(in millions of EUR) <strong>2006</strong> 2005<br />
Order book 33.4 19.8<br />
as of December 31<br />
Activity 32.5 15.1<br />
Both companies continued their respective growth in<br />
Hungary and Slovakia. The “Centre Point II” office building<br />
was delivered in the middle of <strong>2006</strong> to GTC and resulted in<br />
GTC winning the <strong>2006</strong> “Best Overall Development” prize.<br />
The first residential project, Corvinus Palace, was almost<br />
complete at the end of <strong>2006</strong>, as were the new office block<br />
of National Instruments in Debrecen, whose delivery was<br />
scheduled for February, 2007 and which was completed in a<br />
record time of eight months.<br />
In Slovakia, the “Park One” project was enclosed before<br />
winter, and a contract for tenant fit-out work was signed at<br />
the beginning of 2007, which will ensure continued activity<br />
in 2007.<br />
August <strong>2006</strong> was marked by the signing of two major<br />
contracts. The first was for the construction of the “Aréna<br />
In May <strong>2006</strong> <strong>CFE</strong> Hungary obtained the contract for the<br />
construction of the offices of National Instruments in<br />
Debrecen. This building comprise of 4 floors with base-<br />
ment, with a total area of 3,500 m 2 .<br />
László Lehoczki, 45 years<br />
Project Manager<br />
Our task included shop drawings and general construc-<br />
tion, with a deadline of 7 February 2007. Debrecen is the<br />
third largest city in Hungary but the 230 km distance from<br />
Budapest was enough to make the integration with the<br />
local contractors and subcontractors difficult.<br />
Eniko ´ Köteles<br />
Corner” office building for Raiffeisen Real Estate (47,000 m 2 )<br />
while the second was for the construction of “Aréna Plaza”,<br />
the largest shopping and entertainment centre of central<br />
Europe with a total surface area of 186,000 m 2 .<br />
Following an initial design contract for the new Ergon fac-<br />
tory in Ploiesti, a decision was made in December <strong>2006</strong> to<br />
establish a presence in Romania.<br />
Nevertheless the most difficult task was to select the local<br />
subcontractors and make <strong>CFE</strong> known in that new area.<br />
Deadline and quality were a high priority for the client during<br />
the whole construction due to the fact that the opening of<br />
the new office building was fixed at the beginning. Moreover,<br />
our weekly time schedules were tracked in Texas.<br />
We handed over the project in due time to the satisfac-<br />
tion of both the client and the project architect. Thanks<br />
are due to the local subcontractors and, significantly, to<br />
the ‘spring-like’ winter. Personally I have been working on<br />
different projects at <strong>CFE</strong> for 11 years. Basically each<br />
project consists of similar modules but they are different<br />
in detail and have to be adapted according to the project<br />
needs. Every project brings an experience. Construction is<br />
a continuous study for me.<br />
Bernard Cols<br />
Péter Rapkay, Patrick Dubruille,<br />
Georgia Kacimbarisz, Pascal Steens,<br />
“Aréna Plaza”<br />
Shopping and<br />
Entertainement<br />
Centre.<br />