Serengeti General Management Plan
Serengeti General Management Plan
Serengeti General Management Plan
- TAGS
- serengeti
- www.zgf.de
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Management</strong><br />
Targets<br />
1.4 Viable populations<br />
of Black<br />
rhino restored to<br />
the <strong>Serengeti</strong><br />
1.5 Viable populations<br />
of Wild dogs<br />
restored to the<br />
<strong>Serengeti</strong><br />
<strong>Management</strong> Actions/ Activities<br />
1.3.3: Implement fire management measures as per SENAPA Fire<br />
<strong>Management</strong> <strong>Plan</strong><br />
1.4.1: Protect existing rhino populations from poaching threats<br />
(see also Park Operations Programme Target 1.1)<br />
1.4.2: Minimise tourism disturbance to Black rhinos<br />
1.4.2.1:Raise driver and visitor awareness of rhino disturbance issues,<br />
with reference to the Tourism Code of Conduct (see also Tourism<br />
<strong>Management</strong> Programme Action 1.1.2)<br />
1.4.2.2: Control visitor access in the rhino area, especially to the<br />
core area away from the game viewing trails<br />
1.4.3: Design and implement a scheme for the re-introduction of<br />
Black rhinos to SENAPA<br />
1.4.3.1: Obtain the genetic information relating to the existing populations<br />
1.4.3.2: Determine and prioritise suitable key areas for reintroduction<br />
of rhinos to SENAPA<br />
Input<br />
requirements Responsibility<br />
Fuel,<br />
allowances<br />
Fuel,<br />
allowances<br />
PE, WP<br />
WP<br />
Phone calls, fuel WT<br />
Fuel,<br />
allowances<br />
Fuel,<br />
allowances<br />
Fuel,<br />
allowances<br />
1.4.3.3: Create and supplement new populations at identified sites Fuel,<br />
allowances<br />
1.5.1: Collaborate with TAWIRI, NCAA, communities and others<br />
to understand the status of Wild dogs in the entire ecosystem<br />
1.5.2: Support efforts to reduce threats to the natural reintroduction<br />
of Wild dogs to SENAPA<br />
Fuel, phone<br />
calls, stationary<br />
WP<br />
MEM<br />
PE<br />
MEM<br />
CPW<br />
G. 3-Year Action <strong>Plan</strong><br />
Timeframe<br />
Year 1 Year 2 Year 3<br />
1 2 3 4 1 2 3 4 1 2 3 4<br />
119