6 2<br />

Erecting of<br />

catenaries by<br />

Engema Rail on<br />

the Liège - Cologne<br />

high-speed rail<br />

route.<br />

Jacques Ninanne<br />

Jean-Paul Coch, Michel Van der Eecken,<br />

Bruno Lambert, Jean-Pierre Borghmans<br />

In <strong>2006</strong>, Engema Rail consolidated its position on the<br />

Belgian markets for overhead wires and rail signalling.<br />

Its revenues have been increasing constantly for several<br />

years.<br />

During the year, Engema Rail obtained final acceptance<br />

of the overhead wires at Chênée, Herstal, and Holsbeek<br />

stations and at the Amercoeur Bridge in Liège, as well as<br />

acceptance of the signalling work at the Berchem station<br />

in Antwerp.<br />

Engema Rail won a second RER contract in <strong>2006</strong> for the<br />

implementation of signalling on the Diegem-Leuven seg-<br />

ment, and, within the framework of its overhead wire<br />

project on the Liège-Cologne TGV line, the company<br />

obtained major additional orders in the Soumagne and<br />

(in millions of EUR) <strong>2006</strong> 2005<br />

Order book 20.1 20.5<br />

as of December 31<br />

Revenue 16.1 14.0<br />

Walhorn tunnels. The Engema Rail personnel have proven<br />

their expertise in the installation of rail tunnel equipment:<br />

a fire detector in the Bierbeek tunnel, GSMR radiating<br />

cable and signal cables in the Peerdsbos tunnel and in the<br />

Antwerp Central Station tunnel, as well as fans for heat and<br />

smoke exhaust in the Soumagne and Walhorn tunnels.<br />

Engema Montage had a good year in <strong>2006</strong> and delivered<br />

several turnkey projects in the northern part of the country<br />

for the purpose of creating interconnections for European<br />

networks.<br />

Engema Montage’s goal in the next few years is to export<br />

its expertise in the installation and pulling of cables and<br />

to develop maintenance business in theme parks and the<br />

assembly of windmills.<br />

C F E A N N U A L R E P O R T 2 0 0 6 I 1 2 6 t h C F E A N N U A L R E P O R T 2 0 0 6 I c o r p o r a t e f i n a n c i a l y e a r<br />