10.02.2013 Views

Serengeti General Management Plan

Serengeti General Management Plan

Serengeti General Management Plan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Serengeti</strong> National Park <strong>General</strong> <strong>Management</strong> <strong>Plan</strong><br />

3.2.2: ReconstructBologonjapipeline<br />

in collaboration<br />

with major<br />

pipeline us-<br />

ers<br />

114<br />

The water extraction from<br />

the reconstructed pipeline is<br />

unsustainable<br />

structed at suitable intervals to inhibit<br />

water flow and erosion<br />

� Regular monitoring should be carried<br />

out to check the rehabilitation methods<br />

are successful and adapt methods<br />

should it be necessary<br />

� The flow rates of effected watercourses<br />

should be established<br />

(and/or recharge rates of underground<br />

resources)<br />

� Leak detection systems should be<br />

installed to facilitate future maintenance<br />

The specific Programme actions that will require a detailed Action/ Development Site Specific<br />

EIA 6 prior to implementation are:<br />

� Design and implementation of a new road construction programme for establishing and<br />

maintaining game viewing and anti-poaching tracks and loops (Action 3.1.3)<br />

� Develop Handajega airstrip as the principal airstrip servicing western SENAPA (Action<br />

3.1.4)<br />

6<br />

Guidelines and document format are provided in the TANAPA (1994b) as well as the TANAPA Strategic <strong>Plan</strong>ning<br />

Manual (1995a)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!