Krasnodar GRES Project 86-33 7 Volu
- Page 3 and 4:
2.1.1 EIA Preparation. Review. and
- Page 5 and 6:
4.1 Air ...........................
- Page 7 and 8:
4.4.2 Land Owners .................
- Page 9 and 10:
....................... ....... 5.2
- Page 11 and 12:
9.3 Continuous Monitoring of Emissi
- Page 13 and 14:
e I. 1 Introduction 1.0 EXECUTIVE S
- Page 15 and 16:
operation of the Krasnodar GRES fac
- Page 17 and 18:
e plant staffing structure. Departm
- Page 19 and 20:
e Plant Sewage Discharge - Potentia
- Page 21 and 22:
The off-site air monitoring station
- Page 23 and 24:
In addition, the plant electric tra
- Page 25 and 26:
@ In addition, several public meeti
- Page 27 and 28:
@ Training facilities should be ins
- Page 29 and 30:
2.0 POLICY, LEGAL AND ADMINISTRATIV
- Page 31 and 32:
2.1.1 EIA Preparation, Review, and
- Page 33 and 34:
e Regulations by the Russian Federa
- Page 35 and 36:
* and 2.2.3 Occupational Health and
- Page 37 and 38:
electromagnetic field intensities b
- Page 39 and 40: PH Contaminant or Parameter BOD Hea
- Page 41 and 42: TABLE 2.6 Electromagnetic Field Int
- Page 43 and 44: negligence or non-negligence; degre
- Page 45 and 46: e Odessa Declaration on the Black S
- Page 47 and 48: Environmental and workplace quality
- Page 49 and 50: consists of large gravel mixed with
- Page 51 and 52: 3.2.7 Water Source The source of op
- Page 53 and 54: standards in addition to any design
- Page 55 and 56: 3.3.4 Estimated Plant Emissions Air
- Page 57 and 58: Adding a new double-circuit 220 kV
- Page 59 and 60: The summer is hot and long (it begi
- Page 61 and 62: Notes: 1. Previous meteorological s
- Page 63 and 64: 4.1 .I .4 Annual and Seasonal Preci
- Page 65 and 66: Months I I I I I I IV V V I VII Vll
- Page 67 and 68: During rainfall and fog the western
- Page 69 and 70: Years 1979 1979 1980 1980 1980 1980
- Page 71 and 72: 4.1.3 Air Quality Impact by Nitroge
- Page 73 and 74: Appendices 8 and 9 are indicative o
- Page 75 and 76: River Laba Malaya Laba Point Doguzh
- Page 77 and 78: a steady low water level which can
- Page 79 and 80: i, Section F, ' 1 m BS m m2 1 41 4.
- Page 81 and 82: Section 1 2 3 4 Sum i, m BS Q I m3/
- Page 83 and 84: Table 4.21 Average Annual Water Dis
- Page 85 and 86: River Site La ba Kaladzhinskaya La
- Page 87 and 88: Dimensionality 8 % mln. m3 8 O h ml
- Page 89: Table 4.29 Chemical Composition of
- Page 93 and 94: 4.2.1 .I0 Water Consumers Downstrea
- Page 95 and 96: I: uaad= -,-maurn, 0 O > r r > Q =
- Page 97 and 98: Deeper aquifers of the upper hydrog
- Page 99 and 100: A Sketch of Hydrogeological Situati
- Page 101 and 102: section. The section center is note
- Page 103 and 104: confined to Chugushsky and Voznesen
- Page 105 and 106: the east, it land slides, deposits
- Page 107 and 108: 4.3.1.7 Permeability The base of th
- Page 109 and 110: 4.3.1.10 Geological Processes and A
- Page 111 and 112: 30 25 Soils types in region B Compa
- Page 113 and 114: Very low water especially on flat a
- Page 115 and 116: Precipitation during this period wi
- Page 117 and 118: 4.3.1.1 1.2 Type of Pollutants, Loc
- Page 119 and 120: Table 4.40. A List of Rural Settlem
- Page 121 and 122: number of polyclinics - 3; number o
- Page 123 and 124: Railroads - single truck railroad K
- Page 125 and 126: 4.5.1.3 Rare and Endangered Species
- Page 127 and 128: 4.5.1.8 Unique Habitats Unique habi
- Page 129 and 130: Caucasian subalpine tall grass comm
- Page 131 and 132: River valleys and mountain brooks a
- Page 133 and 134: water balance in mountain rivers),
- Page 135 and 136: 4.6.1.3.2 Products, Services, Recre
- Page 137 and 138: 5. IMPACT ASSESSMENT Energy is esse
- Page 139 and 140: 1. 2 3 Construction Stage Number Pr
- Page 141 and 142:
e 5.1.2.1 Work Force 480 local cons
- Page 143 and 144:
In the area of the project site the
- Page 145 and 146:
Waste Waste gases Sanitary waste Dr
- Page 147 and 148:
* following MPC for nitrogen oxides
- Page 149 and 150:
During atmospheric inversions, the
- Page 151 and 152:
6. accidental leakage of storage re
- Page 153 and 154:
100 m from the source it will cool
- Page 155 and 156:
of Psebaj, MTF # 4 on the right ban
- Page 157 and 158:
@ Established waste water compositi
- Page 159 and 160:
Perepravnaya Power Plant . -- Figur
- Page 161 and 162:
Noise Levels - ~ B A Expected level
- Page 163 and 164:
development areas of 2 km and great
- Page 165 and 166:
e 4.79 tons per year (page 23 of th
- Page 167 and 168:
@ Part of the nitrogen can be absor
- Page 169 and 170:
# 10 11 12 13 14 Construction Facil
- Page 171 and 172:
* on The following facilities shall
- Page 173 and 174:
Table 5.13 Sources and Extent of Po
- Page 175 and 176:
instruction and existing "Safe Oper
- Page 177 and 178:
Substances Dust Mn2 Fluorides Silic
- Page 179 and 180:
@ A closed system of gas treatment
- Page 181 and 182:
The transmission line project for t
- Page 183 and 184:
geomagnetic background field value.
