13.02.2013 Views

Market Survey on Copper - Indian Bureau of Mines

Market Survey on Copper - Indian Bureau of Mines

Market Survey on Copper - Indian Bureau of Mines

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Details <strong>of</strong> Important <strong>Copper</strong> <strong>Mines</strong> in the World<br />

Annexure: 4 – XIX<br />

1. Esc<strong>on</strong>dida <strong>Copper</strong> Mine, Chile<br />

The Esc<strong>on</strong>dida copper-gold-silver mine is located in the arid, northern Atacama<br />

Desert <strong>of</strong> Chile about 160km southeast the port <strong>of</strong> Ant<strong>of</strong>agasta, at an elevati<strong>on</strong> <strong>of</strong><br />

3,050m above sea level. The mine is a joint venture between BHP-Billit<strong>on</strong> (57.5%),<br />

Rio Tinto (30%), a Japanese c<strong>on</strong>sortium (10%) and the Internati<strong>on</strong>al Finance<br />

Corporati<strong>on</strong> (2.5%). It came <strong>on</strong>-stream in late 1990 and its capacity has since been<br />

increased by phased expansi<strong>on</strong>s to the current level <strong>of</strong> 230,000t/d ore throughput. The<br />

mine employs around 2,200 people.<br />

Producti<strong>on</strong> at the mine was cut back during the period 2003 <strong>on</strong> account <strong>of</strong> the<br />

weak world market c<strong>on</strong>diti<strong>on</strong>s for copper. The partners in the project decided to mine<br />

lower-grade ores while maintaining the c<strong>on</strong>centrator throughput, thus reducing the<br />

impact <strong>on</strong> per-t<strong>on</strong>-treated costs. Output was subsequently ramped up again, and<br />

during 2004 the mine handled 377Mt <strong>of</strong> ore and waste, and processed 82.4Mt <strong>of</strong><br />

sulphide ore grading 1.51% copper (up from 70.3Mt at 1.43% copper in 2003).<br />

During the year ending June 2006, the mine handled 368.3Mt <strong>of</strong> ore and waste<br />

and processed 87.7Mt <strong>of</strong> sulphide ore grading 1.61% copper. Total mill output was<br />

1,207,100 t<strong>on</strong>s. Payable copper producti<strong>on</strong> was 1.17Mt <strong>of</strong> copper, electrow<strong>on</strong> copper<br />

cathode output was 116,300 t<strong>on</strong>s, payable gold in c<strong>on</strong>centrate was 139,000oz and<br />

payable silver in c<strong>on</strong>centrate was 5.9Moz.<br />

In 2007, the copper mine boosted output by 18.2% after producing 1.245<br />

milli<strong>on</strong> t<strong>on</strong>s <strong>of</strong> copper c<strong>on</strong>tained in c<strong>on</strong>crete and 238,357 t<strong>on</strong>nes in cathodes.<br />

However, during the first nine m<strong>on</strong>ths <strong>of</strong> 2008, Esc<strong>on</strong>dida experienced a 10.4%<br />

producti<strong>on</strong> rate compared to the same period a year ago.<br />

Geology and reserves<br />

Esc<strong>on</strong>dida is related geologically to three porphyry bodies intruded al<strong>on</strong>g the<br />

major Chilean west fissure fault system. Primary hydrothermal sulphide ore grades at<br />

between 0.2% and 1% copper. Subsequent weathering and uplifting created a barren,<br />

leached cap, up to 180m thick, over a high grade supergene enriched ore, both<br />

overlying the primary sulphides. Primary sulphide mineralisati<strong>on</strong> includes pyrite,<br />

chalocopyrite and bornite, with covellite and chalcocite in the enriched z<strong>on</strong>e.<br />

The combined proven and probable ore reserves <strong>of</strong> Esc<strong>on</strong>dida and Esc<strong>on</strong>dida<br />

Norte as at mid-2004 were: 2,018Mt <strong>of</strong> copper sulphide ore at 1.24% total copper;<br />

1,701Mt <strong>of</strong> low-grade copper sulphide ore at 0.55% total copper; and 290Mt <strong>of</strong><br />

copper oxide ore at 0.73% acid-soluble copper.<br />

Esc<strong>on</strong>dida’s proved and probable reserves are currently 3,900Mt, including the<br />

additi<strong>on</strong> <strong>of</strong> 1,200Mt from the Esc<strong>on</strong>dida Norte project. Current mine operati<strong>on</strong>s are<br />

projected for 34 years.<br />

C<strong>on</strong>td…..<br />

171

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!