07.02.2013 Views

Minutes of 964 Meeting of the Town Planning Board held on 20.8 ...

Minutes of 964 Meeting of the Town Planning Board held on 20.8 ...

Minutes of 964 Meeting of the Town Planning Board held on 20.8 ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

- 36 -<br />

adaptive re-use or it could be demolished to cater for <str<strong>on</strong>g>the</str<strong>on</strong>g> open<br />

space development, as appropriate;<br />

Resp<strong>on</strong>ses to Representers’ Proposals<br />

(xi) heritage grading – heritage grading was within <str<strong>on</strong>g>the</str<strong>on</strong>g> ambit <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

AAB ra<str<strong>on</strong>g>the</str<strong>on</strong>g>r than <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>Board</str<strong>on</strong>g>. AMO had included <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

representati<strong>on</strong> site as a new item proposed to be assessed by<br />

AAB;<br />

(xii) planning permissi<strong>on</strong> requirement – <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>trol regarding <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

requirement for planning permissi<strong>on</strong> was c<strong>on</strong>sidered appropriate.<br />

The scale <str<strong>on</strong>g>of</str<strong>on</strong>g> alterati<strong>on</strong> and/or modificati<strong>on</strong> to <str<strong>on</strong>g>the</str<strong>on</strong>g> existing<br />

buildings and any new structures would be c<strong>on</strong>trolled by <str<strong>on</strong>g>the</str<strong>on</strong>g> GFA<br />

restricti<strong>on</strong> stipulated in <str<strong>on</strong>g>the</str<strong>on</strong>g> Notes <str<strong>on</strong>g>of</str<strong>on</strong>g> “OU” z<strong>on</strong>e covering <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

representati<strong>on</strong> site. The detailed c<strong>on</strong>servati<strong>on</strong> requirements and<br />

management <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> underground remains and <str<strong>on</strong>g>the</str<strong>on</strong>g> architectural<br />

features <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Former Central School at <str<strong>on</strong>g>the</str<strong>on</strong>g> site should be dealt<br />

with by <str<strong>on</strong>g>the</str<strong>on</strong>g> AMO;<br />

(xiii) open space provisi<strong>on</strong> – <str<strong>on</strong>g>the</str<strong>on</strong>g> Notes <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> OZP stipulated that public<br />

open space <str<strong>on</strong>g>of</str<strong>on</strong>g> not less than 1,200m 2 should be provided <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> site.<br />

There were c<strong>on</strong>straints in providing more open space, particularly<br />

in <str<strong>on</strong>g>the</str<strong>on</strong>g> scenario that <str<strong>on</strong>g>the</str<strong>on</strong>g> JPC Building was to be retained. Detailed<br />

landscaping design should be dealt with by <str<strong>on</strong>g>the</str<strong>on</strong>g> prop<strong>on</strong>ent at <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

detailed design stage;<br />

(xiv) building height restricti<strong>on</strong> – a building height restricti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

75mPD had been imposed <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> representati<strong>on</strong> site <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

subsequent draft Sai Ying Pun & Sheung Wan OZP No. S/H3/24<br />

after a comprehensive review <str<strong>on</strong>g>of</str<strong>on</strong>g> building height restricti<strong>on</strong>s for<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> Area to ensure any development <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> site would be<br />

compatible with <str<strong>on</strong>g>the</str<strong>on</strong>g> surrounding areas;

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!