Krasnodar GRES Project Volume I11 Environmental Assessment
Krasnodar GRES Project Volume I11 Environmental Assessment Krasnodar GRES Project Volume I11 Environmental Assessment
located 0.5 km downstream of the waste water disposal location (section 9.5.1) Groundwater pollution. Groundwater monitoring and control is achieved through the delineation of sanitary protection zones (SPZ) (see section 5.2.1.2), restriction of economic activity in these zones, and periodic sampling of the source water. 9.5.3 Regions of High Ecological Sensitivity In addition to the populated areas of Mostovskoy, Perepravnaya, and the residential area of the power plant, the Caucasus State Biosphere reserve and the Pseibaisky sanctuary are considered to be regions of high ecological sensitivity. 9.6 Plan of Measures for Mitigation of Adverse Effects The supervisor of engineering and technical personnel of the power plant shall be appointed by an order of the Director of Krasnodar GRES to be responsible for fulfilling the plan of measures aimed at mitigation of adverse environmental impacts (Chapter 6). The supervisor of engineering shall make reports on the fulfillment of the plan at a general meeting of the power plant stockholders. 9.7 Required Mo'nitoring Equipment Continuous air pollution monitoring equipment is to be supplied along with basic electrical hardware. It shall include a set of detectors for measuring all the parameters of exhaust gases (which are installed at all the key points of the flue gas lines up to the smoke stack) and one meteorological monitoring station. The system shall be capable of measuring and recording the concentrations of NOx, SO2, CO, CnHm, and particulates in compliance with the Russian regulatory documents for environmental control. In addition, ambient air monitoring shall be conducted at the following measuring sites for NOx, S02, CO, CnHm, and Vanadium: - Mostovskoy settlement - Perepravnaya settlement - Psebai settlement PAGE 9-6
- Cordon of the Caucasian biosphere reserve. Establishment of an ambient air monitoring station at the Caucasus biosphere reserve has an estimated capital cost of approximately $250,000.00 and an annual operation and maintenance cost of approximately $15,000.00. Waste water disposal monitoring shall be provided by the use of one mobile water quality monitoring station with automatic measuring of concentrations with regard to MPC indices (section 5.5.1.2). Surface Water Locations Laba River - 0.5 km downstream of the Krasnodar GRES (i.e., approximately 9 km upstream of the Mostovskoy wastewater treatment plant); Laba River - 0.5 km downstream of the Mostovskoy wastewater treatment plant; Monitoring Well Locations Potable water intake; Adjacent to the mineralized waste storage tanks; Outside the fenceline of Krasnodar GRES and within the SPZ. Observations shall be carried out periodically at intervals established by the local environmental control bodies of the MEPNR and the sanitary- epidemiological inspectorate of the Russian Federation. PAGE 9-7
- Page 172 and 173: during oil transportation. The othe
- Page 174 and 175: are then directed to an oillwater s
- Page 176 and 177: Biological reclamation - bogging an
- Page 178 and 179: - direct impact on vegetation, fore
- Page 180 and 181: 5.2.3.2 Transmission Lines 5.2.3.2.
- Page 182 and 183: 5.2.3.2.2 Impacts on Bird Migration
- Page 184 and 185: Positive lmpacts Additional facilit
- Page 186 and 187: 6.0 WORKER HEALTH AND SAFETY Health
- Page 188 and 189: In the course of practical training
- Page 190 and 191: knowledge of power generator's safe
- Page 192 and 193: @ Urgent instruction is carried out
- Page 194 and 195: - preventive maintenance of the equ
- Page 196 and 197: Governing Standard: "Regulations in
- Page 198 and 199: The Plant Substation; Fenced-off ar
- Page 200 and 201: CONTAMINANT RUSSIA CO NO2 SO2 Parti
- Page 202 and 203: urn agricultural wastes for fuel, t
- Page 204 and 205: production and the large land area
- Page 206 and 207: Interconnection to the existing tra
- Page 208 and 209: 7.6 Alternative Water Supplies and
- Page 210 and 211: 4. "Report No. 256". Krasnodar Terr
- Page 212 and 213: Target of Impact ENVIRONMENTAL Air
- Page 214 and 215: Impacts Water supply shortages due
- Page 216 and 217: Target of Impact Air Quality Surfac
- Page 218 and 219: Noise levels shall be measured at a
- Page 220 and 221: mobile sources (trucks, loaders, et
- Page 224 and 225: @ 10.0 ENVIRONMENTAL MANAGEMENT AND
- Page 226 and 227: @ a facility. Maintenance Training
- Page 228: e conducted. In addition, staff wil
- Page 231 and 232: Primary Planning Responsibility Rev
- Page 233 and 234: 11.0 INTERAGENCY COORDINATION AND P
- Page 235 and 236: 2. Burns and Roe indicated that Gen
- Page 237 and 238: Discussion: 1. The Regional Environ
- Page 239 and 240: V.V. Fedorovich, Editor and Publish
- Page 241 and 242: * Molokanov: Question: Anikin: Molo
- Page 243 and 244: Molokanov: We have our man in the a
- Page 245 and 246: nuclear power industry to judge it?
- Page 247 and 248: Lazov: There aint' any gas. The nuc
- Page 249 and 250: 1 1.2.6 Mostovskoy District Represe
- Page 251 and 252: Having reviewed major project techn
- Page 253 and 254: a 1 1.3.2 Attendees 1. B. G. Teresh
- Page 255 and 256: 1 1.3.3 Agenda of Public Hearing Pu
- Page 257 and 258: Answer: Mr 0. Yeschenko. The plant
- Page 259 and 260: @ 11.3.4 Newspaper Coverage of Publ
- Page 261 and 262: Mazut will be used during the start
- Page 263 and 264: June July August Wind rose (summer
- Page 265 and 266: December January February Wind rose
- Page 267 and 268: I Appendix 5 Wind rose at different
- Page 269 and 270: Wind rose in foggy weather and in p
- Page 271 and 272: 1 0285004 'Kubansky Gypsum' stock c
- Cordon of the Caucasian biosphere reserve.<br />
Establishment of an ambient air monitoring station at the Caucasus<br />
biosphere reserve has an estimated capital cost of approximately<br />
$250,000.00 and an annual operation and maintenance cost of<br />
approximately $15,000.00.<br />
Waste water disposal monitoring shall be provided by the use of one mobile<br />
water quality monitoring station with automatic measuring of<br />
concentrations with regard to MPC indices (section 5.5.1.2).<br />
Surface Water Locations<br />
Laba River - 0.5 km downstream of the <strong>Krasnodar</strong> <strong>GRES</strong> (i.e.,<br />
approximately 9 km upstream of the Mostovskoy wastewater<br />
treatment plant);<br />
Laba River - 0.5 km downstream of the Mostovskoy wastewater<br />
treatment plant;<br />
Monitoring Well Locations<br />
Potable water intake;<br />
Adjacent to the mineralized waste storage tanks;<br />
Outside the fenceline of <strong>Krasnodar</strong> <strong>GRES</strong> and within the SPZ.<br />
Observations shall be carried out periodically at intervals established by the<br />
local environmental control bodies of the MEPNR and the sanitary-<br />
epidemiological inspectorate of the Russian Federation.<br />
PAGE 9-7