(in millions of EUR) <strong>2006</strong> 2005<br />
Order book 5.8 12.4<br />
as of December 31<br />
Activity 24.0 15.2<br />
Geka Bouw’s sales reached historic levels in <strong>2006</strong>.<br />
“Design and construct” type projects are also increasing at<br />
Geka, especially in the industrial and special construction<br />
markets. For example, the terminal built for Vopak, the<br />
largest in Europe, was completed in record time and to the<br />
complete satisfaction of the customer.<br />
Among the major projects started in <strong>2006</strong>, the construc-<br />
tion of the “Spaanse Brug” in Rotterdam, the construc-<br />
tion of a dock and berths, including dredging, for Kaneb<br />
in Amsterdam, as well as the supply and installation of<br />
steel piles, each weighing 110 tons, in the Caland canal in<br />
Rotterdam should be mentioned. It should also be noted<br />
that the order book for 2007 includes the second phase<br />
of work started in <strong>2006</strong> for the floating moorings for riv-<br />
erboats in the middle of the Scheldt River, at Lillo, in the<br />
Antwerp harbour region.<br />
Niels Van Noort, 30 years<br />
Site Superintendent<br />
After graduating, I started at Geka Bouw in 1999 as a<br />
carpenter and then became an assistant superintendent<br />
and then a site superintendent. I am currently working<br />
on the “Fingerpier 4” project in Rotterdam, which is con-<br />
sidered to be the longest pier in Europe; it consists of a<br />
Once again, thanks to a judicious safety policy and strict<br />
adherence to it by all involved, no accidents were recorded<br />
in <strong>2006</strong>.<br />
The 2007 order book is full of high-quality projects. Geka’s<br />
future is therefore looking bright, and new equipment<br />
investments are planned for this year.<br />
concrete bridge with two loading ramps, a foundation on<br />
steel piles and a shock absorber to protect the pier. The<br />
pier is being built for the Rotterdam Port Authority and will<br />
be used by Vopak.<br />
André de Koning<br />
Hans Schutte, Marcel Keinhorst,<br />
Willem-Jan Nederlof<br />
Our greatest challenge in this project is its complexity,<br />
which requires inventiveness in marine construction to<br />
build it and therefore be proud of what we have created.<br />
A floating pontoon<br />
for river vessels in<br />
the middle of the<br />
Escaut, at Lillo.<br />
Design & Construct:<br />
Geka.<br />
4 5