CFE - 2006 annual report - Vinci
CFE - 2006 annual report - Vinci
CFE - 2006 annual report - Vinci
- TAGS
- annual
- vinci
- publi.vinci.com
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
6 0<br />
Saint-Michel clinic<br />
in Brussels.<br />
Architect: Bureau<br />
d’Architecture<br />
E. Verhaegen.<br />
Christian Van Hamme<br />
Yvan Georgery, Yves Persenaire,<br />
André Vandenbauw, Philippe Flock,<br />
Thierry Lambermont, Jacky Landuyt,<br />
Roland Hallot<br />
Continuing the uninterrupted growth it has experienced<br />
since its creation in 1977, the company saw its revenue<br />
increase again this year. The growth <strong>report</strong>ed by Nizet<br />
Entreprise is based on an increase in the number and<br />
average size of the projects it has carried out.<br />
With a workforce of some twenty engineers and more<br />
than 160 electricians, the company serves the “Tertiary”<br />
and “Electromechanical“ market segments and provides<br />
seven-day-a-week maintenance service.<br />
The renovation of the “Tour du Midi”, joint-venture work<br />
on the “D4-D5” buildings for the European Parliament<br />
in Brussels, the renovation and expansion project for the<br />
Edith Cavell and Molière Longchamps clinics in Brussels<br />
and for the Jolimont clinic, the electrical work for the<br />
(in millions of EUR) <strong>2006</strong> 2005<br />
Order book 19.0 19.3<br />
as of December 31<br />
Revenue 34.7 29.3<br />
WN128 project at GlaxoSmithKline Biologicals in Wavre<br />
and the electrical and renovation work at the Museum<br />
of Natural Sciences were among the major electrical<br />
installations in the “Tertiary” sector that contributed to its<br />
revenue.<br />
Projects in the “Electromechanical” sector include the<br />
reconditioning of the Roselies wastewater treatment plant<br />
(in the Basse Sambre region), the wastewater treatment<br />
plant at Marchienne-au-Pont, the Place Flagey water<br />
basin in Ixelles, the reconditioning of the Aubange water<br />
pumping station in the province of Luxembourg and the<br />
reconditioning of the overhead cranes of the Plate Taille<br />
dam in Cerfontaine.<br />
C F E A N N U A L R E P O R T 2 0 0 6 I 1 2 6 t h C F E A N N U A L R E P O R T 2 0 0 6 I 1 2 6 c o r p o r a t e f i n a n c i a l y e a r<br />
t h c o r p o r a t e f i n a n c i a l y e a r