05.02.2013 Views

CFE - 2006 annual report - Vinci

CFE - 2006 annual report - Vinci

CFE - 2006 annual report - Vinci

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3 0<br />

Koen Vande Voorde, 37 years<br />

Site Superintendent<br />

I started with ABEB as a skilled carpenter. Over time, I was<br />

promoted to qualified foreman and now, for the past two<br />

and a half years, I am a works superintendent.<br />

The “Stadsfeestzaal” project, on which I am responsible<br />

for the conversion works on the “Meir” building, is a chal-<br />

lenge, because the conversions are exceptional in every<br />

sense. When completed, we will have created three new<br />

floors under the four existing floors. Everyone has to be<br />

extra careful and alert at all times to guarantee the safety<br />

that is challenged by the short construction period and the<br />

level of difficulty.<br />

A second challenge is coordinating the different construc-<br />

tion methods that are being applied simultaneously in<br />

different areas of the building, given that the building is<br />

the only access point to the large festival hall which is in its<br />

finishing stage. Strict engagements have to be respected<br />

conscientiously given the variety of subcontractors working<br />

together side-by-side.<br />

For years, my motivation has remained the same: to create<br />

a building that every one can be proud of, whilst ensuring<br />

as few accidents as possible. I hope that in the years to<br />

come I will be able to build other projects with my friends<br />

and colleagues, and meet new challenges.<br />

By early 2009, all wastewater produced in the Liège urban<br />

area will be treated. In fact, we are building the last waste-<br />

water treatment plant, but definitely not the least as it is<br />

the second largest in the Liège urban area (200.000 P.E.).<br />

This is the Liège-Sclessin station. It is the result of fruitful<br />

internal collaboration during bidding between <strong>CFE</strong> EcoTech<br />

and Bageci in a joint venture with other partners.<br />

This wastewater treatment plant, which we can all be<br />

proud of, has allowed me to meet three personal chal-<br />

lenges as a responsible of “process” engineering within<br />

<strong>CFE</strong> EcoTech. Firstly, prepare and successfully complete<br />

the building permit application dossier. Secondly, manage<br />

the “process” design of the wastewater treatment plant<br />

and the compact integration of the main equipment in a<br />

closed, highly complex building. And finally, create a quality<br />

dossier within the limits of the budget allocated for “proc-<br />

ess” design and in the global interest of the association.<br />

More than 28 years of experience in the wastewater treat-<br />

ment business, including 8 at <strong>CFE</strong>, don’t allow me to hide<br />

my so-called “respectable” age of 58, which in no way<br />

lessens my enthusiasm and motivation for other major<br />

projects in the future.<br />

Pierre Dulière, 58 years<br />

Engineering Manager<br />

C F E A N N U A L R E P O R T 2 0 0 6 I 1 2 6 t h C F E A N N U A L R E P O R T 2 0 0 6 I c o r p o r a t e f i n a n c i a l y e a r<br />

1 2 6 t h c o r p o r a t e f i n a n c i a l y e a r

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!