Pressupost: 439-CEIP Dr Fleming Febrer JUSTIFICACIÓ DE PREUS Data: 21/9/2010 Pàg.: 143 PARTIDES D'OBRA DESPESES AUXILIARS 1,50 % 0,00452 COST DIRECTE 1,17216 DESPESES INDIRECTES 0,00 % 0,00000 COST EXECUCIÓ MATERIAL 1,17216 E31 RASES I POUS E31D ENCOFRAT PER A RASES I POUS _____________________________________________________________________________________________________________ E31DC100 m2 Encofrat taulons rasa/pou fonament Encofrat amb taulons de fusta per a rases i pous de fonaments Ma d'obra Materials Rend.: 1,000 Precio 19,62 € Unitats Preu EURO Parcial Import A0123000 h Oficial 1a encofrador 0,350 /R x 23,02000 = 8,05700 A0133000 h Ajudant encofrador 0,350 /R x 20,44000 = 7,15400 Subtotal: 15,21100 15,21100 B0A31000 kg Clau acer 0,1501 x 1,15000 = 0,17262 B0DZA000 l Desencofrant 0,030 x 2,51000 = 0,07530 B0D31000 m3 Llata de fusta de pi 0,0044 x 211,79000 = 0,93188 B0D21030 m Tauló de fusta de pi per a 10 usos 6,600 x 0,44000 = 2,90400 B0A14300 kg Filferro recuit de diàmetre 3 mm 0,102 x 0,96000 = 0,09792 Subtotal: 4,18172 4,18172 DESPESES AUXILIARS 1,50 % 0,22817 COST DIRECTE 19,62089 DESPESES INDIRECTES 0,00 % 0,00000 COST EXECUCIÓ MATERIAL 19,62089 E32 MURS DE CONTENCIÓ E325 FORMIGONAMENT DE MURS DE CONTENCIÓ _____________________________________________________________________________________________________________ E32515H4 m3 Formigó per a murs de contenció de 3 m d'alçària com a màxim, HA-25/B/20/IIa+Qb de consistència tova Formigó per a murs de contenció de 3 m d'alçària com a màxim, HA-25/B/20/IIa+Qb de consistència tova i grandària màxima del granulat 20 mm i abocat amb bomba Rend.: 1,413 Precio 82,42 € Unitats Preu EURO Parcial Import Ma d'obra A0122000 h Oficial 1a paleta 0,050 /R x 23,02000 = 0,81458 A0140000 h Manobre 0,150 /R x 19,25000 = 2,04352 Maquinària Subtotal: 2,85810 2,85810 C1701100 h Camió amb bomba de formigonar 0,050 /R x 136,75000 = 4,83900 Subtotal: 4,83900 4,83900
Pressupost: 439-CEIP Dr Fleming Febrer JUSTIFICACIÓ DE PREUS Data: 21/9/2010 Pàg.: 144 PARTIDES D'OBRA Materials B065960B m3 Formigó HA-25/B/20/IIa de consistència tova, grandària màxima del granulat 20 mm, amb >= 275 kg/m3 de ciment, apte per a classe d'exposició IIa 1,050 x 71,14000 = 74,69700 Subtotal: 74,69700 74,69700 DESPESES AUXILIARS 1,00 % 0,02858 COST DIRECTE 82,42268 DESPESES INDIRECTES 0,00 % 0,00000 COST EXECUCIÓ MATERIAL 82,42268 E32 MURS DE CONTENCIÓ E32B ARMADURES PER A MURS DE CONTENCIÓ _____________________________________________________________________________________________________________ E32B300P kg Acer b/corrugada,B 500 S p/armadura mur cont.h= 500 N/mm2, per a l'armadura de murs de contenció, d'una alçària màxima de 3 m Rend.: 1,000 Precio 1,26 € Unitats Preu EURO Parcial Import Ma d'obra A0134000 h Ajudant ferrallista 0,010 /R x 20,44000 = 0,20440 A0124000 h Oficial 1a ferrallista 0,008 /R x 23,02000 = 0,18416 Materials D0B2A100 kg Acer en barres corrugades