Contaminant<br />

Calcium<br />

Magnesium<br />

Sodium &<br />

Potassium<br />

Sulfate<br />

Estimated Water Effluent Quality mgll<br />

Value<br />

156<br />

10<br />

86<br />

337<br />

Sanitary waste water discharges to the Mostovskoya Village Waste Water<br />

Treatment Plant, during normal plant operations, are estimated at 0.7 cu.m./hour.<br />

3.4 Power Transmission System<br />

Contaminant<br />

Chloride<br />

Nitrate<br />

Carbonate<br />

Silicate<br />

Total Salts<br />

Value<br />

21<br />

8<br />

2<br />

The plant will be connected to the existing 220 kV and 500 kV transmission<br />

systems in the North Caucasus Region. New transmission lines will be<br />

constructed for this purpose and the existing transmission lines running through<br />

the site will be rerouted.<br />

This design was accomplished by carrying out a detailed study of the region's<br />

existing transmission system to determine the upgrades that will be required to<br />

bring 900 MW of new capacity on line. These studies included detailed load flow<br />

and fault analysis, dynamic studies and system stability studies. These studies<br />

assumed that the existing ties between the North Caucasus region and the<br />

Ukraine will remain available and that the first stage of the interregna1 tie between<br />

the Center region of the Russian Integrated System and the North Caucasus<br />

comprising three 500 kV lines from Balakovskaya Nuclear Plant to Rostovskaya<br />

Nuclear Plant will also become available.<br />

The load flow studies indicated that to deliver power to the regional consumers at<br />

220 kV, three new substations will need to be constructed in Kurgannaya,<br />

Cheremushki, and Zilposelok. These additions and changes include:<br />

I<br />

890<br />

Rerouting the existing 500 kV, 310 km line between Tzentralinaya and<br />

Zelenchukskaya via the 500 kV switchyard at the <strong>Krasnodar</strong> <strong>GRES</strong>,<br />

Adding a new single-circuit 220 kV line from the <strong>Krasnodar</strong> <strong>GRES</strong> to<br />

Cheremoshki substation,<br />

PAGE 3-9