Ventura IPC Instruction Manual pdf - Kuhnke
Ventura IPC Instruction Manual pdf - Kuhnke
Ventura IPC Instruction Manual pdf - Kuhnke
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
KUHNKE Automation Hardware<br />
4 Installation<br />
4.1 Flange Plate Installation<br />
Control PC <strong>Ventura</strong> <strong>IPC</strong> is designed for front panel installation. However,<br />
you can also choose to install the unit on any other even surface using the<br />
flange fitting. Please take note of the admissible ambient conditions during<br />
storage and operation as summarised in the Technical Data tables.<br />
A flange for installing the device at the rear wall of a switching cabinet or on<br />
any other even surface can be ordered as a separate accessory option. The<br />
<strong>Ventura</strong> 800 / 1000 series has the flange fitting as a component part of the<br />
housing. In these cases, the flange plate need not be ordered separately.<br />
4.1.1 To Install the Screw Plate Adapter (<strong>Ventura</strong> <strong>IPC</strong> 300 / 700)<br />
4.1.2 To Install the Device<br />
• Use screws (2) to attach the flange plate (1) to the back of the unit.<br />
• Drill holes into the mounting surface as shown on the illustration.<br />
• Turn all but approx. 5 mm of the screws into the holes drilled into the<br />
mounting surface.<br />
• Put on the device and push down.<br />
• Turn in the screws until tight.<br />
Please remember that the plate and screws must not only be able to sustain<br />
the weight of the device but also that of the cables.<br />
E 674 GB 31<br />
07.03.2007