manager can look for a reason for <strong>the</strong> problem. It might be a lack educa<br />

tion In that area, <strong>the</strong> cost share rate may be too low (not likely), or It<br />

<strong>the</strong> specific BHP may not work with <strong>the</strong> soil type or farming rotation used<br />

or <strong>the</strong> technical assistance being provided may not understand how to<br />

design <strong>the</strong> BMP for <strong>the</strong> area. All of <strong>the</strong>se are questions that could not<br />

have been asked early In a program without a good tracking system, and as<br />

you can see <strong>the</strong> system only pointed out <strong>the</strong> potential for a problem and<br />

allowed <strong>the</strong> manager to make <strong>the</strong> proper evaluation of <strong>the</strong> situation.<br />

Summary<br />

In summary, It 1s easy to understand <strong>the</strong> need for a system that allows<br />

for <strong>the</strong> accounting of funds being used for NPS program grants. That Is<br />

<strong>the</strong> normal accounting type of bookkeeping that every agency requires.<br />

However, <strong>the</strong> need to keep track of <strong>the</strong> actual location of <strong>the</strong> BHPs that<br />

are being bought and paid for 1s a little different from our past exper<br />

ience in fundings of sewage treatment plants. The data that can be<br />

collected regarding <strong>the</strong> contracts and <strong>the</strong> BHPs in <strong>the</strong> contracts is very<br />

useful for a manager and may be used to evaluate <strong>the</strong> many aspects of <strong>the</strong><br />

total Implementation program. Not only can <strong>the</strong> location and effective<br />

ness of <strong>the</strong> BHPs be tracked, o<strong>the</strong>r Items can be investigated such as <strong>the</strong><br />

reasons for BHPs being used too an excess or not used at all. It must be<br />

understood that while a tracking system may not be able to answer all our<br />

questions, it can and should cause us to ask questions that we would<br />

o<strong>the</strong>rwise not have reason to ask. A tracking system used In conjunction<br />

with a good, detailed GIS should be able to provide <strong>the</strong> basic Input data<br />

for evaluation models that are not now being used because of lack of a<br />

good data base. The need for and <strong>the</strong> uses of a good tracking system make<br />

<strong>the</strong> time and effort necessary to start and to keep one up to date, small<br />

compared to what can be accomplished with such a system.<br />