13.02.2013 Views

PPT CORPORATIVA aqualia - H2O Middle East

PPT CORPORATIVA aqualia - H2O Middle East

PPT CORPORATIVA aqualia - H2O Middle East

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MANAGEMENT OF PUBLIC<br />

WATER SERVICES<br />

INFRASTRUCTURES<br />

INDUSTRIAL<br />

A global view based on a<br />

solid local commitment


MANAGEMENT OF PUBLIC<br />

WATER SERVICES<br />

INFRASTRUCTURES<br />

INDUSTRIAL<br />

IRRIGATION<br />

Infrastructures<br />

Construction<br />

Concessions<br />

Cement<br />

<strong>aqualia</strong><br />

Versia<br />

Main Figures 2008<br />

Sales € 14,016 MM<br />

Net Profit € 337 MM<br />

Operating Cash Flow € 1,105 MM<br />

Staff 93,510<br />

Backlog € 32,706 MM<br />

2<br />

Grupo FCC<br />

BUSINESS PROFILE<br />

Services<br />

ámbito<br />

Environmental<br />

International Sales<br />

52 % National<br />

Power Real Estate<br />

Wind / Solar Realia Picasso Tower<br />

International<br />

48 %<br />

United Kingdom<br />

Rest of Europe<br />

7 %<br />

14 %<br />

USA 6 %<br />

Other Markets 6 %<br />

Central and <strong>East</strong>ern Europe<br />

67 %


MANAGEMENT OF PUBLIC<br />

WATER SERVICES<br />

INFRASTRUCTURES<br />

INDUSTRIAL<br />

<strong>aqualia</strong>, gestión integral del agua S.A.<br />

3<br />

The only operator in Spain<br />

capable of providing solutions<br />

for all requirements<br />

arising from water uses


MANAGEMENT OF PUBLIC<br />

WATER SERVICES<br />

INFRASTRUCTURES<br />

INDUSTRIAL<br />

<strong>aqualia</strong>. Main Financial Data<br />

2005 2006 2007 2008<br />

Turnover € 568.4 MM € 714.4 MM € 790.1 MM € 845.5 MM<br />

Ebitda € 99 MM € 124.2 MM € 152 MM € 156.6 MM<br />

Profit € 47 MM € 63.7 MM € 64.2 MM € 61 MM<br />

Backlog € 6,706.3 MM € 10,611.2 MM € 10,969.8 MM € 11,911.9 MM<br />

12.000<br />

10.000<br />

8.000<br />

6.000<br />

4.000<br />

2.000<br />

0<br />

2.287 2.208<br />

3.756<br />

4.034<br />

4.408<br />

4.779<br />

4<br />

4.871<br />

Backlog Trend<br />

5.151<br />

6.706<br />

10.611<br />

10.969<br />

1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008<br />

11.911<br />

36% of Grupo<br />

FCC (*)<br />

(*)32,706 mm,<br />

December ‘08


MANAGEMENT OF PUBLIC<br />

WATER SERVICES<br />

INFRASTRUCTURES<br />

INDUSTRIAL<br />

1000<br />

800<br />

600<br />

400<br />

200<br />

0<br />

569<br />

0<br />

674<br />

40<br />

715<br />

74<br />

5<br />

712<br />

134<br />

2005 2006 2007 2008<br />

<strong>aqualia</strong>. International expansion<br />

Turnover<br />

(MM Euros)<br />

6,706<br />

Spain International<br />

0<br />

7,846<br />

2,765<br />

Backlog<br />

(MM Euros)<br />

8,326<br />

2,320<br />

8,405<br />

3,506<br />

1 2 3 4


MANAGEMENT OF PUBLIC<br />

WATER SERVICES<br />

INFRASTRUCTURES<br />

INDUSTRIAL<br />

<strong>aqualia</strong> is a leading company in water<br />

management in the world. Third largest<br />

population supplied by private company<br />

1 st Spanish Company in its sector as it has<br />

the 36% of privatized market share<br />

One of the very few capable of providing<br />

solutions for every need of water cycle<br />

organizations in public and private sectors<br />

9,300 highly qualified employees<br />

Expanding worldwide<br />

<strong>aqualia</strong>. Key Strengths<br />

6<br />

27,300,000 population<br />

supplied (Data by GWI). 3 rd<br />

largest amount in the world.<br />

> Serving over 1,100<br />

municipalities<br />

Offering economically viable<br />

solutions and well accepted<br />

socially<br />

Qualified staff in water<br />

management with the latest<br />

technology in its sector<br />

Maintaining presence in 20<br />

countries


MANAGEMENT OF PUBLIC<br />

WATER SERVICES<br />

INFRASTRUCTURES<br />

INDUSTRIAL<br />

