Krasnodar GRES Project Volume I11 Environmental Assessment

Krasnodar GRES Project Volume I11 Environmental Assessment

Krasnodar GRES Project Volume I11 Environmental Assessment

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

@<br />

a facility.<br />

Maintenance Training<br />

- Electrical<br />

- Mechanical<br />

- Welding<br />

- Instruments and Controls<br />

Chemistry<br />

Equipment Operators<br />

Industrial Safety<br />

Management Information .Systems<br />

Inventory Control<br />

<strong>Environmental</strong> Control<br />

Fuel Handling<br />

Training facilities should be installed at an early stage in construction to provide<br />

for adequate training time of personnel prior to startup. The training facilities<br />

should include:<br />

Classrooms<br />

Operations Simulator<br />

Welding Training and Testing Facilities<br />

Chemical Laboratory*<br />

Machine Shop*<br />

Electrical Shop*<br />

Instrument and Controls Shop*<br />

"Chemical laboratory, machine shop, electric shop, and instrument shop could be<br />

the working shops constructed for the ongoing operations and maintenance of the<br />

PAGE 10-3<br />

2%'.