(in millions of EUR) <strong>2006</strong> 2005<br />

Order book 5.8 12.4<br />

as of December 31<br />

Activity 24.0 15.2<br />

Geka Bouw’s sales reached historic levels in <strong>2006</strong>.<br />

“Design and construct” type projects are also increasing at<br />

Geka, especially in the industrial and special construction<br />

markets. For example, the terminal built for Vopak, the<br />

largest in Europe, was completed in record time and to the<br />

complete satisfaction of the customer.<br />

Among the major projects started in <strong>2006</strong>, the construc-<br />

tion of the “Spaanse Brug” in Rotterdam, the construc-<br />

tion of a dock and berths, including dredging, for Kaneb<br />

in Amsterdam, as well as the supply and installation of<br />

steel piles, each weighing 110 tons, in the Caland canal in<br />

Rotterdam should be mentioned. It should also be noted<br />

that the order book for 2007 includes the second phase<br />

of work started in <strong>2006</strong> for the floating moorings for riv-<br />

erboats in the middle of the Scheldt River, at Lillo, in the<br />

Antwerp harbour region.<br />

Niels Van Noort, 30 years<br />

Site Superintendent<br />

After graduating, I started at Geka Bouw in 1999 as a<br />

carpenter and then became an assistant superintendent<br />

and then a site superintendent. I am currently working<br />

on the “Fingerpier 4” project in Rotterdam, which is con-<br />

sidered to be the longest pier in Europe; it consists of a<br />

Once again, thanks to a judicious safety policy and strict<br />

adherence to it by all involved, no accidents were recorded<br />

in <strong>2006</strong>.<br />

The 2007 order book is full of high-quality projects. Geka’s<br />

future is therefore looking bright, and new equipment<br />

investments are planned for this year.<br />

concrete bridge with two loading ramps, a foundation on<br />

steel piles and a shock absorber to protect the pier. The<br />

pier is being built for the Rotterdam Port Authority and will<br />

be used by Vopak.<br />

André de Koning<br />

Hans Schutte, Marcel Keinhorst,<br />

Willem-Jan Nederlof<br />

Our greatest challenge in this project is its complexity,<br />

which requires inventiveness in marine construction to<br />

build it and therefore be proud of what we have created.<br />

A floating pontoon<br />

for river vessels in<br />

the middle of the<br />

Escaut, at Lillo.<br />

Design & Construct:<br />

Geka.<br />

4 5