Serengeti General Management Plan
Serengeti General Management Plan
Serengeti General Management Plan
- TAGS
- serengeti
- www.zgf.de
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Serengeti</strong> National Park <strong>General</strong> <strong>Management</strong> <strong>Plan</strong><br />
146<br />
<strong>Management</strong><br />
Targets<br />
<strong>Management</strong> Actions/ Activities<br />
3.3.3.2: Enforce regulation that the use of mobile phones is restricted<br />
to within accommodation facilities and disseminate this<br />
through the Code of Conduct and signs at park gates (see also Tourism<br />
<strong>Management</strong> Programme Action 1.1.3)<br />
3.3.4: Monitor and regulate park transit traffic<br />
3.3.4.1: Implement a pilot scheme for posting park staff on buses<br />
and other transit vehicles to monitor driving and raise awareness of<br />
the Code of Conduct<br />
3.3.4.2: Regulate the time that transit vehicles take through permissible<br />
routes within SENAPA (e.g. not through Western Corridor)<br />
3.3.4.3: Introduce a weighbridge to monitor gross weight of transit<br />
vehicles<br />
Input<br />
requirements Responsibility<br />
Transport, man<br />
hours<br />
Transport, fuel,<br />
allowances<br />
Transport, communicationfacilities,<br />
equipment<br />
(speed gun)<br />
Equipment<br />
(weigh bridge)<br />
WP, WT, ADM<br />
WT, WP<br />
WT, WP, ADM<br />
RI, WT, WP,<br />
TANAPA HQ<br />
Timeframe<br />
Y1 Y2 Y3<br />
1 2 3 4 1 2 3 4 1 2 3 4<br />
Objective 4: Local, national and international collaboration in the long-term conservation and management of the SENAPA and the wider<br />
ecosystem strengthened<br />
4.1 Stakeholder<br />
collaboration and<br />
partnerships established<br />
and<br />
strengthened<br />
4.1.1: Build stakeholder collaboration both within and outside<br />
the country<br />
4.1.1.1: Identify key stakeholders both within and outside the country<br />
(all key stakeholders within and five from outside Tanzania)<br />
4.1.1.2: Establish and strengthen collaboration/partnership programmes<br />
with key stakeholders<br />
4.1.2: Develop exchange programmes with other protected areas<br />
Communication<br />
facilities<br />
Communication<br />
facilities<br />
TANAPA HQ,<br />
CPW<br />
TANAPA HQ,<br />
CPW