(in millions of EUR) <strong>2006</strong> 2005<br />

Order book 33.4 19.8<br />

as of December 31<br />

Activity 32.5 15.1<br />

Both companies continued their respective growth in<br />

Hungary and Slovakia. The “Centre Point II” office building<br />

was delivered in the middle of <strong>2006</strong> to GTC and resulted in<br />

GTC winning the <strong>2006</strong> “Best Overall Development” prize.<br />

The first residential project, Corvinus Palace, was almost<br />

complete at the end of <strong>2006</strong>, as were the new office block<br />

of National Instruments in Debrecen, whose delivery was<br />

scheduled for February, 2007 and which was completed in a<br />

record time of eight months.<br />

In Slovakia, the “Park One” project was enclosed before<br />

winter, and a contract for tenant fit-out work was signed at<br />

the beginning of 2007, which will ensure continued activity<br />

in 2007.<br />

August <strong>2006</strong> was marked by the signing of two major<br />

contracts. The first was for the construction of the “Aréna<br />

In May <strong>2006</strong> <strong>CFE</strong> Hungary obtained the contract for the<br />

construction of the offices of National Instruments in<br />

Debrecen. This building comprise of 4 floors with base-<br />

ment, with a total area of 3,500 m 2 .<br />

László Lehoczki, 45 years<br />

Project Manager<br />

Our task included shop drawings and general construc-<br />

tion, with a deadline of 7 February 2007. Debrecen is the<br />

third largest city in Hungary but the 230 km distance from<br />

Budapest was enough to make the integration with the<br />

local contractors and subcontractors difficult.<br />

Eniko ´ Köteles<br />

Corner” office building for Raiffeisen Real Estate (47,000 m 2 )<br />

while the second was for the construction of “Aréna Plaza”,<br />

the largest shopping and entertainment centre of central<br />

Europe with a total surface area of 186,000 m 2 .<br />

Following an initial design contract for the new Ergon fac-<br />

tory in Ploiesti, a decision was made in December <strong>2006</strong> to<br />

establish a presence in Romania.<br />

Nevertheless the most difficult task was to select the local<br />

subcontractors and make <strong>CFE</strong> known in that new area.<br />

Deadline and quality were a high priority for the client during<br />

the whole construction due to the fact that the opening of<br />

the new office building was fixed at the beginning. Moreover,<br />

our weekly time schedules were tracked in Texas.<br />

We handed over the project in due time to the satisfac-<br />

tion of both the client and the project architect. Thanks<br />

are due to the local subcontractors and, significantly, to<br />

the ‘spring-like’ winter. Personally I have been working on<br />

different projects at <strong>CFE</strong> for 11 years. Basically each<br />

project consists of similar modules but they are different<br />

in detail and have to be adapted according to the project<br />

needs. Every project brings an experience. Construction is<br />

a continuous study for me.<br />

Bernard Cols<br />

Péter Rapkay, Patrick Dubruille,<br />

Georgia Kacimbarisz, Pascal Steens,<br />

“Aréna Plaza”<br />

Shopping and<br />

Entertainement<br />

Centre.<br />

Design: Casiopea.<br />

4 7