18.02.2013 Views

3 Other operating modes of the G-18.mft - NRI

3 Other operating modes of the G-18.mft - NRI

3 Other operating modes of the G-18.mft - NRI

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DESIGN G-<strong>18.mft</strong> with vending machine control system<br />

4 Design<br />

This chapter describes <strong>the</strong> general design <strong>of</strong> <strong>the</strong> coin validator and <strong>the</strong><br />

additional control PCB and also <strong>the</strong> components that are important for<br />

<strong>operating</strong> <strong>the</strong> device:<br />

• Return lever, switching blocks, light-emitting diode, interfaces, label<br />

• Interfaces, button and switches, pilot lights<br />

The coin validator<br />

10<br />

1 Return lever<br />

2 Coin insert funnel<br />

3 Switching blocks S1–S3<br />

4 Mounting studs<br />

5 MDB interface – optional periphery<br />

(display, card reader)<br />

6 Interface – additional control PCB<br />

7<br />

4<br />

4<br />

Fig. 1a: Design – G-<strong>18.mft</strong><br />

7 Light-emitting diode<br />

8 Interface – additional control PCB<br />

9 Coin outlet<br />

10 Configuration interface –<br />

PC programming station (WinEMP)/<br />

Palm handheld (PalmEMP)<br />

14 National Rejectors, Inc. GmbH, Buxtehude<br />

2<br />

8<br />

5<br />

6<br />

3<br />

1<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!