura p/llosa AP500T malla el.b/corrug.ME 15x15cm,D:6-6mm,6x2,2m B500T Armadura per a lloses AP500 T amb malla electrosoldada de barres corrugades d'acer ME 15x15 cm D:6-6 mm 6x2,2 m B500T UNE-EN 10080, elaborada a l'obra i manipulada a taller Rend.: 1,000 Precio 3,61 € Unitats Preu EURO Parcial Import Ma d'obra A0134000 h Ajudant ferrallista 0,024 /R x 20,44000 = 0,49056 A0124000 h Oficial 1a ferrallista 0,024 /R x 23,02000 = 0,55248 Materials Subtotal: 1,04304 1,04304 B0A14200 kg Filferro recuit de diàmetre 1.3 mm 0,0184 x 1,08000 = 0,01987 D0B34136 m2 Malla electrosoldada de barres corrugades d'acer ME 15x15 cm D:6-6 mm 6x2,2 m B500T UNE-EN 10080, elaborada a l'obra i manipulada a taller 1,000 x 2,52958 = 2,52958 Subtotal: 2,54945 2,54945
- Page 97 and 98: Pressupost: 439-CEIP Dr Fleming Feb
- Page 99 and 100: Pressupost: 439-CEIP Dr Fleming Feb
- Page 101 and 102: Pressupost: 439-CEIP Dr Fleming Feb
- Page 103 and 104: Pressupost: 439-CEIP Dr Fleming Feb
- Page 105 and 106: Pressupost: 439-CEIP Dr Fleming Feb
- Page 107 and 108: Pressupost: 439-CEIP Dr Fleming Feb
- Page 109 and 110: Pressupost: 439-CEIP Dr Fleming Feb
- Page 111 and 112: Pressupost: 439-CEIP Dr Fleming Feb
- Page 113 and 114: Pressupost: 439-CEIP Dr Fleming Feb
- Page 115 and 116: Pressupost: 439-CEIP Dr Fleming Feb
- Page 117 and 118: Pressupost: 439-CEIP Dr Fleming Feb
- Page 119 and 120: Pressupost: 439-CEIP Dr Fleming Feb
- Page 121 and 122: Pressupost: 439-CEIP Dr Fleming Feb
- Page 123 and 124: Pressupost: 439-CEIP Dr Fleming Feb
- Page 125 and 126: Pressupost: 439-CEIP Dr Fleming Feb
- Page 127 and 128: Pressupost: 439-CEIP Dr Fleming Feb
- Page 129 and 130: Pressupost: 439-CEIP Dr Fleming Feb
- Page 131 and 132: Pressupost: 439-CEIP Dr Fleming Feb
- Page 133 and 134: Pressupost: 439-CEIP Dr Fleming Feb
- Page 135 and 136: Pressupost: 439-CEIP Dr Fleming Feb
- Page 137 and 138: Pressupost: 439-CEIP Dr Fleming Feb
- Page 139 and 140: Pressupost: 439-CEIP Dr Fleming Feb
- Page 141 and 142: Pressupost: 439-CEIP Dr Fleming Feb
- Page 143 and 144: Pressupost: 439-CEIP Dr Fleming Feb
- Page 145 and 146: Pressupost: 439-CEIP Dr Fleming Feb
- Page 147: Pressupost: 439-CEIP Dr Fleming Feb
- Page 151 and 152: Pressupost: 439-CEIP Dr Fleming Feb
- Page 153 and 154: Pressupost: 439-CEIP Dr Fleming Feb
- Page 155 and 156: Pressupost: 439-CEIP Dr Fleming Feb
- Page 157 and 158: Pressupost: 439-CEIP Dr Fleming Feb
- Page 159 and 160: Pressupost: 439-CEIP Dr Fleming Feb
- Page 161 and 162: Pressupost: 439-CEIP Dr Fleming Feb
- Page 163 and 164: Pressupost: 439-CEIP Dr Fleming Feb
- Page 165 and 166: Pressupost: 439-CEIP Dr Fleming Feb
- Page 167 and 168: Pressupost: 439-CEIP Dr Fleming Feb
- Page 169 and 170: Pressupost: 439-CEIP Dr Fleming Feb
- Page 171 and 172: Pressupost: 439-CEIP Dr Fleming Feb
- Page 173 and 174: Pressupost: 439-CEIP Dr Fleming Feb
- Page 175 and 176: Pressupost: 439-CEIP Dr Fleming Feb