<strong>aqualia</strong>. International Awards<br />

• Water Company of the Year 2007<br />

Award by the prestigious magazine<br />

Global Water Intelligence (GWI) for “a<br />

winning combination of<br />

ambition and excellence”.<br />

• Water Deal of the Year 2010<br />

Award by Global Water Intelligence (GWI)<br />

to the New Cairo Wastewater Treatment Plant Financial Closing.<br />

• Customer Service Leadership of the Year<br />

Award by Frost & Sullivan<br />

to management based on Customer Care Excellence.<br />

• Best of European Business<br />

Award by Roland Berger for the fast worldwide international<br />

expansion.<br />

7


MANAGEMENT OF PUBLIC<br />

WATER SERVICES<br />

INFRASTRUCTURES<br />

INDUSTRIAL<br />

<strong>aqualia</strong>. Global Presence<br />

8<br />

Technical and commercial Office<br />

Water management<br />

Construction of water processing facilities<br />

Concessions<br />

<strong>aqualia</strong> industrial<br />

Irrigation<br />

Local Office


MANAGEMENT OF PUBLIC<br />

WATER SERVICES<br />

INFRASTRUCTURES<br />

INDUSTRIAL<br />

Saudi Arabia<br />

<strong>Middle</strong> <strong>East</strong><br />

Qatar<br />

(Planned)<br />

<strong>aqualia</strong>. Presence in the <strong>Middle</strong> <strong>East</strong><br />

UAE<br />

Abu Dhabi<br />

Branch<br />

9


MANAGEMENT OF PUBLIC<br />

WATER SERVICES<br />

INFRASTRUCTURES<br />

INDUSTRIAL<br />

Customers<br />

Main actions of project :<br />

• Customer care offices<br />

• Call-Centers<br />

• Virtual office (Portal web)<br />

• Information campaigns<br />

• Personal Marketing<br />

• Media relations<br />

• Local communication plans<br />

• Social Marketing<br />

• Selective sponsorships<br />

• Institutional and local WEB<br />

• Events / Press Conferences<br />

Customer Focus<br />

Company´s<br />

strategic<br />

headquarters.<br />

10<br />

� Offering best service.<br />

� Attaining excellence in<br />

customer care worldwide.<br />

Awards ceremony of <strong>aqualia</strong>´s Drawing Contest Direct Marketing<br />

Virtual Office (Portal web)<br />

Customer care office


MANAGEMENT OF PUBLIC<br />

WATER SERVICES<br />

INFRASTRUCTURES<br />

INDUSTRIAL<br />

Partnerships with International Investment Institutions<br />

Establishment of Aqualia New Europe<br />

11


MANAGEMENT OF PUBLIC<br />

WATER SERVICES<br />

INFRASTRUCTURES<br />

INDUSTRIAL<br />

Partnerships with International Investment Institutions<br />

Establishment of Aqualia New Europe<br />

12


MANAGEMENT OF PUBLIC<br />

WATER SERVICES<br />

INFRASTRUCTURES<br />

INDUSTRIAL<br />

Partnerships with International Investment Institutions<br />

Establishment of Aqualia New Europe<br />

The EBRD (European Bank for Reconstruction and Development) is an international<br />

public-private financial institution that supports projects in 30 countries from central<br />

Europe to central Asia. It is owned by the European Community, the European Investment<br />

Bank and other private and public institutions.<br />

www.ebrd.com<br />

Investing primarily in private sector clients whose needs cannot be fully met by the<br />

market, the Bank promotes entrepreneurship and fosters transition towards open and<br />

democratic market economies..<br />

Through Aqualia New Europe, the EBRD is investing up to €80 million equity to help raise<br />

the quality of water supply and waste water operations across eastern Europe.<br />

Aqualia is the majority shareholder, with a 51% stake in Aqualia New Europe, while the<br />

EBRD holds a 49% stake. The total capital of the company is 163 million euro.<br />

The target of Aqualia New Europe is water management, public-private financed projects<br />

and acquisitions of strategic water assets in Central-<strong>East</strong>ern Europe.<br />

