3 Other operating modes of the G-18.mft - NRI
3 Other operating modes of the G-18.mft - NRI
3 Other operating modes of the G-18.mft - NRI
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
MAINTENANCE AND SERVICE G-<strong>18.mft</strong> with vending machine control system<br />
8 Maintenance and service<br />
In this chapter you will out how to<br />
• clean <strong>the</strong> G-<strong>18.mft</strong>,<br />
• indicate <strong>the</strong> battery voltage using <strong>the</strong> light-emitting diodes on <strong>the</strong><br />
validator,<br />
• test <strong>the</strong> vending machine components to be controlled manually,<br />
• interpret status and error messages <strong>of</strong> <strong>the</strong> pilot lights in <strong>the</strong> machine<br />
door or clear faults,<br />
• remedy <strong>the</strong> cause <strong>of</strong> o<strong>the</strong>r malfunctions.<br />
Cleaning coin validator<br />
The coin validator must only be wiped clean from time to time with a damp<br />
cloth (lukewarm water with a small amount <strong>of</strong> washing-up liquid): Beyond<br />
that, no fur<strong>the</strong>r maintenance work is required.<br />
Under no circumstances may <strong>the</strong> cloth be so wet that fluid<br />
runs into <strong>the</strong> device. <strong>O<strong>the</strong>r</strong>wise <strong>the</strong> PCB will be damaged.<br />
Do not use any solvents or scouring agents that will attack <strong>the</strong><br />
plastic material <strong>of</strong> <strong>the</strong> device.<br />
1 De-energize <strong>the</strong> coin validator.<br />
2 Carefully open <strong>the</strong> flight deck 1 on <strong>the</strong> left-hand side and hold it open<br />
(see Fig. 4).<br />
3 Use a cloth to wipe <strong>of</strong>f <strong>the</strong> coin runway inside <strong>the</strong> coin validator.<br />
4 Close <strong>the</strong> flight deck again.<br />
5 Provide <strong>the</strong> coin validator with voltage again.<br />
Fig. 4: Opening <strong>the</strong> flight deck<br />
40 National Rejectors, Inc. GmbH, Buxtehude<br />
1