CFE - 2006 annual report - Vinci
CFE - 2006 annual report - Vinci
CFE - 2006 annual report - Vinci
- TAGS
- annual
- vinci
- publi.vinci.com
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
● Russia<br />
The new trailer “Marieke” was deployed for almost three<br />
months for the deepening works of the new access chan-<br />
nel in the framework of the construction of the new storm<br />
surge barrier of Saint-Petersburg.<br />
● Bulgaria<br />
DI obtained an important contract for the deepening and<br />
widening of the access channel and turning basin of the<br />
newly upgraded port of Burgas.<br />
Filip Cuyvers, 36 years<br />
Dredge master<br />
I am currently working on the dredger “Al Mahaar” as first<br />
dredge master. Using this heavy cutter dredger, we are cre-<br />
ating a new waterfront in Abu Dhabi called “Al Raha Beach”.<br />
I am proud to be part of this prestigious project. Once again,<br />
the DEME group is leaving its mark on the Middle East.<br />
I first came in contact with the dredging business through<br />
my family. The exotic, international and creative aspects<br />
of the trade attracted me greatly. At the end of 1998, I was<br />
recruted by DEME where I was trained as a “dredge master”.<br />
Almost immediately, I went on board the “Brabo”, as a sec-<br />
ond dredge master. Over the past eight years, I have worked<br />
on eight large or very large cuttersuction dredgers working<br />
● Italy<br />
SIDRA obtained and completed numerous contracts,<br />
including the rehabilitation works of 1,800 m quay walls<br />
of the container terminal and deepening of the port of<br />
Gioia Tauro, combined with the replenishment of nearby<br />
beaches and the first part of the replenishment works of<br />
five beaches in the southern part of the Lazio region. The<br />
same deep dredging method was applied for the reclama-<br />
tion of the beaches of the Abruzzo region. These works<br />
were completed in early 2007.<br />
Construction of a new 400 m quay wall in concrete blocks<br />
in Crotone was continued. The project also involves dredg-<br />
ing of polluted sediments and removal of a large wreck.<br />
In Livorno the environmental dredging of Canale Industriale<br />
has been completed by SIDRA in combination with DEC and<br />
a local partner. The project involved lagooning and treat-<br />
ment of heavily contaminated sediments.<br />
In Trapani, an important combined dredging/civil works<br />
contract was completed in joint venture. The project<br />
involved the construction of substantial marine infrastruc-<br />
ture to prepare the port for the pre-races for the America’s<br />
Cup held in <strong>2006</strong>.<br />
After intensive training on a simulator, I became “cutter<br />
operator” on our “d’Artagnan” in Bayonne, Aviles and Doha<br />
(Qatar).<br />
Feeling the teeth of this giant dredger penetrate rock is a<br />
fantastic sensation.<br />
C F E A N N U A L R E P O R T 2 0 0 6 I 1 2 6 t h on every continent.<br />
c o r p o r a t e f i n a n c i a l y e a r<br />
In Italy, the traling<br />
suction hopper<br />
dredger “Pearl River”<br />
with deep suction<br />
installation dredged<br />
sand in depths of -110 m<br />
and replenished the<br />
beaches of Lazio.<br />
6 9