10.02.2013 Views

Serengeti General Management Plan

Serengeti General Management Plan

Serengeti General Management Plan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Serengeti</strong> National Park <strong>General</strong> <strong>Management</strong> <strong>Plan</strong><br />

122<br />

<strong>Management</strong><br />

Targets<br />

1.2 Tourism<br />

access and use<br />

diversified in appropriate<br />

ways, in<br />

order to expand<br />

SENAPA tourism<br />

attractions and<br />

minimise over-use<br />

of existing attractions<br />

<strong>Management</strong> Actions/ Activities<br />

1.1.3.1: Produce a poster on the Zoning Scheme and Code of<br />

Conduct for display at park gates and lodges<br />

1.1.3.2: Produce and distribute a leaflet explaining the Zoning<br />

Scheme and Code of Conduct to visitors and drivers (in English and<br />

Swahili)<br />

1.1.3.3: Collaborate with tour operators to ensure that the Zoning<br />

Scheme and Code of Conduct leaflet reaches clients (e.g. in information<br />

packs)<br />

1.1.3.4: Ensure that the Zoning Scheme and Code of Conduct are<br />

incorporated in updated versions of park guides<br />

1.2.1: Identify and establish a broad spread of tourism sinks in<br />

the High and Low Use Zones<br />

1.2.1.1: Carry out a survey with TATO and concession holders of<br />

possible tourism sinks within SENAPA, with recommendations on<br />

how to develop an optimal number of facilities according to zonal<br />

LAU and projected future tourism numbers<br />

1.2.1.2: Consult with special interest groups (e.g. birders) regarding<br />

possible sites<br />

1.2.1.3: Develop access and interpretation facilities at selected<br />

sites<br />

Input<br />

requirements Responsibility<br />

Stationary,<br />

allowances, fuel,<br />

production<br />

charges<br />

Stationary, fuel,<br />

transport<br />

Phone calls/ fax,<br />

stationary,<br />

allowances<br />

Communication<br />

facilities<br />

Fuel,<br />

allowances,<br />

phone calls/fax<br />

Phone calls/fax,<br />

E-mails, fuel,<br />

allowances<br />

Fuel, allowances,<br />

display<br />

materials, man<br />

hours<br />

WT<br />

WT<br />

WT<br />

TANAPA HQ<br />

WT, PE<br />

WT<br />

WT<br />

Timeframe<br />

Year 1 Year 2 Year 3<br />

1 2 3 4 1 2 3 4 1 2 3 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!