- Page 177 and 178: Pressupost: 439-CEIP Dr Fleming Feb
- Page 179 and 180: Pressupost: 439-CEIP Dr Fleming Feb
- Page 181 and 182: Pressupost: 439-CEIP Dr Fleming Feb
- Page 183 and 184: Pressupost: 439-CEIP Dr Fleming Feb
- Page 185 and 186: Pressupost: 439-CEIP Dr Fleming Feb
- Page 187 and 188: Pressupost: 439-CEIP Dr Fleming Feb
- Page 189 and 190: Pressupost: 439-CEIP Dr Fleming Feb
- Page 191 and 192: Pressupost: 439-CEIP Dr Fleming Feb
- Page 193 and 194: Pressupost: 439-CEIP Dr Fleming Feb
- Page 195 and 196: Pressupost: 439-CEIP Dr Fleming Feb
- Page 197 and 198: Pressupost: 439-CEIP Dr Fleming Feb
Pressupost: 439-CEIP Dr Fleming Febrer<br />
JUSTIFICACIÓ DE PREUS Data: 21/9/2010 Pàg.: 148<br />
PARTIDES D'OBRA<br />
E3C LLOSES<br />
E3C5 FORMIGONAMENT DE LLOSES DE FONAMENTS<br />
_____________________________________________________________________________________________________________<br />
E3C515H4 m3 Formigó p/llosa fonam.HA-25/B/20/IIa,bomba<br />
Formigó per a lloses de fonaments, HA-25/B/20/IIa, de consistència tova i grandària màxima <strong>del</strong> granulat 20 mm, abocat amb bomba<br />
Rend.: 1,000 Precio 90,69 €<br />
Unitats Preu EURO Parcial Import<br />
Ma d'obra<br />
A0122000 h Oficial 1a paleta 0,096 /R x 23,02000 = 2,20992<br />
A0140000 h Manobre 0,144 /R x 19,25000 = 2,77200<br />
Maquinària<br />
Materials<br />
Subtotal: 4,98192 4,98192<br />
C1701100 h Camió amb bomba de formigonar 0,080 /R x 136,75000 = 10,94000<br />
B065960B m3 Formigó HA-25/B/20/IIa de consistència tova,<br />
grandària màxima <strong>del</strong> granulat 20 mm, amb >= 275<br />
kg/m3 de ciment, apte per a classe d'exposició IIa<br />
Subtotal: 10,94000 10,94000<br />
1,050 x 71,14000 = 74,69700<br />
Subtotal: 74,69700 74,69700<br />
DESPESES AUXILIARS 1,50 % 0,07473<br />
COST DIRECTE 90,69365<br />
DESPESES INDIRECTES 0,00 % 0,00000<br />
COST EXECUCIÓ MATERIAL 90,69365<br />
E3C LLOSES<br />
E3CB ARMADURES PER A LLOSES DE FONAMENTS<br />
_____________________________________________________________________________________________________________<br />
E3CBDA88 m2 Armadura p/llosa AP500T malla el.b/corrug.ME 15x15cm,D:6-6mm,6x2,2m B500T<br />
Armadura per a lloses AP500 T amb malla electrosoldada de barres corrugades d'acer ME 15x15 cm D:6-6 mm 6x2,2 m B500T UNE-EN<br />
10080, elaborada a l'obra i manipulada a taller<br />
Rend.: 1,000 Precio 3,61 €<br />
Unitats Preu EURO Parcial Import<br />
Ma d'obra<br />
A0134000 h Ajudant ferrallista 0,024 /R x 20,44000 = 0,49056<br />
A0124000 h Oficial 1a ferrallista 0,024 /R x 23,02000 = 0,55248<br />
Materials<br />
Subtotal: 1,04304 1,04304<br />
B0A14200 kg Filferro recuit de diàmetre 1.3 mm 0,0184 x 1,08000 = 0,01987<br />
D0B34136 m2 Malla electrosoldada de barres corrugades d'acer ME<br />
15x15 cm D:6-6 mm 6x2,2 m B500T UNE-EN 10080,<br />
elaborada a l'obra i manipulada a taller<br />
1,000 x 2,52958 = 2,52958<br />
Subtotal: 2,54945 2,54945