- Page 185 and 186:
There will be no impact on general
- Page 187 and 188:
protection and safety regulations,
- Page 189 and 190:
at the demand of supervisory techni
- Page 191 and 192:
training, assessment, understudy an
- Page 193 and 194:
Accident and safety protection trai
- Page 195 and 196:
- examination and current and gener
- Page 197 and 198:
- keeping the sanitary and food ser
- Page 199 and 200:
The Krasnodar GRES shall employ spe
- Page 201 and 202:
7.0 ANALYSIS OF ALTERNATIVES This s
- Page 203 and 204:
a a 7.2 Alternative Power Generatio
- Page 205 and 206:
7.3 Alternative Plant, Water Pipeli
- Page 207 and 208:
@ fogs or plumes that may be associ
- Page 209 and 210:
Thus, there are no viable alternati
- Page 211 and 212:
8.0 ENVIRONMENTAL IMPACT MITIGATION
- Page 213 and 214:
Impacts Reduced air quality due to
- Page 215 and 216:
Impacts Sudden, large, increase in
- Page 217 and 218:
9.0 MONITORING PLAN In compliance w
- Page 219 and 220:
Special hydrological systems record
- Page 221 and 222:
9.5.1. Regions of Potential Effects
- Page 223 and 224:
- Cordon of the Caucasian biosphere
- Page 225 and 226:
The project manager will hold month
- Page 227 and 228:
The contract for the plant should c
- Page 230 and 231:
Regulatory Relation (0) Operation M
- Page 232 and 233:
Plant Engineer (1) Assistant Plant
- Page 234 and 235:
Ku ban State Agricultural Universit
- Page 236 and 237:
7. The Mostovskoy site is located c
- Page 238 and 239:
e helpful. An early meeting to desc
- Page 240 and 241:
Molokanov: Anikin: Serebryakov: Ani
- Page 242 and 243:
Serebryakov: Anikin: Frolov: Moloka
- Page 244 and 245:
KRASNODAR GRES EIA and that is why
- Page 246 and 247:
Domkom stev: They didn't exactly go
- Page 248 and 249:
Anreychuk: Let it be 8 pages, but p
- Page 250 and 251:
1 1.3 Public Hearing The public hea
- Page 252 and 253:
[Signatures] Approved by: V. M. Ryl
- Page 254 and 255:
KRASNODAR PUBLIC HEARINGS LIST OF A
- Page 256 and 257:
DISCUSSIONS OF A PUBLIC HEARING OF
- Page 258 and 259:
Question: V. Rylenko. How does the
- Page 260 and 261:
Our region is a seismic area. How i
- Page 262 and 263:
comparison results would have been
- Page 264 and 265:
September October December .' Appen
- Page 266 and 267:
March April Wind rose (spring perio
- Page 268 and 269:
Appendix 6 Wind rose under differen
- Page 270 and 271:
&Iostovsky District 1. 00253831 'Jy
- Page 272 and 273:
agent code untreated including soli
- Page 274 and 275:
Psebaiskie GATP 1 Pervomajskaja st.
- Page 276 and 277:
agent code 7 5132332 Mostovskoe DRS
- Page 278 and 279:
Town of Labinsk Appendix 9 Air Disc
- Page 280 and 281:
10 0255383 "Labinsky wood-working p
- Page 282 and 283:
12 0336638 "Labinsky oil mill" join
- Page 284 and 285:
Labinsky cannery 108 Krasnaja st.,
- Page 286 and 287:
15 0863992 Labinskaja RTP 20 Chaltu
- Page 288 and 289:
0940673 "Labinsky elevator" stock c
- Page 290 and 291:
"Chemist" stock company (Chemical f
- Page 292 and 293:
19 3091180 "Krasnodaravtotrans" (a/
- Page 294 and 295:
21 5293786 "ZSM" company (Construct
- Page 296 and 297:
23 5311363 Labinsky Bakery 109 Gaga
- Page 298 and 299:
25 0001145 Labinskaya service stati
- Page 300:
THE MAP OF SOURCES, OBJECTS AND IMP
- Page 304 and 305:
Appendix 14
- Page 306 and 307:
Appendix 16
- Page 308 and 309:
1. Mostovsky PGT 2. 'Klever' collec
- Page 310 and 311:
Maikop . The scheme of the Speciall
- Page 312:
The Impact of the Krasnodar GRES Pr
- Page 316:
JIJI~UIOI~JI~I rnq nno AOZZ r J!IJI