Adding a new double-circuit 220 kV line from Kurgannaya to Zilposelok via<br />

the <strong>Krasnodar</strong> <strong>GRES</strong>,<br />

Rerouting one circuit of the existing double-circuit 220 kV 185 krn line<br />

between Tzentralnaya and Armavir via Cheremushki, and<br />

Rerouting the circuits of the above line via Kurgannaya.<br />

3.4. I The Switchyards<br />

The <strong>Krasnodar</strong> <strong>GRES</strong> plant will have two switchyards, one at 500 kV and one at<br />

220 kV. The two switchyards will be interconnected by three single phase 167<br />

MVA non-PCB containing autotransformers. One spare transformer will be<br />

provided. A 180 MVA, 500 kV three phase shunt reactor will be provided to<br />

compensate for the reactive power in the 500 kV line. The switchyards will be<br />

designed to be able to accommodate connections to the three new substations<br />

and to the existing 500 kV and 220 kV substations.<br />

3.5 Gas Pipeline<br />

A new natural gas pipeline, 60 km in length and 700 mm in diameter will connect<br />

the plant to the Trans-Caucasus gas pipeline. The new gas pipeline will be<br />

installed underground and will include all necessary auxiliary components, such as<br />

valves, restraints, supports, cathodic protection, etc. to assure satisfactory<br />

operation. A metering station will be located on the plant site. The pipeline will<br />

be constructed and operated by GazProm and they will also prepare the EIA for<br />

the pipeline.<br />

3.6 Staffing For Operations<br />

The permanent staffing levels recommended are contained in Chapter 10. The<br />

duties of each functional title will be described in the company procedures<br />

manual to be prepared by Kubanenergo.<br />