13


MANAGEMENT OF PUBLIC<br />

WATER SERVICES<br />

INFRASTRUCTURES<br />

INDUSTRIAL<br />

Main References in Water Management<br />

14


MANAGEMENT OF PUBLIC<br />

WATER SERVICES<br />

INFRASTRUCTURES<br />

INDUSTRIAL<br />

> 13,900,000<br />

> 13,300,000<br />

192<br />

243<br />

>1,100<br />

696,635,000 m3<br />

60<br />

702,200<br />

92,200<br />

> 60<br />

> 59,000,000 €<br />

> 488,000,000 m3<br />

10.4%<br />

Water Management<br />

Relevant Figures<br />

Inhabitants served in Spain<br />

Inhabitants served outside Spain<br />

D.W.T.P. Facilities in operation<br />

W.W.T.P. Facilities in operation<br />

Served municipalities.<br />

Drinking water distributed per year<br />

Parameters used on analysis<br />

Drinking water assesments per year<br />

Sewage water assesments per year<br />

Participated companies<br />

Invested in network renovation/upgrading per year<br />

Treated per year<br />

Mean energy consumption reduction in integral cycle<br />

activities once fully established<br />

15


MANAGEMENT OF PUBLIC<br />

WATER SERVICES<br />

INFRASTRUCTURES<br />

INDUSTRIAL<br />

References in the Management of Public Water Utilities<br />

Municipalty/ Region<br />

Campo Maior y<br />

Abrantes<br />

Caltanissetta Sicily<br />

Moravia - Silesia<br />

Catamarca<br />

México D.C.<br />

Aguas<br />

calientes<br />

Western Area<br />

North Area<br />

Central Area<br />

South Area<br />

<strong>East</strong>ern Area<br />

Country<br />

Portugal<br />

Italy<br />

Czech Rep.<br />

Argentina<br />

Mexico<br />

Mexico<br />

Spain<br />

Spain<br />

Spain<br />

Spain<br />

Spain<br />

Project<br />

Supply and water management<br />

Integrated water cycle management<br />

Integrated water cycle management<br />

Integrated water cycle management<br />

Commercial Integrated water cycle management<br />

Supply and water management<br />

Integrated water cycle management<br />

Integrated water cycle management<br />

Integrated water cycle management<br />

Integrated water cycle management<br />

Integrated water cycle management<br />

16<br />

Served population<br />

(inhab.)<br />

51,000<br />

275,000<br />

1,200,000<br />

200,000 (*)<br />

2,300,000 (*)<br />

750,000 (*)<br />

530,000<br />

3,800,000<br />

4,850,000<br />

2,400,000<br />

1,350,000<br />

Link to list of contracts Link to list of Main BOT contracts<br />

(*) Proactiva de Medio Ambiente


MANAGEMENT OF PUBLIC<br />

WATER SERVICES<br />

INFRASTRUCTURES<br />

INDUSTRIAL<br />

17<br />

Caltanissetta Province (Sicily, Italy)<br />

Integral Cycle Water Management.<br />

Population Supplied: 275,086 people


MANAGEMENT OF PUBLIC<br />

WATER SERVICES<br />

INFRASTRUCTURES<br />

INDUSTRIAL<br />

18<br />

Ostrava region (Czech Republic)<br />

Integral Cycle Water Management.<br />

Population Supplied: 1,200,000 people


MANAGEMENT OF PUBLIC<br />

WATER SERVICES<br />

INFRASTRUCTURES<br />

INDUSTRIAL<br />

19<br />

Riyadh City (Saudi Arabia)<br />

Water Network Leakage Management


MANAGEMENT OFPUBLIC<br />

WATER SERVICES<br />

Main References in BOT Projects<br />

20


MANAGEMENT OFPUBLIC<br />

WATER SERVICES<br />

Average flow: 200,000 m³/d<br />

COD 2010<br />

21<br />

Mostaganem SWRO Desalination Plant<br />

(Mostaganem, Algeria)


MANAGEMENT OFPUBLIC<br />

WATER SERVICES<br />

Average flow: 100,000 m³/d<br />

COD 2011<br />

22<br />

Cap Djinet SWRO Desalination Plant<br />

(Cap Djinet, Algeria)


MANAGEMENT OFPUBLIC<br />

WATER SERVICES<br />

Delta del Tordera SWRO Desalination Plant<br />

(Catalonia, Spain)<br />

23<br />

COD July 2003 Phase I<br />

COD Dec. 2009 Phase II<br />

Extension: + 30,000 m³/d


MANAGEMENT OFPUBLIC<br />

WATER SERVICES<br />

Total investment: $ 62.6 m<br />

Average flow: 15,000 m³/d<br />

24<br />

Santa Eulalia SWRO Desalination Plant<br />

(Ibiza, Spain)


