Krasnodar GRES Project Volume I11 Environmental Assessment

Krasnodar GRES Project Volume I11 Environmental Assessment

Krasnodar GRES Project Volume I11 Environmental Assessment

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1.<br />

2<br />

3<br />

Construction<br />

Stage Number<br />

Preparation<br />

Table 5.2<br />

Potential Impacts During Construction<br />

I. Exploration<br />

Construction Activities<br />

Permanent<br />

II. Temporary structures workshops,<br />

access roads, sanitary equipment,<br />

etc.)<br />

Ill. Earthwork, including excavation,<br />

leveling, trenches<br />

IV. Foundation construction, piling,<br />

water flow lowering<br />

I. Temporary site leveling (grass<br />

structures planting)<br />

(including II. Construction of permanent<br />

buildings and structures<br />

warehouses) Ill. Station and engineer network<br />

fitting<br />

Final<br />

I. Removal of temporary structures,<br />

construction leveling and ground preparation<br />

stage completion, etc.<br />

Potential <strong>Environmental</strong> Impact<br />

It is not associated with the<br />

construction stage, since this<br />

was performed at preliminary<br />

stage 1<br />

Pollution by dust, soil<br />

compression, changes in traffic<br />

intensity.<br />

Soil erosion and drainage<br />

Pollution by dust, visual and<br />

noise<br />

Soil erosion improvement<br />

Noise and visual impact<br />

Noise, visual impact and security<br />

Pollution by dust and<br />

construction waste<br />

By the beginning of the construction exploration activities, site preparation and<br />

leveling will have been completed, fertile layer of soil will have been removed and<br />

taken to farms. Drainage of dewatering pits will need to be performed. Foundation<br />

work will include ground excavation, loading, and concrete work, which will cause<br />

noise and dust pollution. During construction a substantial amount of water shall<br />

be required. Water will supplied from existing water intakes using temporary<br />

pumps. Construction and fitting activities will cause noise and dust pollution.<br />

Table 5.3 is representative of the principal types of activities at construction stage<br />

and their environmental impacts.<br />

The primary environmental impacts at the construction stage will be noise, dust<br />

(air pollution), construction waste and sanitary waste. Means of transportation to<br />

deliver materials will cause pollution by dust, air pollution and noise. To mitigate<br />

pollution by dust, watering trucks and dust collectors will be used. <strong>Environmental</strong><br />

impacts by construction activities will be temporary and will not have substantial<br />

residual environmental impact.<br />

PAGE 5-3