95<br />

Solid Fuel Optimization: Ashaka (Nigeria)<br />

� Ashaka plant was operated with heavy fuel oil<br />

� Fuels shortages <strong>and</strong> exceptional kiln s<strong>to</strong>ppages<br />

� Proposed solution<br />

� Results<br />

� Integrate backwards with a nearby lignite mine<br />

� Invest in grinding <strong>and</strong> fuel conditioning (safety with HV fuels)<br />

Economics:<br />

� Investment of 37M€ for grinding shop <strong>and</strong> mine<br />

� Fuel bill reduced by 60% <strong>and</strong> no s<strong>to</strong>ppages with better logistics