MANAGEMENT OFPUBLIC<br />

WATER SERVICES<br />

25<br />

Almuñécar SWRO Desalination Plant<br />

(Granada, Spain)<br />

Total investment: $ 29.2 m<br />

Average flow: 16,000 m³/d<br />

COD May 2011


MANAGEMENT OFPUBLIC<br />

WATER SERVICES<br />

Ranilla STP (Seville, Spain)<br />

Average flow: 90,000 m3/d Investment $ 102 m<br />

26


MANAGEMENT OFPUBLIC<br />

WATER SERVICES<br />

Ranilla STP (Seville, Spain)<br />

Average flow: 90,000 m3/d Investment $ 102 m<br />

27


MANAGEMENT OFPUBLIC<br />

WATER SERVICES<br />

References in Design and Construction<br />

28


References in Desalination<br />

MANAGEMENT OFPUBLIC<br />

WATER SERVICES<br />

SWRO Santa Eulalia, Ibiza- SPAIN<br />

29


References in Desalination-Reverse Osmosis<br />

MANAGEMENT OFPUBLIC<br />

WATER SERVICES<br />

COUNTRY TITLE OF PROJECT<br />

30<br />

VOLUME<br />

(m 3 /d)<br />

ALGERIA SWRO Mostaganem 200.000<br />

ALGERIA SWRO Cap D’Jinet 100.000<br />

SPAIN SWRO Bajo Almanzora- Almería 60.000<br />

SPAIN SWRO Delta de la Tordera- Gerona 60.000<br />

SPAIN BWRO Campo de Calatrava 25.590<br />

SPAIN SWRO Almuñecar- Granada 24.000<br />

SPAIN SWRO Adeje Arona- Tenerife 20.000<br />

SPAIN SWRO San Antonio- Ibiza 17.500<br />

SPAIN SWRO Santa Eulalia- Ibiza 15.000<br />

SPAIN BWRO Racons Denia- Alicante 5.400<br />

SPAIN SWRO Roque Prieto- Gran Canaria 5.000<br />

SPAIN BWRO Sa Pobla- Mallorca 3.000<br />

SPAIN SWRO Fuerteventura III 4.000<br />

SPAIN SWRO Corralejo- Fuerteventura 1.500<br />

SPAIN SWRO Gran Tarajal- Fuerteventura 1.500<br />

CHILE<br />

SPAIN<br />

RO Boiler Water Treatment<br />

PETROPOWER<br />

RO Process Water Treatment<br />

ENDESA CCPP - Tarragona<br />

2.640<br />

16.800


References in Sewage Treatment and<br />

Reuse<br />

MANAGEMENT OFPUBLIC<br />

WATER SERVICES<br />

WWTP Baix Llobregat 420,000 m3/d<br />

(Barcelona)<br />

31


References in Sewage Treatment and Reuse (I)<br />

Projects Country<br />

MANAGEMENT OFPUBLIC<br />

WATER SERVICES<br />

Capacity<br />

(m 3 Projects<br />

Capacity<br />

Country Investment (€)<br />

/d) (LPS)<br />

Finalization Contract<br />

P Baix Llobregat - Sludge Treatment Spain 420.000 4.861 58.721.591'15 30/6/2004 DB<br />

P Loiola-San Sebastián Spain 388.800 4.500 36.741.247'07 27/7/2005 DB<br />

P La Golondrina - Extention Spain 148.608 1.720 5.794.771'60 Under Construction DB<br />

P Rejas Extention Spain 146.448 1.695 6.178.852'15 1/1/2000 DB<br />

P Arroyo del Culebro<br />

P Salamanca<br />

Spain<br />

Spain<br />

129.600<br />

117.504<br />

1.500<br />

1.360<br />

51.932.213'58<br />

35.157.628'89<br />

1/9/2006<br />

8/4/2003<br />

DBO<br />

DBO<br />

P San Pantaleón Spain 113.600 1.315 25.500.138'48 Under Construction DB<br />

P Vuelta Ostrera.T.M. Suances Spain<br />

P Bengbu-Anhui (China)<br />

109.382 1.266 24.899.417'93 26/6/2004 DB<br />

omechanical Equipments Delivery China 100.000 1.157 3.306.495'71 1/11/2003 DB<br />

P La Ranilla Spain 90.000 1.042 41.462.509'88 Under Construction DBO<br />

- Extention WWTP and Nutrients Removal Spain 87.500 1.013 6.688.150'52 Under Construction B<br />

P Alicante - Rincón del León Spain 75.000 868 27.067.756'74 1/11/2000 B<br />

P Tarrassa Spain 75.000 868 9.312.110'25 1/3/1999 DBO<br />

P Tarrasa - Extention Spain 75.000 868 29.957.659'30 Under Construction DB<br />

P Sant Feliu de Llobregat - 2ª fase Spain 72.000 833 9.227.184'38 1/3/1995 DB<br />

DB<br />

P Quart-Benager Spain 60.000 694 1.984.620'80 1/3/1998 (Subcontractor)<br />

P Mataró Spain 57.000 660 8.731.528'80 1/4/1997 DBO<br />

P Gerona - Extention Spain 55.000 637 12.667.750'90 Under Construction DB<br />

P Tarragona - Anaerobic Digestion Spain 52.500 608 2.508.372'40 1/2/2003 DB<br />

P Mar-Menor Sur Spain 50.000 579 28.731.827'72 1/3/2000 DBO<br />

DB<br />

P Talavera Spain 49.315 571 9.294.999'00 Under Construction (Subcontractor)<br />

Capacity<br />

(m 3 Capacity<br />

/d) (LPS)<br />

Investment (€) Finalization Contract<br />

WWTP Baix Llobregat - Sludge Treatment Spain 420.000 4.861 58.721.591'15 30/6/2004 DB<br />

WWTP Loiola-San Sebastián Spain 388.800 4.500 36.741.247'07 27/7/2005 DB<br />

WWTP La Golondrina - Extention Spain 148.608 1.720 5.794.771'60 Under Construction DB<br />

WWTP Rejas Extention Spain 146.448 1.695 6.178.852'15 1/1/2000 DB<br />

WWTP Arroyo del Culebro<br />

WWTP Salamanca<br />

Spain<br />

Spain<br />

129.600 1.500<br />

117.504 1.360<br />

51.932.213'58<br />

35.157.628'89<br />

1/9/2006<br />

8/4/2003<br />

DBO<br />

DBO<br />

WWTP San Pantaleón Spain 113.600 1.315 25.500.138'48 Under Construction DB<br />

WWTP Vuelta Ostrera.T.M. Suances<br />

WWTP Bengbu-Anhui (China)<br />

Spain 109.382 1.266 24.899.417'93 26/6/2004 DB<br />

Electromechanical Equipments Delivery China 100.000 1.157 3.306.495'71 1/11/2003 DB<br />

