10.02.2013 Views

Serengeti General Management Plan

Serengeti General Management Plan

Serengeti General Management Plan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Serengeti</strong> National Park <strong>General</strong> <strong>Management</strong> <strong>Plan</strong><br />

146<br />

<strong>Management</strong><br />

Targets<br />

<strong>Management</strong> Actions/ Activities<br />

3.3.3.2: Enforce regulation that the use of mobile phones is restricted<br />

to within accommodation facilities and disseminate this<br />

through the Code of Conduct and signs at park gates (see also Tourism<br />

<strong>Management</strong> Programme Action 1.1.3)<br />

3.3.4: Monitor and regulate park transit traffic<br />

3.3.4.1: Implement a pilot scheme for posting park staff on buses<br />

and other transit vehicles to monitor driving and raise awareness of<br />

the Code of Conduct<br />

3.3.4.2: Regulate the time that transit vehicles take through permissible<br />

routes within SENAPA (e.g. not through Western Corridor)<br />

3.3.4.3: Introduce a weighbridge to monitor gross weight of transit<br />

vehicles<br />

Input<br />

requirements Responsibility<br />

Transport, man<br />

hours<br />

Transport, fuel,<br />

allowances<br />

Transport, communicationfacilities,<br />

equipment<br />

(speed gun)<br />

Equipment<br />

(weigh bridge)<br />

WP, WT, ADM<br />

WT, WP<br />

WT, WP, ADM<br />

RI, WT, WP,<br />

TANAPA HQ<br />

Timeframe<br />

Y1 Y2 Y3<br />

1 2 3 4 1 2 3 4 1 2 3 4<br />

Objective 4: Local, national and international collaboration in the long-term conservation and management of the SENAPA and the wider<br />

ecosystem strengthened<br />

4.1 Stakeholder<br />

collaboration and<br />

partnerships established<br />

and<br />

strengthened<br />

4.1.1: Build stakeholder collaboration both within and outside<br />

the country<br />

4.1.1.1: Identify key stakeholders both within and outside the country<br />

(all key stakeholders within and five from outside Tanzania)<br />

4.1.1.2: Establish and strengthen collaboration/partnership programmes<br />

with key stakeholders<br />

4.1.2: Develop exchange programmes with other protected areas<br />

Communication<br />

facilities<br />

Communication<br />

facilities<br />

TANAPA HQ,<br />

CPW<br />

TANAPA HQ,<br />

CPW

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!