05.02.2013 Views

CFE - 2006 annual report - Vinci

CFE - 2006 annual report - Vinci

CFE - 2006 annual report - Vinci

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6 6<br />

from the left to the right:<br />

Martin Ockier, Eric Tancré, Alain Bernard, Pierre Catteau,<br />

Dirk Poppe, Theo Van de Kerckhove, Marc Maes,<br />

Jos van Ijseldijk, Philip Hermans, Pierre Potvliege,<br />

Patrick Demoor, Christian Van Meerbeeck<br />

The DEME-group managed to consolidate and strengthen<br />

its foremost position as a first-rated worldwide dredging<br />

and hydraulic engineering group.<br />

In <strong>2006</strong>, the group registered a turnover of 1,077 mil-<br />

lion Euro (compared to 845 million Euro in 2005). As of<br />

1st January 2007 the order book includes works for over<br />

1,600 million Euro, to be carried out on all continents.<br />

Short and medium term market perspectives are more<br />

than promising.<br />

The core business market is strongly driven by a number<br />

of factors including the fast-growing degree of container-<br />

isation and the related demand for new or extended<br />

ports and navigation channels, the development of LNG<br />

port infrastructure, quickly expanding oil-and-gas pipeline<br />

(in millions of EUR) <strong>2006</strong> 2005<br />

Order book 800.5 695.0<br />

as of December 31 – at 50 %<br />

Revenue 538.7 422.6<br />

networks, shortage of industrial and residential surface in<br />

coastal areas, increasing environmental awareness, the<br />

demand for lasting coastal protection to cope with climatic<br />

changes, and soaring beach and waterborne tourism.<br />

As a further support to the international activities, the<br />

new 5,600 m³ capacity trailing suction hopper dredger<br />

“Marieke” was commissioned to DEME in September <strong>2006</strong><br />

and her sister ship “Reynaert” was launched in November<br />

<strong>2006</strong>. The latter vessel is due to be commissioned in mid<br />

March 2007. A further two trailers were ordered in <strong>2006</strong>.<br />

The 11,650 m³ capacity trailer “Brabo” will be commis-<br />

sioned in November 2007; the 9,000 m³ capacity trailer<br />

“Breydel” will be ready by April 2008. Add to these the<br />

3,500 m³ trailer “Melina” that joined DEME’s fleet early in<br />

C F E A N N U A L R E P O R T 2 0 0 6 I 1 2 6 t h C F E A N N U A L R E P O R T 2 0 0 6 I c o r p o r a t e f i n a n c i a l y e a r<br />

1 2 6 t h c o r p o r a t e f i n a n c i a l y e a r

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!