WWTP La Ranilla Spain 90.000 1.042 41.462.509'88 Under Construction DBO<br />

Lleida - Extention WWTP and Nutrients Removal Spain 87.500 1.013 6.688.150'52 Under Construction B<br />

WWTP Alicante - Rincón del León Spain 75.000 868 27.067.756'74 1/11/2000 B<br />

WWTP Tarrassa Spain 75.000 868 9.312.110'25 1/3/1999 DBO<br />

WWTP Tarrasa - Extention Spain 75.000 868 29.957.659'30 Under Construction DB<br />

WWTP Sant Feliu de Llobregat - 2ª fase Spain 72.000 833 9.227.184'38 1/3/1995 DB<br />

DB<br />

WWTP Quart-Benager Spain 60.000 694 1.984.620'80 1/3/1998 (Subcontractor)<br />

WWTP Mataró Spain 57.000 660 8.731.528'80 1/4/1997 DBO<br />

WWTP Gerona - Extention Spain 55.000 637 12.667.750'90 Under Construction DB<br />

WWTP Tarragona - Anaerobic Digestion Spain 52.500 608 2.508.372'40 1/2/2003 DB<br />

WWTP Mar-Menor Sur Spain 50.000 579 28.731.827'72 1/3/2000 DBO<br />

DB<br />

WWTP Talavera Spain 49.315 571 9.294.999'00 Under Construction (Subcontractor)<br />

32


References in Sewage Treatment and Reuse (II)<br />

Projects Country<br />

MANAGEMENT OFPUBLIC<br />

WATER SERVICES<br />

Capacity<br />

(m 3 Projects<br />

Capacity<br />

Country Investment (€)<br />

/d) (LPS)<br />

Finalization Contract<br />

B<br />

TP Norte Aveiro Portugal 48.700 564 4.182.458'79 1/8/2003 (Subcontractor)<br />

DB<br />

TP Utebo<br />

TP Vilaseca-Salou<br />

Spain<br />

Spain<br />

40.000<br />

35.000<br />

463<br />

405<br />

30.223.712'74<br />

8.862.795'88<br />

Under Construction<br />

1/5/1995<br />

(Subcontractor)<br />

DBO<br />

DB<br />

TP Jaen Spain 34.000 394 11.344.733'90 1/4/1998 (Subcontractor)<br />

TP Paterna Spain 32.000 370 27.517.417'05 1/9/2005 DBO<br />

B<br />

reening and Pumping Station Martín Peña (Puerto Puerto Rico) Rico 32.000 370 4.146.984'00 1/5/2003 (Subcontractor)<br />

DB<br />

TP Matosinhos - Equipments Delivery Portugal 30.000 347 1.035.345'52 1/9/1998 (Subcontractor)<br />

TP Sabadell-Río Ripoll Spain 30.000 347 16.384.278'00 1/4/2001 DBO<br />

TP Canet d'en Berenguer y L'Alnardá de SaguntoSpain 24.000 278 7.536.580'70 Under Construction DBO<br />

TP Abrera - Extention Biological Reactor Spain 23.000 266 2.626.706'32 1/10/1999 DBO<br />

TP Teia-Maresme Sud Spain 22.500 260 5.505.316'79 28/2/1997 DBO<br />

TP Burriana Spain 20.250 234 4.184.536'37 1/7/2001 DB<br />

DB<br />

TP Toledo - WWTP Polígono de Benquerencia Spain 20.000 231 8.167.214'33 1/4/1995 (Subcontractor)<br />

DB<br />

TP Velilla de San Antonio Spain 20.000 231 8.113.663'41 1/10/1997 (Subcontractor)<br />

TP La Golondrina - Redesign Sludge Treatment Spain 20.000 231 716.025'08 1/6/1999 DB<br />

TP Boadilla del Monte Spain 20.000 231 13.507.693'08 1/12/2002 DB<br />

TP Golondrina - Flotation Thickener Spain 20.000 231 258.000'24 1/12/2005 B<br />

TP Golondrina - Extention. Areation Biological Reactor. Spain 20.000 231 1.617.527'19 1/12/2005 B<br />

Capacity<br />

(m 3 Capacity<br />

/d) (LPS)<br />

Investment (€) Finalization Contract<br />

B<br />

WWTP Norte Aveiro Portugal 48.700 564 4.182.458'79 1/8/2003 (Subcontractor)<br />

