Serengeti General Management Plan
Serengeti General Management Plan
Serengeti General Management Plan
- TAGS
- serengeti
- www.zgf.de
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Serengeti</strong> National Park <strong>General</strong> <strong>Management</strong> <strong>Plan</strong><br />
144<br />
<strong>Management</strong><br />
Targets<br />
3.2 Reliable and<br />
safe water supplies<br />
established<br />
<strong>Management</strong> Actions/ Activities<br />
3.1.4: Develop Handajega airstrip as the principal airstrip servicing<br />
the western SENAPA tourism lodges and camps<br />
3.1.4.1: Complete upgrading of Handajega airstrip Fuel, machine<br />
accessories,<br />
allowances<br />
3.1.4.2: Improve access roads to Handajega to allow year-round<br />
access<br />
3.2.1: Carry out feasibility study and scope of work for reconstructing<br />
the Bologonja pipeline<br />
3.2.2: Reconstruct Bologonja pipeline in line with recommendations<br />
and specifications of feasibility study and in collaboration<br />
with major pipeline users<br />
3.2.3: Install water harvesting mechanisms in all buildings<br />
3.2.3.1: Install high capacity water storage facilities at 8 ranger<br />
posts (underground tanks)<br />
3.2.4: Carry out hydro-geological survey of the entire Park to<br />
identify potential new source of fresh water supply<br />
Input<br />
requirements Responsibility<br />
Fuel, machine<br />
accessories, allowances,building<br />
materials<br />
Transport, allowances,<br />
stationary<br />
Machines,<br />
allowances, fuel,<br />
Plumbing &<br />
building materials<br />
Fuel, transport,<br />
allowances,<br />
building materials<br />
Fuel, transport,<br />
allowances,<br />
plumrails<br />
RI, WT<br />
RI<br />
CCE, BI<br />
CCE, BI<br />
BI<br />
CCE, BI, Regional<br />
Water<br />
Dept., stakeholders<br />
Timeframe<br />
Y1 Y2 Y3<br />
1 2 3 4 1 2 3 4 1 2 3 4