D. Tourism <strong>Management</strong> Programme<br />

Name Area Facilities Needs/remarks<br />

Water tank (5000 l)<br />

Nyani Seronera 3 Pit latrines<br />

2 Bathrooms<br />

Kitchen, 2 dining huts<br />

2 Water tanks (5000 l each)<br />

Ngiri Seronera 3 Pit latrines<br />

4 Picnic shades<br />

Kitchen, Dining hut<br />

Water tank (5000 l)<br />

Flushing toilet required<br />

Additional 1 water tank<br />

Dining hut renovation<br />

Flushing toilet required<br />

Additional 2 water tanks<br />

Dining hut renovation<br />

Tumbili Seronera 4 Pit latrines Flushing toilet required<br />

Additional 2 water tanks<br />

Dining hut renovation<br />

Lobo Lobo Pit latrine Flushing toilet required<br />

Water tank (5000 l)<br />

Kitchen, Dining hut<br />

Picnic shades<br />

In addition, although some Park Gates have adequate facilities and are in a good state of<br />

repair, others, particularly Ndabaka and Ikoma, require upgrading, as shown in Table D.4<br />

below.<br />

Table D.4: Park Gates facilities and issues<br />

Naabi<br />

Place Facilities Condition Needs/remarks<br />

Entrance gate, toilets (pit),<br />

nature trail, display in entrance<br />

gate, staff houses<br />

Good<br />

Nature trail needs improvement and better<br />

visitor interpretative material and information<br />

Ikoma Gatehouse, toilet (pit) Average<br />

Needs improvement for toilet and gatehouse,<br />

information/display<br />

Handajega Gatehouse, toilet (pit) Good Information/display<br />

Ndabaka Gatehouse, toilet (pit) Average<br />

Kleins Gatehouse, toilet (flush)<br />

Gate good and<br />

current toilet<br />

improvements<br />

Needs improvement for toilet and gatehouse,<br />

information/display<br />

Information/display<br />

Lobo Office Good Information/display<br />

Seronera<br />

SVC<br />

Ndutu<br />

Visitor centre, toilets (flush),<br />

audio-visual room, shop,<br />

internet access<br />

Office (shared with NCA),<br />

toilet (pit)<br />

<strong>General</strong>ly good Power issue. Projector for presentations<br />

Average<br />

NCA responsible for office. Information/display/toilet<br />

improvement/ office<br />

maintenance<br />

Bologonja Gatehouse, toilet (flush) Average Information/display<br />

Grumeti Airstrip only, toilet (pit) Office, toilet improvement, information<br />

The following management actions address the issues described for this management target<br />

and relate to the facilities that SENAPA management has responsibility for.<br />

Action 2.1.1: Upgrade existing park infrastructure, in particular regarding water<br />

supply and sanitation<br />

Currently, existing Park tourism and staff facilities are basic, and many are in a poor state of<br />

repair. This management action will identify the existing SENAPA infrastructure that requires<br />

upgrading to meet the TANAPA standards and visitor expectations. Based on a provisional<br />

assessment and in collaboration with the Park Operations Programme (Target 3.2), this will<br />

involve repairing the pipeline to Seronera, improving the toilet facilities at the Seronera Visitor<br />

Centre and upgrading the existing public campsites and Park Gates, as identified in Table<br />

61