06.02.2013 Views

Download it here (pdf) - Svebio

Download it here (pdf) - Svebio

Download it here (pdf) - Svebio

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

16<br />

EXCURSION GUIDE<br />

prE- anD post ConFErEnCE<br />

transFEr toUrs<br />

– The easiest way to get to World Bioenergy 2012!<br />

A distinctive feature of World Bioenergy is the popular preand<br />

post conference transfer tours on the 28 May and 1<br />

June. They offer a very convenient, cost- and time-effective<br />

travel option from airports in Stockholm, Arlanda and<br />

Skavsta, and Copenhagen Kastrup to Jönköping and back.<br />

These tours provide you w<strong>it</strong>h an exclusive opportun<strong>it</strong>y to<br />

vis<strong>it</strong> a selection of bioenergy facil<strong>it</strong>ies en route, w<strong>it</strong>h professional<br />

guidance and lunch break on the way.<br />

Buses will leave Arlanda and Kastrup mid-morning on 28<br />

May. After the conference, on 1 June, post conference<br />

transfer tours will take different routes back to Stockholm<br />

Arlanda Airport and Copenhagen Kastrup Airport and arrive<br />

in time for late afternoon departures.<br />

Please note that tours are subject to changes. For more information<br />

and registration, see www.worldbioenergy.com.<br />

Registration is necessary on all pre- and post<br />

conference transfer tours.<br />

Oslo<br />

Göteborg (Gothenburg)<br />

Copenhagen<br />

Kastrup<br />

prE ConFErEnCE transFEr toUrs, 28 MaY<br />

prE. toUr 1, BIOENERGy IN aGRICUlTURE aND CHP<br />

Departure from Stockholm arlanda airport at 09.00<br />

Combined heat and power plant, short rotation coppice<br />

production, small scale biodiesel production, biogas<br />

plant using municipal residues, food waste and ley crops<br />

and a green house using biomass for heating.<br />

Biomass CHP plant delivering 50 % electric<strong>it</strong>y and 100 % heat to inhab<strong>it</strong>ants<br />

in Enköping.<br />

Malmö<br />

Vänern<br />

Vättern<br />

Örebro<br />

JÖNKÖPING<br />

WORLD BIOENERGY 2012<br />

Västerås<br />

Norrköping<br />

Linköping<br />

Öland<br />

0 km 40 80 120 km<br />

Stockholm ArlAndA internAtionAl Airport – elmiA, Jönköping<br />

Nyköping<br />

Arlanda<br />

STOCKHOLM<br />

Skavsta<br />

Gotland<br />

BALTIC SEA<br />

CHp using biomass fuels<br />

– Ena Energi aB, Enköping<br />

Ena Energi AB is a producer and distributor of district heating<br />

and electric<strong>it</strong>y in the c<strong>it</strong>y of Enköping. The company<br />

was started in 1972 by the municipal<strong>it</strong>y of Enköping. The<br />

municipal<strong>it</strong>y still controls 100 percent of the company.<br />

Enköping is located 70 km from Stockholm, w<strong>it</strong>h around<br />

20,000 inhab<strong>it</strong>ants in the c<strong>it</strong>y area. Today the major<strong>it</strong>y of<br />

the buildings and the industry in town is connected to the<br />

district heating net. The connected effect is about 141<br />

MW and is divided between 1,512 customers, of which<br />

1,180 are single family houses.<br />

The total length of the net is 84 km and the heat consumption<br />

for a year w<strong>it</strong>h normal temperature is around 20 GWh.<br />

The production is based mainly on biomass and is located<br />

only 1.5 km from the main square in the c<strong>it</strong>y.<br />

Ena Energi has three boilers for heat production, originally<br />

using oil or propane gas as fuel. The CHP plant produces<br />

80-85 percent of the yearly consumption of district heating<br />

in Enköping.<br />

www.enae.se

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!