14.02.2013 Views

Krasnodar GRES Project Volume I11 Environmental Assessment

Krasnodar GRES Project Volume I11 Environmental Assessment

Krasnodar GRES Project Volume I11 Environmental Assessment

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Impacts<br />

Reduced air quality due to emissions<br />

from construction equipment,<br />

trucks, earth moving machinery,<br />

asphalt production, and temporary<br />

boilers, etc.<br />

Increased turbidity in surface waters<br />

due to erosion from site clearing,<br />

earthwork, and road and building<br />

construction.<br />

Pollution of surface waters from<br />

sanitary sewage, construction waste<br />

disposal, and site stormwater runoff.<br />

Pollution of surface waters from fuel<br />

or other hazardous material spills.<br />

Table 8-2<br />

lmpacts and Mitigating Measures<br />

Mitigating Measure<br />

The chosen location of the construction site is<br />

approximately 2 km away from the nearest<br />

populated area which effectively elimi.pates the<br />

impact of reduced air quality on the local<br />

population. All diesel and gasoline powered<br />

equipment used on site will be properly maintained<br />

to ensure efficient operation.<br />

Silt fences and/or hay bales will be erected in the<br />

areas of soil disturbing activities. Vegetation will<br />

be maintained and/or replaced as necessary.<br />

Sanitary sewage will be collected and removed by<br />

tank truck until an onsite treatment plant is<br />

constructed and operating properly. Construction<br />

waste will be disposed according to local<br />

regulations. Site stormwater runoff will be<br />

directed to an onsite stormwater retention pond<br />

intended to reduce siltation and allow for floating<br />

oil to be skimmed.<br />

Fuel storage tanks will have secondary<br />

containment sufficient to hold the volume of the<br />

largest tank plus 10%. Hazardous materials will be<br />

stored in approved structures providing fire<br />

prevention and secondary containment capabilities.<br />

An Emergency Response Plan will be prepared<br />

detailing the procedures to be followed by the<br />

contractors onsite emergency response team to<br />

prevent spilled material from reaching surface<br />

waters. In the event spilled material reaches a<br />

surface water body procedures to minimize the<br />

impact by rapid containment prior to cleanup will<br />

be implimented.<br />

PAGE 8-3<br />

b\$ J

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!