18.02.2013 Views

Presentation to the analysts and investors - Lafarge

Presentation to the analysts and investors - Lafarge

Presentation to the analysts and investors - Lafarge

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

104<br />

Aggregates: 4 Main Levers <strong>to</strong> Reduce Costs<br />

1<br />

2<br />

3<br />

4<br />

� Aggregates operating model : ROCK<br />

� Strong focus on cost management<br />

• KPI improvement<br />

• Cost reduction<br />

• Down <strong>to</strong> site level<br />

� Capacity optimization<br />

� Adjusting capacity <strong>to</strong> volume decline<br />

� Reducing fixed costs<br />

� Logistics improvement<br />

� Project at Division level<br />

� First: realize quick wins<br />

� Then: Build <strong>and</strong> roll out a ROCK Logistics module<br />

with KPI, maturity matrix <strong>and</strong> <strong>to</strong>ol box of best practices<br />

� Purchasing performance<br />

� New global contracts<br />

Levers<br />

� Increased compliance with existing contracts

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!