DB<br />

WWTP Utebo<br />

WWTP Vilaseca-Salou<br />

Spain<br />

Spain<br />

40.000 463<br />

35.000 405<br />

30.223.712'74<br />

8.862.795'88<br />

Under Construction<br />

1/5/1995<br />

(Subcontractor)<br />

DBO<br />

DB<br />

WWTP Jaen Spain 34.000 394 11.344.733'90 1/4/1998 (Subcontractor)<br />

WWTP Paterna Spain 32.000 370 27.517.417'05 1/9/2005 DBO<br />

B<br />

Screening and Pumping Station Martín Peña (Puerto Puerto Rico) Rico 32.000 370 4.146.984'00 1/5/2003 (Subcontractor)<br />

DB<br />

WWTP Matosinhos - Equipments Delivery Portugal 30.000 347 1.035.345'52 1/9/1998 (Subcontractor)<br />

WWTP Sabadell-Río Ripoll Spain 30.000 347 16.384.278'00 1/4/2001 DBO<br />

WWTP Canet d'en Berenguer y L'Alnardá de SaguntoSpain 24.000 278 7.536.580'70 Under Construction DBO<br />

WWTP Abrera - Extention Biological Reactor Spain 23.000 266 2.626.706'32 1/10/1999 DBO<br />

WWTP Teia-Maresme Sud Spain 22.500 260 5.505.316'79 28/2/1997 DBO<br />

WWTP Burriana Spain 20.250 234 4.184.536'37 1/7/2001 DB<br />

DB<br />

WWTP Toledo - WWTP Polígono de Benquerencia Spain 20.000 231 8.167.214'33 1/4/1995 (Subcontractor)<br />

DB<br />

WWTP Velilla de San Antonio Spain 20.000 231 8.113.663'41 1/10/1997 (Subcontractor)<br />

WWTP La Golondrina - Redesign Sludge Treatment Spain 20.000 231 716.025'08 1/6/1999 DB<br />

WWTP Boadilla del Monte Spain 20.000 231 13.507.693'08 1/12/2002 DB<br />

WWTP Golondrina - Flotation Thickener Spain 20.000 231 258.000'24 1/12/2005 B<br />

WWTP Golondrina - Extention. Areation Biological Reactor. Spain 20.000 231 1.617.527'19 1/12/2005 B<br />

33


MANAGEMENT OFPUBLIC<br />

WATER SERVICES<br />

References in TSE Polishing Plants<br />

Irrigation of Leisure Areas (Potential human contact)<br />

Projects Country Capacity<br />

(m 3 /d)<br />

Capacity<br />

(Lps)<br />

Finalization Contract<br />

WWTP del Baix Llobregat - Tertiary Treatment Spain 345.600 4.000 1/12/2006 DB<br />

Tertiary Treatment la China-2ª fase - Reuse Water Treatment Spain 108.000 1.250 1/3/2004 B<br />

WWTP de Quart de Benager - Tertiary Treatment Extention Spain 60.000 694 Under Construction DB<br />

WWTP Alicantí Sur - Tertiary Treatment Spain 30.000 347 Under Construction DB<br />

DB<br />

Tertiary Treatment WWTP La China Spain 25.920 300 1/6/1999<br />

Tertiary Treatment Vilaseca - Salou Spain 17.280 200 1/5/1997 DB<br />

B<br />

WWTP Alcobendas - Extention Reuse Water Treatment Facility Spain 16.372 189 22/1/2007<br />

