Open Space Provisi<strong>on</strong><br />

- 34 -<br />

(v) <str<strong>on</strong>g>the</str<strong>on</strong>g> 1,200m 2 public open space provisi<strong>on</strong> as stipulated in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

Notes for <str<strong>on</strong>g>the</str<strong>on</strong>g> subject z<strong>on</strong>e was <str<strong>on</strong>g>the</str<strong>on</strong>g> minimum requirement, which<br />

was about 20% <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> representati<strong>on</strong> site area and equivalent to<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> lower platform area. The Explanatory Statement <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> OZP<br />

stated that to cater for <str<strong>on</strong>g>the</str<strong>on</strong>g> open space development, <str<strong>on</strong>g>the</str<strong>on</strong>g> existing<br />

JPC Building might need to be demolished. However, retenti<strong>on</strong><br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> building for adaptive re-use would also be allowed;<br />

(vi) to allow more flexibility for <str<strong>on</strong>g>the</str<strong>on</strong>g> adaptive re-use <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> site for<br />

creative industries and related uses, it was envisaged that part <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> existing open area <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> upper and middle platforms might be<br />

used for <str<strong>on</strong>g>the</str<strong>on</strong>g> display <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> remains <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Former Central School<br />

and for <str<strong>on</strong>g>the</str<strong>on</strong>g> provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> covered walkways, activity venue and<br />

exhibiti<strong>on</strong> area. In <str<strong>on</strong>g>the</str<strong>on</strong>g> scenario that <str<strong>on</strong>g>the</str<strong>on</strong>g> JPC Building <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> lower<br />

platform was retained, part <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> public open space (about 195m 2 )<br />

would need to be provided <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> upper platform in order to fulfill<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> minimum requirement <str<strong>on</strong>g>of</str<strong>on</strong>g> 1,200m 2 ;<br />

(vii) <str<strong>on</strong>g>the</str<strong>on</strong>g> wall trees and major trees within <str<strong>on</strong>g>the</str<strong>on</strong>g> site would be preserved.<br />

Detailed landscaping design should be dealt with by <str<strong>on</strong>g>the</str<strong>on</strong>g> project<br />

prop<strong>on</strong>ent at <str<strong>on</strong>g>the</str<strong>on</strong>g> detailed design stage;<br />

Development Restricti<strong>on</strong>s<br />

(viii) <str<strong>on</strong>g>the</str<strong>on</strong>g> Notes <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> z<strong>on</strong>e allowed a maximum GFA <str<strong>on</strong>g>of</str<strong>on</strong>g> 20,000m 2 at<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> site, i.e. 5,000m 2 <strong>on</strong> top <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> GFA <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> existing buildings<br />

(Blocks A and B) (15,000m 2 ). The additi<strong>on</strong>al GFA might<br />

possibly be taken up in such forms as an additi<strong>on</strong>al covered area<br />

for wea<str<strong>on</strong>g>the</str<strong>on</strong>g>r protecti<strong>on</strong> at <str<strong>on</strong>g>the</str<strong>on</strong>g> central courtyard, gallery space<br />

adjoining Blocks A and B, covered walkways and o<str<strong>on</strong>g>the</str<strong>on</strong>g>r structures<br />

required to meet <str<strong>on</strong>g>the</str<strong>on</strong>g> current building standards, which were<br />

accountable for GFA. Given <str<strong>on</strong>g>the</str<strong>on</strong>g> 15,000m 2 GFA for <str<strong>on</strong>g>the</str<strong>on</strong>g> existing