6 2<br />
Erecting of<br />
catenaries by<br />
Engema Rail on<br />
the Liège - Cologne<br />
high-speed rail<br />
route.<br />
Jacques Ninanne<br />
Jean-Paul Coch, Michel Van der Eecken,<br />
Bruno Lambert, Jean-Pierre Borghmans<br />
In <strong>2006</strong>, Engema Rail consolidated its position on the<br />
Belgian markets for overhead wires and rail signalling.<br />
Its revenues have been increasing constantly for several<br />
years.<br />
During the year, Engema Rail obtained final acceptance<br />
of the overhead wires at Chênée, Herstal, and Holsbeek<br />
stations and at the Amercoeur Bridge in Liège, as well as<br />
acceptance of the signalling work at the Berchem station<br />
in Antwerp.<br />
Engema Rail won a second RER contract in <strong>2006</strong> for the<br />
implementation of signalling on the Diegem-Leuven seg-<br />
ment, and, within the framework of its overhead wire<br />
project on the Liège-Cologne TGV line, the company<br />
obtained major additional orders in the Soumagne and<br />
(in millions of EUR) <strong>2006</strong> 2005<br />
Order book 20.1 20.5<br />
as of December 31<br />
Revenue 16.1 14.0<br />
Walhorn tunnels. The Engema Rail personnel have proven<br />
their expertise in the installation of rail tunnel equipment:<br />
a fire detector in the Bierbeek tunnel, GSMR radiating<br />
cable and signal cables in the Peerdsbos tunnel and in the<br />
Antwerp Central Station tunnel, as well as fans for heat and<br />
smoke exhaust in the Soumagne and Walhorn tunnels.<br />
Engema Montage had a good year in <strong>2006</strong> and delivered<br />
several turnkey projects in the northern part of the country<br />
for the purpose of creating interconnections for European<br />
networks.<br />
Engema Montage’s goal in the next few years is to export<br />
its expertise in the installation and pulling of cables and<br />
to develop maintenance business in theme parks and the<br />
assembly of windmills.<br />