elaborat a l'obra i manipulat a taller B500S, de límit elàstic >= 500 N/mm2 Subtotal: 0,38856 0,38856 1,000 x 0,86049 = 0,86049 B0A14200 kg Filferro recuit de diàmetre 1.3 mm 0,0061 x 1,08000 = 0,00659 Subtotal: 0,86708 0,86708 DESPESES AUXILIARS 1,50 % 0,00583 COST DIRECTE 1,26147 DESPESES INDIRECTES 0,00 % 0,00000 COST EXECUCIÓ MATERIAL 1,26147 E32B400P kg Armadura p/murs cont. AP500SD barres corrug.,h= 500 N/mm2 Rend.: 1,000 Precio 1,27 € Unitats Preu EURO Parcial Import Ma d'obra A0134000 h Ajudant ferrallista 0,010 /R x 20,44000 = 0,20440 A0124000 h Oficial 1a ferrallista 0,008 /R x 23,02000 = 0,18416 Materials Subtotal: 0,38856 0,38856 B0A14200 kg Filferro recuit de diàmetre 1.3 mm 0,0061 x 1,08000 = 0,00659 D0B2C100 kg Acer en barres corrugades elaborat a l'obra i manipulat a taller B500SD, de límit elàstic >= 500 N/mm2 1,000 x 0,87099 = 0,87099
- Page 93 and 94: Pressupost: 439-CEIP Dr Fleming Feb
- Page 95 and 96: Pressupost: 439-CEIP Dr Fleming Feb
- Page 97 and 98: Pressupost: 439-CEIP Dr Fleming Feb
- Page 99 and 100: Pressupost: 439-CEIP Dr Fleming Feb
- Page 101 and 102: Pressupost: 439-CEIP Dr Fleming Feb
- Page 103 and 104: Pressupost: 439-CEIP Dr Fleming Feb
- Page 105 and 106: Pressupost: 439-CEIP Dr Fleming Feb
- Page 107 and 108: Pressupost: 439-CEIP Dr Fleming Feb
- Page 109 and 110: Pressupost: 439-CEIP Dr Fleming Feb
- Page 111 and 112: Pressupost: 439-CEIP Dr Fleming Feb
- Page 113 and 114: Pressupost: 439-CEIP Dr Fleming Feb
- Page 115 and 116: Pressupost: 439-CEIP Dr Fleming Feb
- Page 117 and 118: Pressupost: 439-CEIP Dr Fleming Feb
- Page 119 and 120: Pressupost: 439-CEIP Dr Fleming Feb
- Page 121 and 122: Pressupost: 439-CEIP Dr Fleming Feb
- Page 123 and 124: Pressupost: 439-CEIP Dr Fleming Feb
- Page 125 and 126: Pressupost: 439-CEIP Dr Fleming Feb
- Page 127 and 128: Pressupost: 439-CEIP Dr Fleming Feb
- Page 129 and 130: Pressupost: 439-CEIP Dr Fleming Feb
- Page 131 and 132: Pressupost: 439-CEIP Dr Fleming Feb
- Page 133 and 134: Pressupost: 439-CEIP Dr Fleming Feb
- Page 135 and 136: Pressupost: 439-CEIP Dr Fleming Feb
- Page 137 and 138: Pressupost: 439-CEIP Dr Fleming Feb
- Page 139 and 140: Pressupost: 439-CEIP Dr Fleming Feb
- Page 141 and 142: Pressupost: 439-CEIP Dr Fleming Feb
- Page 143: Pressupost: 439-CEIP Dr Fleming Feb
- Page 147 and 148: Pressupost: 439-CEIP Dr Fleming Feb
- Page 149 and 150: Pressupost: 439-CEIP Dr Fleming Feb
- Page 151 and 152: Pressupost: 439-CEIP Dr Fleming Feb
- Page 153 and 154: Pressupost: 439-CEIP Dr Fleming Feb
- Page 155 and 156: Pressupost: 439-CEIP Dr Fleming Feb
- Page 157 and 158: Pressupost: 439-CEIP Dr Fleming Feb
- Page 159 and 160: Pressupost: 439-CEIP Dr Fleming Feb
- Page 161 and 162: Pressupost: 439-CEIP Dr Fleming Feb
- Page 163 and 164: Pressupost: 439-CEIP Dr Fleming Feb
- Page 165 and 166: Pressupost: 439-CEIP Dr Fleming Feb
- Page 167 and 168: Pressupost: 439-CEIP Dr Fleming Feb
