10.02.2013 Views

Serengeti General Management Plan

Serengeti General Management Plan

Serengeti General Management Plan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Management</strong><br />

Targets<br />

3.3 Environmental<br />

impacts of park<br />

developments<br />

minimised<br />

<strong>Management</strong> Actions/ Activities<br />

3.2.5: Carry out a feasibility study for other potential water supplies<br />

to service park and tourism facilities<br />

3.3.1: Manage all infrastructure work-related machines and<br />

wastes<br />

Input<br />

requirements Responsibility<br />

Transport,<br />

plumbing materials,<br />

allowances,<br />

stationary, fuel<br />

3.3.1.1: Dispose all wastes (oils, greases, and fuels) as appropriate Waste disposal<br />

equipments i.e.<br />

plastic containers,<br />

degreasers,<br />

orange pum<br />

soap etc.<br />

3.3.1.2: Add and replace worn out machines and tools as necessary<br />

Cement, aggregates,<br />

stones<br />

and labour costs<br />

for garage landscaping<br />

3.3.2: Carry out site specific EIA/ PEA for all infrastructures Fuel, transport,<br />

stationary<br />

3.3.3: Minimise the impact of mobile phone infrastructure and<br />

use on the wilderness character of SENAPA<br />

3.3.3.1: Work with telecommunications operators to reduce environmental<br />

impact of new telecommunications infrastructure by locating<br />

at existing telecommunications sites<br />

Transport, man<br />

hours<br />

CCE, BI, Regional<br />

Water<br />

Dept., stakeholders<br />

ME<br />

ME<br />

PE, RI, BI, WT,<br />

WP<br />

CPW, ADM, PE<br />

G. 3-Year Action <strong>Plan</strong><br />

Timeframe<br />

Y1 Y2 Y3<br />

1 2 3 4 1 2 3 4 1 2 3 4<br />

145

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!