s<br />

HMM<br />

Assessment Study<br />

Report: CDF-20(A)<br />

February 2004<br />

page 92 of 422<br />

• No failures assumed.<br />

• As a result of boil-off a refueling flight could be made but is not considered a<br />

baseline. Boil-off is considerable, but acceptable in terms of loss of performance if<br />

kept below 70 kg/month of liquid hydrogen<br />

• No reboosting of composite is included.<br />

The following parameters in Table 2-33 have been used in the model given the assumptions<br />

above:<br />

2) Launch Vehicles, Operations & Production Assumptions<br />

Launch Vehicles<br />

Assumption: Launch window independent between vehicles<br />

Number Name<br />

Nr launches<br />

/year<br />

Launch rate<br />

Performance to<br />

LEO (kg)<br />

Fairing dim1 (m) Fairing dim2 (m)<br />

1 ENERGIA 12 31 80,000<br />

35 6<br />

2 A5 8 46 20,000<br />

10 4.5<br />

3 Proton 8 46 20,000<br />

4 Soyuz 12 31 8,000<br />

5 Shuttle 4 92<br />

Operations<br />

Composite Operations time (non-manned modules) 30 days After Berthing<br />

Composite Operations time (manned modules) 90 days After dock & assembly<br />

LEOP 2 days<br />

Commissioning Duration 8 days Should be about 30 days for launch of the first element in order to check the Ground Segment<br />

On-orbit assembly 3 days<br />

Production Assumption<br />

Development/Integration 8 years/element<br />

Element Availability rate 30 days I.e. time btw one element finished with respect to the previous one<br />

Margin & Commissioning<br />

Assembly margin for each element 0 days<br />

Overall assembly margin 180 days<br />

Commissioning duration 60 days<br />

Commissioning duration/Crew Training 30 days<br />

2.8.2 Sensitivity analysis<br />

Table 2-33: Assembly parameters<br />

Apart from the following baseline analysis, the effect of certain parameters on the resulting<br />

assembly time and total boil-off have been examined.<br />

1. Effect of Energia launch on assembly time<br />

Assemly time (years)<br />

10<br />

9<br />

8<br />

7<br />

6<br />

5<br />

4<br />

3<br />

2<br />

1<br />

0<br />

Assembly time and boil-off<br />

4 6 8 10 12<br />

Energia Launch Rate (launches/year)<br />

140000<br />

120000<br />

100000<br />

80000<br />

60000<br />

40000<br />

20000<br />

0<br />

Boil-off (kg)<br />

Assembly time<br />

Boil-off (300 kg/month)<br />

Boil-off (100 kg/month)<br />

Boil-off (34 kg/month)<br />

Figure 2-47: Assembly time and boil-off as a function of launch rate