- Page 169 and 170: Pressupost: 439-CEIP Dr Fleming Feb
- Page 171 and 172: Pressupost: 439-CEIP Dr Fleming Feb
- Page 173 and 174: Pressupost: 439-CEIP Dr Fleming Feb
- Page 175 and 176: Pressupost: 439-CEIP Dr Fleming Feb
- Page 177 and 178: Pressupost: 439-CEIP Dr Fleming Feb
- Page 179 and 180: Pressupost: 439-CEIP Dr Fleming Feb
- Page 181 and 182: Pressupost: 439-CEIP Dr Fleming Feb
- Page 183 and 184: Pressupost: 439-CEIP Dr Fleming Feb
- Page 185 and 186: Pressupost: 439-CEIP Dr Fleming Feb
- Page 187 and 188: Pressupost: 439-CEIP Dr Fleming Feb
- Page 189 and 190: Pressupost: 439-CEIP Dr Fleming Feb
- Page 191 and 192: Pressupost: 439-CEIP Dr Fleming Feb
- Page 193 and 194: Pressupost: 439-CEIP Dr Fleming Feb
Pressupost: 439-CEIP Dr Fleming Febrer<br />
JUSTIFICACIÓ DE PREUS Data: 21/9/2010 Pàg.: 143<br />
PARTIDES D'OBRA<br />
DESPESES AUXILIARS 1,50 % 0,00452<br />
COST DIRECTE 1,17216<br />
DESPESES INDIRECTES 0,00 % 0,00000<br />
COST EXECUCIÓ MATERIAL 1,17216<br />
E31 RASES I POUS<br />
E31D ENCOFRAT PER A RASES I POUS<br />
_____________________________________________________________________________________________________________<br />
E31DC100 m2 Encofrat taulons rasa/pou fonament<br />
Encofrat amb taulons de fusta per a rases i pous de fonaments<br />
Ma d'obra<br />
Materials<br />
Rend.: 1,000 Precio 19,62 €<br />
Unitats Preu EURO Parcial Import<br />
A0123000 h Oficial 1a encofrador 0,350 /R x 23,02000 = 8,05700<br />
A0133000 h Ajudant encofrador 0,350 /R x 20,44000 = 7,15400<br />
Subtotal: 15,21100 15,21100<br />
B0A31000 kg Clau acer 0,1501 x 1,15000 = 0,17262<br />
B0DZA000 l Desencofrant 0,030 x 2,51000 = 0,07530<br />
B0D31000 m3 Llata de fusta de pi 0,0044 x 211,79000 = 0,93188<br />
B0D21030 m Tauló de fusta de pi per a 10 usos 6,600 x 0,44000 = 2,90400<br />
B0A14300 kg Filferro recuit de diàmetre 3 mm 0,102 x 0,96000 = 0,09792<br />
Subtotal: 4,18172 4,18172<br />
DESPESES AUXILIARS 1,50 % 0,22817<br />
COST DIRECTE 19,62089<br />
DESPESES INDIRECTES 0,00 % 0,00000<br />
COST EXECUCIÓ MATERIAL 19,62089<br />
E32 MURS DE CONTENCIÓ<br />
E325 FORMIGONAMENT DE MURS DE CONTENCIÓ<br />
_____________________________________________________________________________________________________________<br />
E32515H4 m3 Formigó per a murs de contenció de 3 m d'alçària com a màxim, HA-25/B/20/IIa+Qb de consistència tova<br />
Formigó per a murs de contenció de 3 m d'alçària com a màxim, HA-25/B/20/IIa+Qb de consistència tova i grandària màxima <strong>del</strong> granulat 20<br />
mm i abocat amb bomba<br />
Rend.: 1,413 Precio 82,42 €<br />
Unitats Preu EURO Parcial Import<br />
Ma d'obra<br />
A0122000 h Oficial 1a paleta 0,050 /R x 23,02000 = 0,81458<br />
A0140000 h Manobre 0,150 /R x 19,25000 = 2,04352<br />
Maquinària<br />
Subtotal: 2,85810 2,85810<br />
C1701100 h Camió amb bomba de formigonar 0,050 /R x 136,75000 = 4,83900<br />
Subtotal: 4,83900 4,83900