Tertiary Treatment WWTP Orihuela-Molins Spain 12.960 150 1/6/1997 DBO<br />

WWTP Alcobendas - Irrigation Spain 10.886 126 1/11/1999 DB<br />

Reuse Water Treatment Proyect. Isla Lanzarote<br />

3 WWTP and 3 Tertiary Treatment Spain 9.900 115 31/12/2002 DB<br />

Bahía de Alcudia - Tertiary Treatment Spain 8.500 98 Under Construction<br />

DB<br />

Tertiary Treatment and WWTP Cala d'Or en Mallorca Spain 4.320 50 1/11/2000<br />

34


MANAGEMENT OFPUBLIC<br />

WATER SERVICES<br />

References in TSE Polishing Plants.<br />

“Human consumption” quality standard<br />

PROJECT PROCESS<br />

35<br />

VOLUME<br />

(m 3 /d)<br />

TSEPP ARRECIFE MICROFILTRATION + RO + DISINFECTION 9,000 2004<br />

TSEPP HARIA MBR ULTRAFILTRATION + RO + DISINFECTION 400 2004<br />

REFURBISHMENT<br />

DWTP DENIA<br />

TSEPP RANILLA<br />

ENHANCED SETTLING + OZONE +<br />

MICROFILTRATION + RO + DISINFECTION<br />

CONT. ENHANCED SAND FILTRATION +<br />

MICROFILTRATION + RO + DISINFECTION<br />

TSEPP ALICANTI SUR ULTRAFILTRATION + RO + DISINFECTION 15,000<br />

21,600 2005<br />

2,000 2009<br />

YEAR OF<br />

COMPLETION<br />

UNDER<br />

CONSTRUCTION


References in Sewage Treatment using MBR process<br />

MANAGEMENT OFPUBLIC COUNTRY TITLE OF PROJECT<br />

WATER SERVICES<br />

SPAIN<br />

SPAIN<br />

SPAIN<br />

SPAIN<br />

SPAIN<br />

WWTP HARIA- Lanzarote<br />

MBR with ZENON membranes & Reverse Osmosis<br />

PILOT PLANT AT WWTP VALDEBEBAS- Madrid<br />

R&D&I Project Investigation- KUBOTA membranes<br />

WWTP ILLESCAS – Toledo<br />

MBR with KUBOTA membranes<br />

WWTP TARRASA – Barcelona<br />

MBR with ZENON membranes<br />

WWTP ONTIGOLA – Toledo<br />

MBR with PURON-KOCH membranes<br />

36<br />

VOLUME<br />

(m 3 /d)<br />

YEAR OF COMPLETION<br />

400 2002<br />

12 2005 to 2007<br />

1.250 2006<br />

15.000 UNDER CONSTRUCTION<br />

1.200 UNDER CONSTRUCTION


References in Large Pumping Systems (I)<br />

QUERETARO AQUEDUCT + DWTP,<br />

MEXICO.<br />

3 large pumping stations<br />

TOTAL FLOW: 6,75 m3 /s at max. 580 m<br />

MANAGEMENT OFPUBLIC<br />

WATER SERVICES<br />

LOYOLA WWTP, SPAIN.<br />

3 large sewage pumping stations<br />

TOTAL FLOW: 4,27 m 3 /s at max. 23 m<br />

BUTARQUE STORM TANK + PUMPING,<br />

SPAIN.<br />

2 large sewage pumping stations<br />

TOTAL FLOW: 26,83 m 3 /s at max. 21,6 m<br />

•INTAKE WORKS:<br />

Vertical centrifuge pumps<br />

•1 st Pumping Station: Horizontal centrifuge<br />

pumps<br />

•2 nd Pumping Station: Horizontal centrifuge<br />

pumps<br />

•INLET MAIN PUMPING STATION I (San<br />

Sebastián): HC al centrifugal pumps<br />

•INLET MAIN PUMPING STATION II (Pasajes):<br />

horizontal centrifugal pumps<br />

•INLET MAIN PUMPING STATION III (Urumea):<br />

horizontal centrifugal pumps<br />

•TO NEW PRIMARY TREATMENT WWTP<br />

BUTARQUE: horizontal centrifugal pumps<br />

•TO “MARGEN DERECHA” COLLECTOR:<br />

horizontal centrifugal pumps<br />

37<br />

No. pumps 3 + 1 R<br />

Unitary flow 750 L/s at 8,8 bar<br />

No. pumps 3 + 1 R<br />

Unitary flow 750 L/s at 58 bar<br />

No. pumps 3 + 1 R<br />

Unitary flow 750 L/s at 58 bar<br />

No. pumps 2 + 1 R<br />

Unitary flow 500 L/s at 2,2 bar<br />

No. pumps 3 + 1 R<br />

Unitary flow 475 L/s at 2,3 bar<br />

No. pumps 3 + 1 R<br />

Unitary flow 534 L/s at 1,5 bar<br />

No. pumps 10 + 2 R<br />

Unitary flow 1050 L/s at 2,16 bar<br />

No. pumps 4 + 1 R<br />

Unitary flow 1083 L/s at 1,22 bar


References in Large Pumping Systems (II)<br />

MANAGEMENT OFPUBLIC<br />

WATER SERVICES<br />

SAN PANTALEON WWTP, SPAIN.<br />

2 large sewage pumping stations +<br />

TOTAL FLOW: 3,04 m 3 /s at max. 16 m<br />

2 treated water pumping to marine outfall<br />

TOTAL FLOW: 4,8 m 3 /s at max. 27 m<br />

VUELTA OSTRERA WWTP, SPAIN.<br />

1 large treated water pumping to REUSE<br />

TOTAL FLOW: 1 m 3 /s at max. 31,5 m<br />

•INLET PUMPING STATION A: horizontal<br />

centrifugal pumps<br />

•INLET PUMPING STATION B: horizontal<br />

centrifugal pumps<br />

•TREATED WATER TO MARINE OUTFALL 1:<br />

horizontal centrifugal pumps<br />

•TREATED WATER TO MARINE OUTFALL 2:<br />

horizontal centrifugal pumps<br />

38<br />

No. pumps 2<br />

Unitary flow 500 L/s at 1,6 bar<br />

No. pumps 3<br />

Unitary flow 1014 L/s at 1,6 bar<br />

No. pumps 2<br />

Unitary flow 600 L/s at 2,7 bar<br />

No. pumps 3 + 1R<br />

Unitary flow 1200 L/s at 2,7 bar<br />

•: horizontal centrifugal pumps No. pumps 2 + 1R<br />

Unitary flow 500 L/s at 3,15 bar


MANAGEMENT OFPUBLIC<br />

WATER SERVICES<br />

References in Drinking Water Treatment Plants<br />

Burgos DWTP 142,560 m3/d<br />

39


References in Drinking Water Treatment Plants<br />

Projects Country Capacity<br />

(m 3 Capacity<br />

Projects Country Finalization Investment (€) Contract<br />

/d) (Lps)<br />

Capacity<br />

(m 3 Capacity<br />

Finalization Investment (€) Contract<br />

/d) (Lps)<br />

TP Lingzhuang - 3 DWTP Sludge Lingzhuang dewatering - 3 Plants. Sludge Tianjin dewatering Plants. China Tianjin<br />

