The civil engineering department ended in June the project<br />

”rehabilitation of the Leien” in Antwerp in a joint venture<br />

with Van Wellen and Frateur de Pourcq. This project gave<br />

the “Leien” boulevards a major face-lift. To ease traffic<br />

near the National Bank, three tunnels and an underground<br />

car park for 650 cars, were built.<br />

MBG and the partners of the former joint venture obtained<br />

an additional contract “the demolition of the Iron Bridge”.<br />

This work, including the rehabilitation of the “Leien-<br />

Kipdorpbrug” intersection, was completed on time under<br />

a tight schedule.<br />

MBG and Dredging International have started the con-<br />

struction of the “Discharge sluice” in Kruibeke, while the<br />

renovation works on the Asper dam is ongoing.<br />

The construction works of the fourth tank of the gas ter-<br />

minal on behalf of Fluxys LNG is progressing according to<br />

schedule. On behalf of the Flemish Region, MBG in close<br />

collaboration with Geka, have built a jetty on the Scheldt<br />

River in Lillo.<br />

Due to a lack of major new projects, the revenue from civil<br />

engineering activities dropped significantly. Therefore MBG<br />

has taken this opportunity to considerably invest in the<br />

study of future major infrastructural projects initiated by<br />

the Flemish Region and Infrabel.<br />

Jef Ven, 45 years<br />

Foreman Carpenter<br />

From the beginning of my career I have worked for MBG, a<br />

company where I feel comfortable. The project “de Leien”<br />

was my largest project. Working on a project from start to<br />

finish is much more pleasant and satisfying than to arrive<br />

in the middle and have to leave before it is finished. Given<br />

the size of the project and the time required to complete it,<br />

I had the opportunity of meeting many colleagues. Some<br />

of them even retired during this project. There were also<br />

many new faces among the employees. Although the team<br />

was very young, my colleague, team leader Marcel De<br />

Sutter and myself have enough experience to correct and<br />

guide them during the execution phase.<br />

For the Oosterweel link in Antwerp, the THV Noriant<br />

consortium, of which MBG is part of, was chosen as the<br />

only remaining candidate to, introduce a Best and Final<br />

Offer (BAFO) that, if successful, should allow the group to<br />

be chosen as a “preferred bidder”<br />

MBG, as partner in joint ventures, is a candidate for the<br />

construction of the “ Diabolo” project (rail link to Zaventem<br />

Airport) and the Liefkenshoek rail link.<br />

As a result of this, MBG hopes that its order book will grow<br />

significantly in 2007 and the civil engineering activities will<br />

be guaranteed for the next years. Emphasis will then be<br />

placed on “construction-team” projects, industrial invest-<br />

ments and public-private partnership projects.<br />

I started with the “Amam” tunnel part, which is located<br />

beneath the Courthouse. My next mission was to build the<br />

underground car park located beneath the National Bank.<br />

I inherited this mission from my colleague, Julien Van den<br />

Heede, who had worked on the tunnel from the begin-<br />

ning and who is now enjoying a well-deserved retirement.<br />

This was a very difficult project because vehicle and bus<br />

traffic could not be interrupted, and the tram rails could<br />

not be moved easily. We weren’t able to see much daylight,<br />

which made some observers, particularly in the media,<br />

say that no work was occurring on the “de Leien” project.<br />

However, contrary to what was said, we were working very<br />

hard underground in order to meet the very strict schedule<br />

imposed on us.<br />

Fourth reservoir at<br />

the gas terminal for<br />

Fluxys LNG<br />

at Zeebrugge.<br />

Engineering:<br />

Tractebel<br />

Engineering.<br />

3 5