CFE - 2006 annual report - Vinci
CFE - 2006 annual report - Vinci
CFE - 2006 annual report - Vinci
- TAGS
- annual
- vinci
- publi.vinci.com
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
6 6<br />
from the left to the right:<br />
Martin Ockier, Eric Tancré, Alain Bernard, Pierre Catteau,<br />
Dirk Poppe, Theo Van de Kerckhove, Marc Maes,<br />
Jos van Ijseldijk, Philip Hermans, Pierre Potvliege,<br />
Patrick Demoor, Christian Van Meerbeeck<br />
The DEME-group managed to consolidate and strengthen<br />
its foremost position as a first-rated worldwide dredging<br />
and hydraulic engineering group.<br />
In <strong>2006</strong>, the group registered a turnover of 1,077 mil-<br />
lion Euro (compared to 845 million Euro in 2005). As of<br />
1st January 2007 the order book includes works for over<br />
1,600 million Euro, to be carried out on all continents.<br />
Short and medium term market perspectives are more<br />
than promising.<br />
The core business market is strongly driven by a number<br />
of factors including the fast-growing degree of container-<br />
isation and the related demand for new or extended<br />
ports and navigation channels, the development of LNG<br />
port infrastructure, quickly expanding oil-and-gas pipeline<br />
(in millions of EUR) <strong>2006</strong> 2005<br />
Order book 800.5 695.0<br />
as of December 31 – at 50 %<br />
Revenue 538.7 422.6<br />
networks, shortage of industrial and residential surface in<br />
coastal areas, increasing environmental awareness, the<br />
demand for lasting coastal protection to cope with climatic<br />
changes, and soaring beach and waterborne tourism.<br />
As a further support to the international activities, the<br />
new 5,600 m³ capacity trailing suction hopper dredger<br />
“Marieke” was commissioned to DEME in September <strong>2006</strong><br />
and her sister ship “Reynaert” was launched in November<br />
<strong>2006</strong>. The latter vessel is due to be commissioned in mid<br />
March 2007. A further two trailers were ordered in <strong>2006</strong>.<br />
The 11,650 m³ capacity trailer “Brabo” will be commis-<br />
sioned in November 2007; the 9,000 m³ capacity trailer<br />
“Breydel” will be ready by April 2008. Add to these the<br />
3,500 m³ trailer “Melina” that joined DEME’s fleet early in<br />
C F E A N N U A L R E P O R T 2 0 0 6 I 1 2 6 t h C F E A N N U A L R E P O R T 2 0 0 6 I c o r p o r a t e f i n a n c i a l y e a r<br />
1 2 6 t h c o r p o r a t e f i n a n c i a l y e a r