Target of Impact Air Quality Surface Water Quality & Quantity Ground Water Quality & Quantity Flora and Fauna Land Use Plant Personnel Local Population Stack Emissions 0 0 0 0 0 0 0 Key: 0 = No lmpact I = Insignificant M = Moderate S = Severe Table 8-3 Cause and Targets of Environmental Impacts Associated with Routine Plant Operation Water Usage 0 I(-) 0 I(-) 0 0 M(+) Process Water Discharge 0 0 0 0 0 0 0 Cause of lmpact Plant Sewage Discharge 0 0 0 0 0 0 0 Noise Level + = Positive - = Negative * = lnsignificant with proper protection 0 0 0 I(-) 0 M(-I* I(-) Solid Waste Disposal 0 0 0 I(+) I(+) 0 I( +) Hazardous Waste Disposal 0 0 0 0 0 0 0 Electro- Magnetic Frequency 0 0 0 0 0 0 0 I
9.0 MONITORING PLAN In compliance with an agreement between the project ownership group and Regional environmental authorities, the environmental monitoring program for the Krasnodar GRES power plant shall be developed by the Dzerzhinsky research institute in two stages (power plant construction and power plant operation) and this plan shall be approved by the local committee for environmental control and conservation of natural resources. 9.1 Ecological Control During Construction The basic adverse effects during construction will be noise, dust and air pollution by exhaust gases of motor vehicles. The Krasnodar GRES ownership group shall arrange for environmental monitoring of noise, dust and exhaust gases of motor vehicles (CO, CnHrn). For this purpose, a mobile station for environmental monitoring shall be set up at the construction site to measure dust and noise once a month. In addition, CO and hydrocarbon emissions will be measured only for on-site motor vehicles which lack an official exhaust inspection certificate. The primary documents of environmental monitoring (data and official monitoring reports) will be archived and submitted to the appropriate 0 officials of the Ministry of Environmental Protection and Natural Resources (MEPNR) and to the representative of the Public Environmental Control Commission (PECC). The PECC shall be formed by a special decree of the Mostovskoy Region. In addition, one time background monitoring will be conducted prior to construction activities. 9.2. Identification of Basic Ecological Conditions Prior to commencement of construction activities, the following areas shall be evaluated in order to establish up-to-date baseline conditions: Background air pollutant concentrations shall be measured within the probable impact area of the Krasnodar GRES; Water quality parameters shall be measured in the Laba River 0.5 km upstream from the discharge point of the Mostovskoy wastewater treatment plant; Drinking water parameters shall be measured from the potable water intake at Andryuki; PAGE 9-1
- Page 166 and 167: Populated Areas Mostovskoy Pereprav
- Page 168 and 169: 1 2 3 4 5 6 7 8 9 # Table 5.1 2 Est
- Page 170 and 171: In accordance with the district Adm
- Page 172 and 173: during oil transportation. The othe
- Page 174 and 175: are then directed to an oillwater s
- Page 176 and 177: Biological reclamation - bogging an
- Page 178 and 179: - direct impact on vegetation, fore
- Page 180 and 181: 5.2.3.2 Transmission Lines 5.2.3.2.
