s<br />

HMM<br />

Assessment Study<br />

Report: CDF-20(A)<br />

February 2004<br />

page 121 of 422<br />

of designing the backbone structure as initial assembly support structure, providing it with<br />

manoeuvre capability and robotic arm(s).<br />

The prolonged exposure to 0-g conditions is negative for crew health and planetary surface<br />

operations capability. The implementation of micro gravity countermeasures for the crew is<br />

considered necessary. A trade-off was performed, and a system was described, able to provide to<br />

the crewmembers artificial gravity (centrifuge) during their sleeping hours. The effects of this<br />

partial compensation are not well known yet, so they should be studied with a precursor<br />

experiment e.g. on the ISS.<br />

2.12.3 Model philosophy and qualification<br />

Due to system complexity, Qualification Models (QMs) are required for the Mars Excursion<br />

Vehicle (complete), and Earth Return Capsule (ERC) elements.<br />

Some QM elements will be tested together on ground.<br />

For schedule reasons the flight elements will not be tested together on the ground. Interface<br />

reference models have to be produced for ground testing of the system elements. These models<br />

have to be based on the design at the QM maturity stage. In principle a QM element will be used<br />

in combination with an interfacing FM element to perform system interface tests. Later on, the<br />

QM is kept as reference model for the whole mission.<br />

The capability to load the cryopropellant in-orbit has to be significantly improved, to support the<br />

required boil-off compensation before TMI. The loading system and its relevant operations have<br />

to be qualified with a dedicated flight mission. This could be accomplished after one of the first<br />

launches of the propulsion elements, to verify the loading on a reduced configuration of the<br />

system.<br />

For a program of a similar time span is the obsolescence of the components is a problem.<br />

Considering the high rate of innovation in the field of electronic components such as processors,<br />

memory banks and computer boards, it is guaranteed that from the time of design until the<br />

mission exploitation, parts will rapidly evolve and new generations will replace the old. Design<br />

of avionic subsystems and units would quickly become obsolete. It is therefore necessary to<br />

implement some mitigating factors to this process:<br />

• Applying open design to facilitate the implementation of more modern (space qualified)<br />

parts along the development phase, as soon as they become available.<br />

• Selecting components in the field of military or commercial aviation, where their usage is<br />

planned to last decades, so the production lines are kept alive accordingly.<br />

2.12.3.1 Qualification flight<br />

A qualification flight is required. There is no way to assess the system’s real capability to<br />

perform its mission and to verify its actual reliability without performing a flight test.<br />

In the best scenario, a scaled model of the manned vehicle should be built, and launched. It<br />

should be piloted in fully automatic mode. It should perform a complete mission sequence that<br />

includes:<br />

• Injection into transfer orbit to Mars<br />

• Capture and injection into Low Mars Orbit<br />

• Descent, landing and deployment of a Surface Element (full scale) on the same landing<br />

site selected for the manned mission<br />

• Launch and ascent of a Mars Ascent Vehicle (scaled)