Krasnodar GRES Project Volume I11 Environmental Assessment

Krasnodar GRES Project Volume I11 Environmental Assessment Krasnodar GRES Project Volume I11 Environmental Assessment

pdf.usaid.gov
from pdf.usaid.gov More from this publisher
14.02.2013 Views

Target of Impact Air Quality Surface Water Quality & Quantity Ground Water Quality & Quantity Flora and Fauna Land Use Plant Personnel Local Population Stack Emissions 0 0 0 0 0 0 0 Key: 0 = No lmpact I = Insignificant M = Moderate S = Severe Table 8-3 Cause and Targets of Environmental Impacts Associated with Routine Plant Operation Water Usage 0 I(-) 0 I(-) 0 0 M(+) Process Water Discharge 0 0 0 0 0 0 0 Cause of lmpact Plant Sewage Discharge 0 0 0 0 0 0 0 Noise Level + = Positive - = Negative * = lnsignificant with proper protection 0 0 0 I(-) 0 M(-I* I(-) Solid Waste Disposal 0 0 0 I(+) I(+) 0 I( +) Hazardous Waste Disposal 0 0 0 0 0 0 0 Electro- Magnetic Frequency 0 0 0 0 0 0 0 I

9.0 MONITORING PLAN In compliance with an agreement between the project ownership group and Regional environmental authorities, the environmental monitoring program for the Krasnodar GRES power plant shall be developed by the Dzerzhinsky research institute in two stages (power plant construction and power plant operation) and this plan shall be approved by the local committee for environmental control and conservation of natural resources. 9.1 Ecological Control During Construction The basic adverse effects during construction will be noise, dust and air pollution by exhaust gases of motor vehicles. The Krasnodar GRES ownership group shall arrange for environmental monitoring of noise, dust and exhaust gases of motor vehicles (CO, CnHrn). For this purpose, a mobile station for environmental monitoring shall be set up at the construction site to measure dust and noise once a month. In addition, CO and hydrocarbon emissions will be measured only for on-site motor vehicles which lack an official exhaust inspection certificate. The primary documents of environmental monitoring (data and official monitoring reports) will be archived and submitted to the appropriate 0 officials of the Ministry of Environmental Protection and Natural Resources (MEPNR) and to the representative of the Public Environmental Control Commission (PECC). The PECC shall be formed by a special decree of the Mostovskoy Region. In addition, one time background monitoring will be conducted prior to construction activities. 9.2. Identification of Basic Ecological Conditions Prior to commencement of construction activities, the following areas shall be evaluated in order to establish up-to-date baseline conditions: Background air pollutant concentrations shall be measured within the probable impact area of the Krasnodar GRES; Water quality parameters shall be measured in the Laba River 0.5 km upstream from the discharge point of the Mostovskoy wastewater treatment plant; Drinking water parameters shall be measured from the potable water intake at Andryuki; PAGE 9-1

9.0 MONITORING PLAN<br />

In compliance with an agreement between the project ownership group and<br />

Regional environmental authorities, the environmental monitoring program<br />

for the <strong>Krasnodar</strong> <strong>GRES</strong> power plant shall be developed by the Dzerzhinsky<br />

research institute in two stages (power plant construction and power plant<br />

operation) and this plan shall be approved by the local committee for<br />

environmental control and conservation of natural resources.<br />

9.1 Ecological Control During Construction<br />

The basic adverse effects during construction will be noise, dust and air<br />

pollution by exhaust gases of motor vehicles. The <strong>Krasnodar</strong> <strong>GRES</strong><br />

ownership group shall arrange for environmental monitoring of noise, dust<br />

and exhaust gases of motor vehicles (CO, CnHrn). For this purpose, a mobile<br />

station for environmental monitoring shall be set up at the construction site<br />

to measure dust and noise once a month. In addition, CO and hydrocarbon<br />

emissions will be measured only for on-site motor vehicles which lack an<br />

official exhaust inspection certificate.<br />

The primary documents of environmental monitoring (data and official<br />

monitoring reports) will be archived and submitted to the appropriate<br />

0 officials of the Ministry of <strong>Environmental</strong> Protection and Natural Resources<br />

(MEPNR) and to the representative of the Public <strong>Environmental</strong> Control<br />

Commission (PECC). The PECC shall be formed by a special decree of the<br />

Mostovskoy Region. In addition, one time background monitoring will be<br />

conducted prior to construction activities.<br />

9.2. Identification of Basic Ecological Conditions<br />

Prior to commencement of construction activities, the following areas shall<br />

be evaluated in order to establish up-to-date baseline conditions:<br />

Background air pollutant concentrations shall be measured within the<br />

probable impact area of the <strong>Krasnodar</strong> <strong>GRES</strong>;<br />

Water quality parameters shall be measured in the Laba River 0.5 km<br />

upstream from the discharge point of the Mostovskoy wastewater<br />

treatment plant;<br />

Drinking water parameters shall be measured from the potable water<br />

intake at Andryuki;<br />

PAGE 9-1