through its 100% subsidiary, Kennecott Utah <strong>Copper</strong> Corp. The facilities employ<br />

about 2,400 people.<br />

In early 2005, Rio Tinto committed $170m to the East 1 pushback project,<br />

which will extend the life <strong>of</strong> the open pit at Bingham Cany<strong>on</strong> until 2017. Rio revealed<br />

in 2008 it was studying deepening the 1.2km pit to shore up an extra 2.83 milli<strong>on</strong> t<strong>on</strong>s<br />

<strong>of</strong> copper resources.<br />

Following research from analysts and investors, Rio revealed in 2008 it was<br />

studying deepening the 1.2km pit to shore up an extra 2.83 milli<strong>on</strong> t<strong>on</strong>s <strong>of</strong> copper<br />

resources.<br />

A major molybdenum deposit was discovered in 2008. Additi<strong>on</strong>al porphyry<br />

mineralisati<strong>on</strong> was identified beneath the southern wall <strong>of</strong> the pit. The resources were<br />

studied for extracti<strong>on</strong> by open pit mining methods. However, because <strong>of</strong> the<br />

ec<strong>on</strong>omic downturn, the opti<strong>on</strong> to expand the underground operati<strong>on</strong>s was suspended.<br />

Rio hoped to begin the project in 2009 and produce copper valuing about<br />

$22.67bn at the prevailing prices. A major molybdenum deposit was discovered in<br />

2008. Beneath the southern wall <strong>of</strong> the pit, additi<strong>on</strong>al porphyry mineralisati<strong>on</strong> has<br />

been identified. The resources are being studied for extracti<strong>on</strong> by open pit mining<br />

methods.<br />

In August 2010, Rio announced its Cornerst<strong>on</strong>e project, which is expected to<br />

extend the life <strong>of</strong> the mine to 2034. Rio is seeking permissi<strong>on</strong> from the regulators to<br />

push the south wall back by approximately 1,000ft and deepen the mine by another<br />

300ft in order to reach more than 700Mt <strong>of</strong> copper ore.<br />

Rio would need to generate or source 100MW <strong>of</strong> electricity to power the<br />

Cornerst<strong>on</strong>e expansi<strong>on</strong> project. It will also require obtaining 25 <strong>of</strong> the 70 primary<br />

envir<strong>on</strong>mental permits relating to air, water and land.<br />

Geology and Reserves<br />

The classic copper porphyry orebody is not <strong>on</strong>ly huge but also enjoys a fairly<br />

uniform distributi<strong>on</strong> <strong>of</strong> sulphide mineralisati<strong>on</strong>, mainly chalcopyrite. The existing pit<br />

will be worked out by 2013, but open pit and then underground mining will c<strong>on</strong>tinue<br />

after that. As <strong>of</strong> end-2009, proven and probable open-pit reserves totalled 524Mt<br />

grading 0.47% copper, 0.044% molybdenum, 0.25g/t gold and 2.08g/t silver. Total<br />

mineral resources were 647Mt at 0.477% copper, 0.18g/t gold, 0.034% molybdenum<br />

and 2.1g/t silver.<br />

Mining<br />

The Bingham Cany<strong>on</strong> pit is now 2.5 miles wide and very deep. Mining uses a<br />

rotary drilling/blasting – shovel/truck – in-pit crushing system, with two to four blasts<br />

per day. To c<strong>on</strong>tain costs, management has been quick to utilise the most costeffective<br />

drilling, loading and haulage equipment and management tools available.<br />

187<br />

C<strong>on</strong>td…..