- Page 182 and 183: 5.2.3.2.2 Impacts on Bird Migration
- Page 184 and 185: Positive lmpacts Additional facilit
- Page 186 and 187: 6.0 WORKER HEALTH AND SAFETY Health
- Page 188 and 189: In the course of practical training
- Page 190 and 191: knowledge of power generator's safe
- Page 192 and 193: @ Urgent instruction is carried out
- Page 194 and 195: - preventive maintenance of the equ
- Page 196 and 197: Governing Standard: "Regulations in
- Page 198 and 199: The Plant Substation; Fenced-off ar
- Page 200 and 201: CONTAMINANT RUSSIA CO NO2 SO2 Parti
- Page 202 and 203: urn agricultural wastes for fuel, t
- Page 204 and 205: production and the large land area
- Page 206 and 207: Interconnection to the existing tra
- Page 208 and 209: 7.6 Alternative Water Supplies and
- Page 210 and 211: 4. "Report No. 256". Krasnodar Terr
- Page 212 and 213: Target of Impact ENVIRONMENTAL Air
- Page 214 and 215: Impacts Water supply shortages due
- Page 218 and 219: Noise levels shall be measured at a
- Page 220 and 221: mobile sources (trucks, loaders, et
- Page 222 and 223: located 0.5 km downstream of the wa
- Page 224 and 225: @ 10.0 ENVIRONMENTAL MANAGEMENT AND
- Page 226 and 227: @ a facility. Maintenance Training
- Page 228: e conducted. In addition, staff wil
- Page 231 and 232: Primary Planning Responsibility Rev
- Page 233 and 234: 11.0 INTERAGENCY COORDINATION AND P
- Page 235 and 236: 2. Burns and Roe indicated that Gen
- Page 237 and 238: Discussion: 1. The Regional Environ
- Page 239 and 240: V.V. Fedorovich, Editor and Publish
- Page 241 and 242: * Molokanov: Question: Anikin: Molo
- Page 243 and 244: Molokanov: We have our man in the a
- Page 245 and 246: nuclear power industry to judge it?
- Page 247 and 248: Lazov: There aint' any gas. The nuc
- Page 249 and 250: 1 1.2.6 Mostovskoy District Represe
- Page 251 and 252: Having reviewed major project techn
- Page 253 and 254: a 1 1.3.2 Attendees 1. B. G. Teresh
- Page 255 and 256: 1 1.3.3 Agenda of Public Hearing Pu
- Page 257 and 258: Answer: Mr 0. Yeschenko. The plant
- Page 259 and 260: @ 11.3.4 Newspaper Coverage of Publ
- Page 261 and 262: Mazut will be used during the start
- Page 263 and 264: June July August Wind rose (summer
- Page 265 and 266: December January February Wind rose
9.0 MONITORING PLAN<br />
In compliance with an agreement between the project ownership group and<br />
Regional environmental authorities, the environmental monitoring program<br />
for the <strong>Krasnodar</strong> <strong>GRES</strong> power plant shall be developed by the Dzerzhinsky<br />
research institute in two stages (power plant construction and power plant<br />
operation) and this plan shall be approved by the local committee for<br />
environmental control and conservation of natural resources.<br />
9.1 Ecological Control During Construction<br />
The basic adverse effects during construction will be noise, dust and air<br />
pollution by exhaust gases of motor vehicles. The <strong>Krasnodar</strong> <strong>GRES</strong><br />
ownership group shall arrange for environmental monitoring of noise, dust<br />
and exhaust gases of motor vehicles (CO, CnHrn). For this purpose, a mobile<br />
station for environmental monitoring shall be set up at the construction site<br />
to measure dust and noise once a month. In addition, CO and hydrocarbon<br />
emissions will be measured only for on-site motor vehicles which lack an<br />
official exhaust inspection certificate.<br />
The primary documents of environmental monitoring (data and official<br />
monitoring reports) will be archived and submitted to the appropriate<br />
0 officials of the Ministry of <strong>Environmental</strong> Protection and Natural Resources<br />
(MEPNR) and to the representative of the Public <strong>Environmental</strong> Control<br />
Commission (PECC). The PECC shall be formed by a special decree of the<br />
Mostovskoy Region. In addition, one time background monitoring will be<br />
conducted prior to construction activities.<br />
9.2. Identification of Basic Ecological Conditions<br />
Prior to commencement of construction activities, the following areas shall<br />
be evaluated in order to establish up-to-date baseline conditions:<br />
Background air pollutant concentrations shall be measured within the<br />
probable impact area of the <strong>Krasnodar</strong> <strong>GRES</strong>;<br />
Water quality parameters shall be measured in the Laba River 0.5 km<br />
upstream from the discharge point of the Mostovskoy wastewater<br />
treatment plant;<br />
Drinking water parameters shall be measured from the potable water<br />
intake at Andryuki;<br />
PAGE 9-1