<strong>Management</strong><br />
Targets<br />
3.3 Environmental<br />
impacts of park<br />
developments<br />
minimised<br />
<strong>Management</strong> Actions/ Activities<br />
3.2.5: Carry out a feasibility study for other potential water supplies<br />
to service park and tourism facilities<br />
3.3.1: Manage all infrastructure work-related machines and<br />
wastes<br />
Input<br />
requirements Responsibility<br />
Transport,<br />
plumbing materials,<br />
allowances,<br />
stationary, fuel<br />
3.3.1.1: Dispose all wastes (oils, greases, and fuels) as appropriate Waste disposal<br />
equipments i.e.<br />
plastic containers,<br />
degreasers,<br />
orange pum<br />
soap etc.<br />
3.3.1.2: Add and replace worn out machines and tools as necessary<br />
Cement, aggregates,<br />
stones<br />
and labour costs<br />
for garage landscaping<br />
3.3.2: Carry out site specific EIA/ PEA for all infrastructures Fuel, transport,<br />
stationary<br />
3.3.3: Minimise the impact of mobile phone infrastructure and<br />
use on the wilderness character of SENAPA<br />
3.3.3.1: Work with telecommunications operators to reduce environmental<br />
impact of new telecommunications infrastructure by locating<br />
at existing telecommunications sites<br />
Transport, man<br />
hours<br />
CCE, BI, Regional<br />
Water<br />
Dept., stakeholders<br />
ME<br />
ME<br />
PE, RI, BI, WT,<br />
WP<br />
CPW, ADM, PE<br />
G. 3-Year Action <strong>Plan</strong><br />
Timeframe<br />
Y1 Y2 Y3<br />
1 2 3 4 1 2 3 4 1 2 3 4<br />
145