MANAGEMENT OFPUBLIC<br />

TP Jieyuan WATER - 3 SERVICES Sludge DWTP dewatering Jieyuan - 3 Plants. Sludge Tianjin dewatering Plants. Tianjin China<br />

TP de Letur Extention DWTP and de Improvements Letur Extention and Improvements Spain<br />

750.000<br />

500.000<br />

259.200<br />

China 8.681<br />

China 5.787<br />

Spain 3.000<br />

750.000 Under Construction 8.681<br />

500.000 Under Construction 5.787<br />

259.20003-dic-03 3.000<br />

Under 7.312.313'89 Construction<br />

Under 5.277.122'92 Construction<br />

5.177.159'72 03-dic-03<br />

DB 7.312.313'89<br />

DB 5.277.122'92<br />

DB 5.177.159'72<br />

DB<br />

DB<br />

DB<br />

TP Canal del Narcea DWTP en Canal Ablaneda del Narcea - Intake en Redesign Ablaneda - Intake Spain Redesign 259.000 Spain 2.998 259.000 Under Construction 2.998 Under 12.299.835'61 Construction B 12.299.835'61 B<br />

DB<br />

DB<br />

TP La Pedrera -Equipment DWTP La Delivery Pedrera -Equipment Delivery Spain 216.000 Spain 2.500 216.00001-mar-97 2.500 6.172.680'64<br />

01-mar-97 (Subcontractor)<br />

6.172.680'64 (Subcontractor)<br />

TP Burgos - Extention DWTP Burgos - Extention Spain 142.560 Spain 1.650 142.56001-nov-03 1.650 7.222.314'77 01-nov-03 DB 7.222.314'77 DB<br />

TP Queretaro DWTP Queretaro Mexico 129.600 Mexico 1.500 129.600 Under Construction 1.500 Under 161.809.586'77 Construction BOT 161.809.586'77 BOT<br />

TP Las Eras - Active DWTP Carbon Las Eras Filter- Active Carbon Filter Spain 108.000 Spain 1.250 108.00006-oct-05 1.250 8.018.137'86 06-oct-05 DB B 8.018.137'86 DB B<br />

TP La Sagra DWTP La Sagra Spain 64.800 Spain750 64.80001-sep-98 750 19.011.214'89<br />

01-sep-98 (Subcontractor)<br />

19.011.214'89 (Subcontractor)<br />

TP Mancomunidad DWTP de Algodor Mancomunidad - Process de Optimalization Algodor - Process Optimalization Spain 64.800 Spain750 64.800 Under Construction 750 Under 4.087.081'81 Construction DB 4.087.081'81 DB<br />

TP Badajoz - Sta. DWTP Engracia Badajoz - Sta. Engracia Spain 60.480 Spain700 60.48001-jun-99 700 3.649.996'93<br />

01-jun-99 (Subcontractor)<br />

3.649.996'93 (Subcontractor)<br />

TP Khemisset - On DWTP site Technical Khemisset Support - On site Technical Support Morocco 33.696 Morocco 390 33.69601-may-98 390 01-may-98 153.378'68 DB 153.378'68 DB<br />

TP Colmenar -Sludge DWTP Treatment Colmenar and -Sludge Improvements Treatment and Improvements Spain 20.580 Spain238 20.58001-dic-01 238 3.208.398'78 01-dic-01 DB 3.208.398'78 DB<br />

TP Hellín DWTP Hellín Spain 20.400 Spain236 20.400 Under Construction 236 Under 5.144.534'19 Construction DB 5.144.534'19 DB<br />

TP Torroella de Montgrí DWTP Torroella de Montgrí Spain 19.267 Spain223 19.26701-ago-95 223 1.951.053'28 01-ago-95 DB 1.951.053'28 DB<br />

Astillero y Villaescusa El Astillero - Equipment y Villaescusa Delivery- Equipment DeliverySpain 13.000 Spain150 13.00001-may-03 150 4.865.368'48 01-may-03 BDB<br />

4.865.368'48 BDB<br />

TP with UF-La Solana DWTP with UF-La Solana Spain 6.480 Spain75 6.480 01-dic-00 75 1.225.492'53<br />

01-dic-00 (Subcontractor)<br />

1.225.492'53 (Subcontractor)<br />

TP Orbigo DWTP Orbigo Spain 4.320 Spain50 4.320 Under Construction 50 Under 3.517.495'11 Construction DB 3.517.495'11 DB<br />

TP Soller DWTP Soller Spain 4.000 Spain46 4.000 Under Construction 46 Under 1.438.400'00 Construction (Subcontractor)<br />

1.438.400'00 (Subcontractor)<br />

40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!